Tom Adams Bridge Structural Repairs
Project Information
- Bid Title
- Tom Adams Bridge Structural Repairs
- Issuing Agency
- Charlotte County
- Location
- Florida
- Published Date
- Apr 8, 2026
- Closing Date
- Apr 29, 2026
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- 26-369
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
File No:
26-369
Description:
Tom Adams Bridge Structural Repairs
Contact:
stacey.trowbridge@charlottecountyfl.gov
File number:
20260369
Due Date:4/29/2026 2:00:00 PMNotice:Package:Registered Vendors Notified:Presubmittal Sign-in:Tabulation:Recommendation:Commodity Codes:
91300, 91313, 91366, 95900, 95935, 95990
- Attachment Preview
-
COUNTY OF CHARLOTTEPURCHASING DIVISIONCharlotte County Administration Center18500 Murdock CirclePort Charlotte, Florida 33948-1094(941) 743-1378TO:PROSPECTIVE BIDDERSDATE:APRIL 8, 2026RE:ADDENDUM #3 - BID NO. 20260369 – TOM ADAMS BRIDGE STRUCTURAL REPAIRSBID OPENING DATE: 2:00 p.m. (EST) APRIL 29, 2026Bidders are hereby notified that this Addendum shall be made a part of the documents. The intent is to add to, modify, orclarify the documents. Should any of these items have an effect on price, such changes shall be included in the price bid.These items have the same force and effect as if contained in the original.ITEM 1:QUESTION/ANSWERQ1. Pay item 457-70-99 Pile Jacket Repairs is listed as 1 LS. Given we don’t know how many jackets, how long thejackets are, the existing conditions, please clarify the intent of this line item? Is it only to perform a survey anddocumentation?A1. Correct, this pay items covers inspection, design of potential repairs, and labor/materials for potential repairs.Q2. Scope of Work #16 calls out 64 total pile clusters replacing wire rope. Plan shows (40) 2-pile clusters, and (24)3-pile clusters. Is this correct?A2. Correct, 32 clusters per fender.Q3. Can we get the 2005 rehab plans for the Grid Deck Repair called out in plans? Also, the 2018 As-Builts and latestInspection report identifying Girder/Span location identification.A3. This information is provided in Addenda #2.Q4. How long are the 8”x8” spacer blocks for the wales? Plans do not call out length.A4. The spacer blocks shall be 1’-0” in length to match existing plans.Q5. Can we get the called out 2024 Underwater Inspection Report to verify locations of backfill leakage requiringrepairs with Flowable Fill?A5. This information is provided in Addenda #2.Q6. Can you verify the length of the securement bolts for the 3rd and the top row of wales shown in Section A-A onSheet B1-21 due to possible replacement specified in Scope of Work #16?A6. Contractor shall ensure the bolts pass through existing/proposed waler beam/blocking and through existing piles asshown. Estimated length for top row bolt is 25” (10” waler + 10” pile + 3” blocking behind pile + cover). Estimated length for 3rdrow bolt is 32” (10” waler + 10” pile + 10” waler + cover).Q7. Splice plates for wales, nothing is specified or called out in the plans regarding replacement. If we are replacing,are we to use the FDOT Standard Splice Plate from Standard Plans 471-030, pg 5 of 7?A7. Intent is to match existing condition, which does not include splice plates.Q8. The detail drawings of the pile clusters in this project significantly differ from the standard FDOT plans 471-030. Dowe base off the detail drawings in the plans or from FDOT standards?A8. The intention is to repair the fender system components in kind. See Note 7C on sheet B1-04 of plans. Use details andnotes provided in plans for repair.Q9. The plans call for 7/8” SS bolts, whereas FDOT 471-030 specs 1’ threaded rod, washers, and locking nuts. Do wego with plans spec call-out for sizing, or FDOT?A9. The intention is to repair the fender system components in kind. See Note 7C on sheet B1-04 of plans and Repair Note 4on sheet B1-20. Use details and notes provided in plans for repair.Q10. Anchor bolts are called out in Pay Items but are only mentioned in plans in the use of GWWF. Is this the onlyplace utilizing the anchor bolts?A10. No, anchor bolts are also to be utilized in the replacement of existing, corroded anchor bolts at movable bearings inflanking and approach spans, refer to Scope Items 18C and 19C on sheet B1-10 of the Plans.This addendum is binding and is to be considered as if contained within the original bid documents of Bid No. 20260369.Bidders are required to acknowledge receipt of this addendum on their bid forms.Kimberly A. Corbett, C.P.M., CPPBSenior Division Manager-PurchasingKAC/st
- Commodity Codes
-
- NAICS 237310Highway, Street, and Bridge Construction
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
BID 25-26-12 51ST YEAR CDBG D...
SOLICITATION DOCUMENTS: BID 25-26-12 51ST YEAR CDBG DRAINAGE IMPROVEMENTS EXHIBIT A - BID
City of Hanllandale Beach
Bid Due: 7/16/2026
Florida National Cemetery, Na...
Follow Florida National Cemetery, National Shrine Turfgrass Renovation Project Active Contract Opportunity Notice
VETERANS AFFAIRS, DEPARTMENT OF