SO-1849 FS Equipment Addendum 2
Project Information
- Bid Title
- SO-1849 FS Equipment Addendum 2
- Issuing Agency
- Lansing School District
- Location
- Michigan
- Published Date
- Mar 6, 2026
- Closing Date
- Mar 12, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
- SO-1849 FS Equipment Addendum 2
- Attachment Preview
-
LANSING SCHOOL DISTRICT2026 SINKING FUND PROJECTFOOD SERVICE EQUIPMENT PROJECTSADDENDUM 2CM Clarification:• There are no food service equipment demolition drawings available, so bidders must include the followingallowances in their bid for equipment demolition and removal:1. Dwight Rich Demolition Allowance:$7,500.002. Ebersole Center Demolition Allowance:$3,000.003. Gardner Elementary Demolition Allowance: $10,000.00ADDENDUM 2PAGE 1 OF 1LSD Dwight Rich Food ServiceBid Pack 1, Addendum No. 2Narrative of ChangesProject Name:ProjectLocation:Owner/Client:Issued to:City/State:Dwight Rich Food Service –Equipment Replacement &Renovation2600 Hampden, Lansing,MI 48911Lansing School DistrictDate:Architect’s Project #:Attention:March 4, 202625015928ADavid BeckeringBeckering ConstructionGrand Rapids, MIEmail:Zip:djb@beckering.com49548Delivered via:☐ Messenger ☐ Hand-carried Address☐ Express ☐ Pick-upSent to:☐ Mail☐ UPS☐ Newforma☒ Email☐ FTPThis Addendum revises the Contract Documents and shall have the same force and effect;make the following changes to the Specifications and Drawings for this project. The followingis a written summary of the changes made by this Addendum. Strict attention should begiven to the Drawings and Specifications for area take-off, quantities and items deleted orrevised herein. This addendum forms a part of the Contract Documents.Issued by CED by:Prepared by:Distribution:Courtney NorrisCourtney NorrisDate Signed:Date Signed:03/04/202603/04/2026Below is a list of the changes made to our documents in response to the comments, RFIs, orclarifications provided prior to Bid. Please feel free to reach out with any further questions orclarifications in a timely manner.Sincerely,Courtney NorrisLSD Dwight Rich Food Service – Bid Pack 1, Addendum No. 2 – Narrative of ChangesPage 1 | 2Changes to Drawings & Specifications• Sheet FSE-1 is being reissued.• Item #104 – Portable Table – Qty. of 5 – Quantity should be a Qty. of 4 in lieu of a Qty. of 5.• Item #202 – Cook’s Table - Qty. of 1 – Should be listed as Item #201 on the plans and in thespecifications.• Item #202A – Cook’s Table Filter - Qty. of 1 – Should be listed as Item #201A on the plans andin the specifications.• Item #502 - Disposer - Qty. of 1 – Unit has been removed from the scope of work.• Item #503 - Dishwasher Hood – Qty. of 1 – Unit has been removed from the scope of work.• Item #504 - Clean Dish Table - Qty. of 1 – Unit has been removed from the scope of work.• Item #504A - Soiled Dish Table - Qty. of 1 – Unit has been removed from the scope of work.• Item #505 – Water Softener & Filtration- Qty. of 1 – Unit has been removed from the scope ofwork.• Item #506 – Dishwasher – Qty. of 1 – Unit has been removed from the scope of work.• Item #506A – Drain Water Tempering Kit – Qty. of 1 – Unit has been removed from the scopeof work.ATTACHMENTSReissued Drawings:FSE-1END OF ADDENDUM NO. 2LSD Dwight Rich Food Service – Bid Pack 1, Addendum No. 2 – Narrative of ChangesPage 2 | 2Item101102102AQty DESCRIPTION4 PORTABLE TABLE1 ICE MAKER W/ BIN1 ICE MAKER FILTEREQUIPMENT SCHEDULEINDIRECT DIRECTEXHCW (in) HW (in) DRAIN DRAIN (IN) GAS (in) MBTUH DUCTEXHCFMMUADUCTMUAAmpsCFM Volts Ph loadEquipment RemarksS.S. UNDERSHELF & CASTERS020.5FL SK20815.9 PIPE CW THRU FILTER THEN TO ICE MAKER0.5PIPE CW THRU FILTER THEN TO ICE MAKER201 1 COOK'S TABLE201A 1 COOK'S TABLE FILTER0.50.5FL SK0.5PIPE CW THRU FILTER THEN TO COOK'S TABLEPIPE CW THRU FILTER THEN TO COOK'S TABLE301 1 SPARE NUMBER302 2 CONVECTION OVEN - DOUBLE DECK303 1 FREEZER304 1 REFRIGERATOR305 1 REFRIGERATOR2083(2) 34.0120111.212014.912018.4401402403404404A4054064072 HOT FOOD TABLE2 UTILITY COUNTER2 COLD FOOD TABLE2 DROP-IN FROST TOP2 SNEEZE GUARD1 MILK COOLER2 CASHIER COUNTER2 CASH REGISTER/POS - BY OWNER0.5FL SKFL SK120/208 11201120112011201120128.49.52.41.03.310.0 DEDICATED CIRCUIT & DATA501 1 SPARE NUMBER0234"10"30"14 GA. 304 STAINLESS STEEL TOP AS PER PLAN20" X 20" X 5" ROLLER BEARINGSTAINLESS STEEL DRAWERSTAINLESS STEEL LEGS & GUSSETS18 GA. 304 STAINLESS STEEL UNDERSHELF5" LOCKING CASTERSTYPICAL PORTABLE TABLESECTION - ITEM #101SCALE: 1/2" = 1'-0"02ENTERCAFETERIAEXITEXITENTER02DISHWASHING101101401404404A 402403406405406403402 404A40440140740701102A 10230502304201A201303COOKCOOK302302101101OFFICEFREEZERCOOLERSTORAGECANSFOODSERVICEDESIGN BY:Food ServiceConsultantsJRA FOOD SERVICE CONSULTANTS, LLC401 HALL STREET SW - SUITE 185HGRAND RAPIDS, MI 49503PH: (616) 454-4433ADJUSTABLE GLASS TOP - BY FSECNSF-2 - Z-GUARD SNEEZE GUARDBRUSHED ALUMINUM FINISH BY FSECLIGHTS & HEAT LAMPS FACTORY WIREDTO FACTORY MOUNTED JUNCTION BOXSTAINLESS STEEL TOPFACTORY MOUNTED CONTROLSWIRED TO JUNCTION BOX BYBY COUNTER MFGR.DROP-IN FROST TOPBY FSECOPEN REAR5" LOCKING CASTERSADJUSTABLE GLASS FRONT - BY FSECGROMMET THRU COUNTER BY FSECINTERIOR BRACING FOR SNEEZE GUARDSTAINLESS STEEL TRAY SLIDEWITH HINGED BRACKETSPLAM FRONTSELECTED BY ARCHITECTELECTRICAL JUNCTION BOX OR RECEPTACLEFACTORY INSTALLED BY COUNTER MFGR.ELECTRICAL CONDUITSTAINLESS STEEL KICK PLATETYPICAL COUNTER SECTIONSCALE: 1/2" = 1'-0"DETAIL IS FOR CONSTRUCTION PURPOSES.ALL TRADES TO VERIFY REQUIREMENTSWITH MANUFACTURER'S SHOP DRAWINGSADJUSTABLE SNEEZE GUARDSGLASS TOPSTAINLESS STEEL TRAY SLIDEWITH HINGED BRACKETSPLASTIC LAMINATE FRONTSSTAINLESS STEEL TOPHOT WELLS WITH DRAINS5" LOCKING CASTERSTYPICAL HOT FOOD TABLESECTION - ITEM #401SCALE: 1/2" = 1'-0"ADJUSTABLE SNEEZE GUARDSGLASS TOPSTAINLESS STEEL TRAY SLIDEWITH HINGED BRACKETSPLASTIC LAMINATE FRONTSSTAINLESS STEEL TOPCOLD PAN5" LOCKING CASTERSTYPICAL COLD FOOD TABLESECTION - ITEM #403SCALE: 1/2" = 1'-0"NOTE:1. VERIFY ROUGHIN REQUIREMENTS FORFUTURE, PURVEYOR SUPPLIED, OWNERS RELOCATEDEQUIPMENT, OWNER SUPPLIED EQUIPMENT, ETC.2. REUSE EXISTING ROUGHINSWHERE APPLICABLE.3. DISCONNECT, REMOVE, STORE & RECONNECTANY EXISTING EQUIPMENT AS REQUIREDFOR CONSTRUCTION PURPOSES.4. EQUIPMENT NOT BEING REUSED TO BE DISCONNECTEDAND STORED OR DISCARDEDAS DIRECTED BY OWNER.5. EQUIPMENT DESIGNATED AS RELOCATED SHALLBE DISCONNECTED ANDRELOCATED AS PER PLANS AND SPECIFICATIONS.DATECODE02/13/26LSDDR2FP02/23/26LSDDR3FP03/09/26LSDDR4FPPROJECTBYPHASEBIDSBRFOOD SERVICEADDENDUM 01 JRFOOD SERVICEADDENDUM 02 JRTHIS DRAWING IS THE PROPERTYOF JRA FOOD SERVICE CONSULTANTS, LLCAND IS NOT TO BEREPRODUCED, OR REUSED WITHOUTWRITTEN PERMISSIONCOPYRIGHT 2026SHEET NUMBER:FSE-1
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
C-130, C-17 and C-5 Solid Sta...
Follow C-130, C-17 and C-5 Solid State Cockpit Voice Recording (SSCVR) and Solid
Federal Agency
Bid Due: 7/31/2026
Cone Penetrometer Test Soundi...
Description: Cone Penetrometer Test Sounding Unit, Truck Mounted Department: Transportation Buyer: RUTH THOLE
State of Michigan
Bid Due: 7/16/2026