SO-1849 FS Equipment Addendum 2

Project Information

Bid Title
SO-1849 FS Equipment Addendum 2
Issuing Agency
Lansing School District
Location
Michigan
Published Date
Mar 6, 2026
Closing Date
Mar 12, 2026
Government Level
State & Local
Status
Closed
Original Source
Join to Access Full Details
Attachment Preview
LANSING SCHOOL DISTRICT
2026 SINKING FUND PROJECT
FOOD SERVICE EQUIPMENT PROJECTS
ADDENDUM 2
CM Clarification:
There are no food service equipment demolition drawings available, so bidders must include the following
allowances in their bid for equipment demolition and removal:
1. Dwight Rich Demolition Allowance:
$7,500.00
2. Ebersole Center Demolition Allowance:
$3,000.00
3. Gardner Elementary Demolition Allowance: $10,000.00
ADDENDUM 2
PAGE 1 OF 1
LSD Dwight Rich Food Service
Bid Pack 1, Addendum No. 2
Narrative of Changes
Project Name:
Project
Location:
Owner/Client:
Issued to:
City/State:
Dwight Rich Food Service –
Equipment Replacement &
Renovation
2600 Hampden, Lansing,
MI 48911
Lansing School District
Date:
Architect’s Project #:
Attention:
March 4, 2026
25015928A
David Beckering
Beckering Construction
Grand Rapids, MI
Email:
Zip:
djb@beckering.com
49548
Delivered via:
Messenger Hand-carried Address
Express Pick-up
Sent to:
Mail
UPS
Newforma
Email
FTP
This Addendum revises the Contract Documents and shall have the same force and effect;
make the following changes to the Specifications and Drawings for this project. The following
is a written summary of the changes made by this Addendum. Strict attention should be
given to the Drawings and Specifications for area take-off, quantities and items deleted or
revised herein. This addendum forms a part of the Contract Documents.
Issued by CED by:
Prepared by:
Distribution:
Courtney Norris
Courtney Norris
Date Signed:
Date Signed:
03/04/2026
03/04/2026
Below is a list of the changes made to our documents in response to the comments, RFIs, or
clarifications provided prior to Bid. Please feel free to reach out with any further questions or
clarifications in a timely manner.
Sincerely,
Courtney Norris
LSD Dwight Rich Food Service – Bid Pack 1, Addendum No. 2 – Narrative of Changes
Page 1 | 2
Changes to Drawings & Specifications
Sheet FSE-1 is being reissued.
Item #104 – Portable Table – Qty. of 5 – Quantity should be a Qty. of 4 in lieu of a Qty. of 5.
Item #202 – Cook’s Table - Qty. of 1 – Should be listed as Item #201 on the plans and in the
specifications.
Item #202A – Cook’s Table Filter - Qty. of 1 – Should be listed as Item #201A on the plans and
in the specifications.
Item #502 - Disposer - Qty. of 1 – Unit has been removed from the scope of work.
Item #503 - Dishwasher Hood – Qty. of 1 – Unit has been removed from the scope of work.
Item #504 - Clean Dish Table - Qty. of 1 – Unit has been removed from the scope of work.
Item #504A - Soiled Dish Table - Qty. of 1 – Unit has been removed from the scope of work.
Item #505 – Water Softener & Filtration- Qty. of 1 – Unit has been removed from the scope of
work.
Item #506 – Dishwasher – Qty. of 1 – Unit has been removed from the scope of work.
Item #506A – Drain Water Tempering Kit – Qty. of 1 – Unit has been removed from the scope
of work.
ATTACHMENTS
Reissued Drawings:
FSE-1
END OF ADDENDUM NO. 2
LSD Dwight Rich Food Service – Bid Pack 1, Addendum No. 2 – Narrative of Changes
Page 2 | 2
Item
101
102
102A
Qty DESCRIPTION
4 PORTABLE TABLE
1 ICE MAKER W/ BIN
1 ICE MAKER FILTER
EQUIPMENT SCHEDULE
INDIRECT DIRECT
EXH
CW (in) HW (in) DRAIN DRAIN (IN) GAS (in) MBTUH DUCT
EXH
CFM
MUA
DUCT
MUA
Amps
CFM Volts Ph load
Equipment Remarks
S.S. UNDERSHELF & CASTERS
02
0.5
FL SK
208
1
5.9 PIPE CW THRU FILTER THEN TO ICE MAKER
0.5
PIPE CW THRU FILTER THEN TO ICE MAKER
201 1 COOK'S TABLE
201A 1 COOK'S TABLE FILTER
0.5
0.5
FL SK
0.5
PIPE CW THRU FILTER THEN TO COOK'S TABLE
PIPE CW THRU FILTER THEN TO COOK'S TABLE
301 1 SPARE NUMBER
302 2 CONVECTION OVEN - DOUBLE DECK
303 1 FREEZER
304 1 REFRIGERATOR
305 1 REFRIGERATOR
208
3
(2) 34.0
120
1
11.2
120
1
4.9
120
1
8.4
401
402
403
404
404A
405
406
407
2 HOT FOOD TABLE
2 UTILITY COUNTER
2 COLD FOOD TABLE
2 DROP-IN FROST TOP
2 SNEEZE GUARD
1 MILK COOLER
2 CASHIER COUNTER
2 CASH REGISTER/POS - BY OWNER
0.5
FL SK
FL SK
120/208 1
120
1
120
1
120
1
120
1
120
1
28.4
9.5
2.4
1.0
3.3
10.0 DEDICATED CIRCUIT & DATA
501 1 SPARE NUMBER
02
34"
10"
30"
14 GA. 304 STAINLESS STEEL TOP AS PER PLAN
20" X 20" X 5" ROLLER BEARING
STAINLESS STEEL DRAWER
STAINLESS STEEL LEGS & GUSSETS
18 GA. 304 STAINLESS STEEL UNDERSHELF
5" LOCKING CASTERS
TYPICAL PORTABLE TABLE
SECTION - ITEM #101
SCALE: 1/2" = 1'-0"
02
ENTER
CAFETERIA
EXIT
EXIT
ENTER
02
DISHWASHING
101
101
401
404
404A 402
403
406
405
406
403
402 404A
404
401
407
407
01
102A 102
305
02
304
201A
201
303
COOK
COOK
302
302
101
101
OFFICE
FREEZER
COOLER
STORAGE
CANS
FOODSERVICE
DESIGN BY:
Food Service
Consultants
JRA FOOD SERVICE CONSULTANTS, LLC
401 HALL STREET SW - SUITE 185H
GRAND RAPIDS, MI 49503
PH: (616) 454-4433
ADJUSTABLE GLASS TOP - BY FSEC
NSF-2 - Z-GUARD SNEEZE GUARD
BRUSHED ALUMINUM FINISH BY FSEC
LIGHTS & HEAT LAMPS FACTORY WIRED
TO FACTORY MOUNTED JUNCTION BOX
STAINLESS STEEL TOP
FACTORY MOUNTED CONTROLS
WIRED TO JUNCTION BOX BY
BY COUNTER MFGR.
DROP-IN FROST TOP
BY FSEC
OPEN REAR
5" LOCKING CASTERS
ADJUSTABLE GLASS FRONT - BY FSEC
GROMMET THRU COUNTER BY FSEC
INTERIOR BRACING FOR SNEEZE GUARD
STAINLESS STEEL TRAY SLIDE
WITH HINGED BRACKETS
PLAM FRONT
SELECTED BY ARCHITECT
ELECTRICAL JUNCTION BOX OR RECEPTACLE
FACTORY INSTALLED BY COUNTER MFGR.
ELECTRICAL CONDUIT
STAINLESS STEEL KICK PLATE
TYPICAL COUNTER SECTION
SCALE: 1/2" = 1'-0"
DETAIL IS FOR CONSTRUCTION PURPOSES.
ALL TRADES TO VERIFY REQUIREMENTS
WITH MANUFACTURER'S SHOP DRAWINGS
ADJUSTABLE SNEEZE GUARDS
GLASS TOP
STAINLESS STEEL TRAY SLIDE
WITH HINGED BRACKETS
PLASTIC LAMINATE FRONTS
STAINLESS STEEL TOP
HOT WELLS WITH DRAINS
5" LOCKING CASTERS
TYPICAL HOT FOOD TABLE
SECTION - ITEM #401
SCALE: 1/2" = 1'-0"
ADJUSTABLE SNEEZE GUARDS
GLASS TOP
STAINLESS STEEL TRAY SLIDE
WITH HINGED BRACKETS
PLASTIC LAMINATE FRONTS
STAINLESS STEEL TOP
COLD PAN
5" LOCKING CASTERS
TYPICAL COLD FOOD TABLE
SECTION - ITEM #403
SCALE: 1/2" = 1'-0"
NOTE:
1. VERIFY ROUGHIN REQUIREMENTS FOR
FUTURE, PURVEYOR SUPPLIED, OWNERS RELOCATED
EQUIPMENT, OWNER SUPPLIED EQUIPMENT, ETC.
2. REUSE EXISTING ROUGHINS
WHERE APPLICABLE.
3. DISCONNECT, REMOVE, STORE & RECONNECT
ANY EXISTING EQUIPMENT AS REQUIRED
FOR CONSTRUCTION PURPOSES.
4. EQUIPMENT NOT BEING REUSED TO BE DISCONNECTED
AND STORED OR DISCARDED
AS DIRECTED BY OWNER.
5. EQUIPMENT DESIGNATED AS RELOCATED SHALL
BE DISCONNECTED AND
RELOCATED AS PER PLANS AND SPECIFICATIONS.
DATE
CODE
02/13/26
LSDDR2FP
02/23/26
LSDDR3FP
03/09/26
LSDDR4FP
PROJECT
BY
PHASE
BIDS
BR
FOOD SERVICE
ADDENDUM 01 JR
FOOD SERVICE
ADDENDUM 02 JR
THIS DRAWING IS THE PROPERTY
OF JRA FOOD SERVICE CONSULTANTS, LLC
AND IS NOT TO BE
REPRODUCED, OR REUSED WITHOUT
WRITTEN PERMISSION
COPYRIGHT 2026
SHEET NUMBER:
FSE-1
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.

Government Bids

Empower Your Bidding Strategy

Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.

  • Access an extensive database of bids, including comprehensive local and state opportunities.
  • Receive customized alerts for the bids that matter most to your business.
  • Explore detailed specifications to ensure precise and competitive submissions.
  • Gain a competitive edge with up-to-date information and exclusive opportunities.

See Also

C-130, C-17 and C-5 Solid Sta...

Follow C-130, C-17 and C-5 Solid State Cockpit Voice Recording (SSCVR) and Solid

Federal Agency

Bid Due: 7/31/2026

Cone Penetrometer Test Soundi...

Description: Cone Penetrometer Test Sounding Unit, Truck Mounted Department: Transportation Buyer: RUTH THOLE

State of Michigan

Bid Due: 7/16/2026