Construction Services for I-30 Admin Facility Addendum #03 -? City Comment Responses & Drawings
Project Information
- Bid Title
- Construction Services for I-30 Admin Facility Addendum #03 -? City Comment Responses & Drawings
- Issuing Agency
- Hunt County
- Location
- Texas
- Published Date
- Nov 21, 2025
- Closing Date
- Dec 2, 2025
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- #268-26
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Bid/RFP# Description Due Date #268-26 Addendum #03 - City Comment Responses & Drawings - Attachment Preview
-
November 21, 2025City of GreenvilleAttn: Ramia Wilson2315 Johnson StreetGreenville, TX 75402Re: Hunt County Administration Building – Response to City Permit Review CommentsPermit Number: COM-25-0064Dear Ramia,Please find the outline below detailing the Design Team’s response to Plan Review Comments provided by city review staff. Anynecessary drawing or document changes have been described along with their corresponding response.Engineering – Michael Viloria- C6 – Taps, sleeves, and gate valves need to be whole numbers i.e. either 2” or 3”.o Civil Response: Sheet C6 has been revised to comply. Refer to Addendum 03 Drawings.- C6 – All sewer lines 6” or larger need a manhole.o Civil Response: Our 8” sewer main has manholes, the rest are 4” services and no change is required.- Overall Comments: Call City Engineering Department (214) 620-6001 48 hours prior to starting work. Install all erosioncontrol Per City Code. It is unlawful to build structures or fences in the floodplain outside of City Code requirements.Contact the City of Greenville for water, sewer, and storm sewer locates. For water and sewer and 903.457.3153 forstorm sewer to verify that there are no water, sewer or storm lines within the property prior to construction. Grade todrain to street. Do not drain onto adjacent properties. No buildings can be within the building setback lines.o Civil Response: UnderstoodFire – Todd Morgan- Sprinkler and Alarm plans will need to be submitted to Fire for separate permit after 3rd party review.o GHC Response: Understood. Will comply.GEUS – Michael McCloud- An application for Distributed Generation or Backup Power Source with GEUS is required to approve this permit. Pleasefill out the application found at: https://www.geus.org/184/Renewable-Energy- Email the completed application to customergen@geus.org.- When submitting your application, please include the required documents listed in the application instructions.o GHC Response: The completed form and supporting documents were sent to David Weatherbee and JonathanMemmer at the email address above on 11/18/2025.End of Comment ResponsesSincerely,Ben Marshall, AIAPartner | Grace Design Studios2ADDENDUM 03 – NARRATIVE OF CHANGESHUNT COUNTY GOVERNMENT BUILDINGGreenville, TexasGHC Project #:4023108Date: November 13, 2025TO ALL CONTRACTORS:This Addendum is hereby made a part of the Permit Drawings dated 5 December 2024.The following items shall be considered part of the contract documents. Changes made byAddendum shall take precedence over Original Documents. Any changes, which may affectconstruction or proper installation of materials, equipment, or fixtures, not specifically mentionedin this Addendum, shall be brought to the attention of the Architect as soon as possible. ThePrime Contractor is hereby advised to call attention of all subcontractors to changes, which mayaffect their work.DRAWINGSG001 – DRAWING INDEX + GENERAL INFORMATIONa. Updated Sheet IndexCIVILC6 – UTILITY PLANa. Revised water utility components to whole numbers to address city comment.End of NarrativeGrace Hebert Curtis Architects, LLCGENERAL1. ARCHITECTURAL DOCUMENTS SHALL BE COORDINATED WITH ALL OTHERDISCIPLINES’ DOCUMENTS. ANY DISCREPANCY BETWEEN THESEDOCUMENTS SHOULD BE REPORTED TO THE ARCHITECT FORCLARIFICATION AND VERIFICATION PRIOR TO PROCUREMENT ORINSTALLATION OF AFFECTED WORK.2. DETAILS NOT SHOWN ARE SIMILAR IN CHARACTER TO THOSE DETAILED.WHERE SPECIFIC DIMENSIONS, DETAILS OR DESIGN INTENT CANNOT BEDETERMINED, CONSULT THE ARCHITECT BEFORE PROCEEDING WITHAFFECTED WORK.3. PROTECT ALL MATERIALS, CONSTRUCTION, UTILITIES AND FACILITIES FROMDAMAGE, INCLUDING BUT NOT LIMITED TO CONSTRUCTION ACTIVITIES,THEFT, MOISTURE, AND WEATHER. DAMAGED ELEMENTS AND CONDITIONSSHALL BE REPAIRED / REPLACED AT NO COST TO OWNER.4. DO NOT SCALE ANY DRAWINGS IN ANY OF THE DOCUMENTS FOR FIELDLAYOUT. CONTACT ARCHITECT IF DIMENSIONS ARE NEEDED AND CANNOTBE FOUND IN WRITING IN THE DOCUMENTS.5. UNLESS NOTED OTHERWISE DIMENSIONS IN THE DOCUMENTS ARE ASLISTED BELOW.A. DIMENSIONS ARE TAKEN FROM FACE OF STUD OR CENTERLINE OF STUD/ COLUMN UNLESS OTHERWISE NOTED.B. "CLEAR" REFERS TO DIMENSION BETWEEN FACES OF FINISH SURFACES.C. "EQ" OR "EQUAL" INDICATES DIMENSION TO MATCH ADJACENT.LETTERED DIMENSIONS (A,B,C,D,ETC.) INDICATE DIMENSION TO MATCHOPPOSITE OR REMOTE (MATCHING LETTER) DIMENSION.D. "+/-" INDICATES APPROXIMATE DIMENSION BASED ON FIELD CONDITIONOR FLEXIBLE DIMENSION THAT CAN BE ADJUSTED.E. DIMENSIONS ON REFLECTED CEILING PLANS AND LIGHTING PLANS ARECLEAR DIMENSIONS.F. DIMENSIONS ON INTERIOR DESIGN SHEETS ARE TO FACE OF FINISHEDSURFACE.6. INFORMATION ON G SHEETS IS INTENDED TO BE TYPICAL. SOMEINFORMATION SHOWN MAY NOT BE RELEVANT TO PROJECT SPECIFICS.REVIEW THE DOCUMENTS AND CONFIRM IN WRITING WITH DESIGN TEAMWHICH INFORMATION IS NOT RELEVANT TO PROJECT SPECIFICS PRIOR TOTHE START OF CONSTRUCTION.7. REFER TO LEGENDS, SCHEDULES, AND KEYNOTES ON INDIVIDUAL SHEETSFOR SPECIFIC INFORMATION8. HOLD ALL PIPES, CONDUIT, BRANCH LINES, ETC. AS CLOSE TO THEUNDERSIDE OF STRUCTURE AS POSSIBLE. USE LOW PROFILE HANGERSWHERE POSSIBLE.9. TEMPORARY SHORING AS REQUIRED DURING DEMOLITION ANDCONSTRUCTION SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.10. PROVIDE ACCESS PANELS AT WALLS AND CEILINGS FOR: FIRE/SMOKEDAMPERS, VAV BOXES, PLUMBING CLEANOUTS, ELECTRIC HEATERS, AIRHANDLING UNITS/MECHANICAL EQUIPMENT, VALVES, FILTER BOXES ANDOTHER CONCEALED ITEMS REQUIRING ACCESS. COORDINATE WITHARCHITECT IN FIELD FOR INSTALLATION OF ACCESS PANELS WHEREREQUIRED AND NOT GRAPHICALLY SHOWN ON PLANS.11. ASBESTOS ABATEMENT, LEAD PAINT REMOVAL, AND OTHER HAZARDOUSMATERIAL REMOVAL IS NOT IN THE CONTRACT. SHOULD THE CONTRACTORENCOUNTER THE PRESENCE, OR POSSIBLE PRESENCE, OF POTENTIALLYHAZARDOUS MATERIALS, THE CONTRACTOR SHALL NOTIFY THE OWNER FORINSTRUCTIONS PRIOR TO CONTINUING WORK.12. BUILDINGS SHALL BE PROVIDED IN WEATHERPROOF AND SECURECONDITION AS EARLY AS POSSIBLE AND MAINTAINED THROUGHOUT WORK.13. ALL EXISTING SANITARY SEWER MANHOLE TOPS, WATER VALVE BOXES,METERS, STORM SEWERS, OR OTHER RELATED APPURTENANCES SHALL BEADJUSTED TO FINISH GRADE.14. FURNITURE IS FOR REFERENCE ONLY UNLESS OTHERWISE NOTED.REFERENCE FURNITURE IS NOT IN PROJECT SCOPE.15. THE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL REQUIREDINSPECTIONS, PERMITS, TEMPORARY UTILITIES AND TEMPORARY TOILETFACILITIES.16. DURING THE COURSE OF THE DEMOLITION WORK ITEMS UNCOVERED THATVARY FROM WHAT IS SHOWN IN THE DRAWINGS SHALL BE IMMEDIATELYBROUGHT TO THE ATTENTION OF THE ARCHITECT.FLOOR PLAN:1. ALL DOORS TO BE 4” FROM FINISH FACE OF ADJACENT PARTITION ASMEASURED TO OUTSIDE FACE OF DOOR JAMB UNLESS OTHERWISE NOTED.2. PATCH & REPAIR FLOOR OPENINGS THAT OCCUR DURING DEMOLITION;COORDINATE W/ STRUCT3. CLEAN & PREP THE UNDERSIDE OF THE SLAB @ BASEMENTGENERAL NOTESCEILING PLAN:1. CENTER ALL CEILING MOUNTED DEVICES INCLUDING BUT NOT LIMITED TOLIGHT FIXTURES, EXIT LIGHTS, SPRINKLER HEADS, SPEAKERS IN CEILINGTILE PANELS.2. CENTER CEILING GRID IN ROOM IN BOTH DIRECTIONS UNLESS INDICATEDOTHERWISE.3. ALL LIGHT FIXTURES IN GYPSUM BOARD CEILING SHALL BE CENTERED INROOM UNLESS INDICATED OTHERWISE.4. ALL GYPSUM BOARD SOFFITS ARE TO BE FINISHED WITH NO EXPOSEDEDGES OR VIEWS INTO THE PLENUM SPACE.DEMOLITION1. DURING THE COURSE OF THE WORK ITEMS UNCOVERED THAT VARYFROM WHAT IS IDENTIFIED IN THE DOCUMENTS SHALL BE IMMEDIATELYBROUGHT TO THE ATTENTION OF THE ARCHITECT PRIOR TO PROCEEDINGWITH AFFECTED WORK. THIS INCLUDES BUT IS NOT LIMITED TOCOMPONENT SIZES, LOCATIONS, CONFIGURATIONS AND DAMAGED,DETERIORATED, MALFUNCTIONING OR BROKEN COMPONENTS.2. IF NOT SHOWN IN THE DRAWINGS THE CONTRACTOR SHALL REMOVE ALLEXISTING MATERIALS AND CONSTRUCTION AS NECESSARY TOCOMPLETELY INSTALL ALL NEW WORK AS REQUIRED BY OTHER PARTS OFTHE CONTRACT DOCUMENTS.3. LOCATIONS OF TEMPORARY CONSTRUCTION BARRIERS/DUST PARTITIONSTO BE COORDINATED WITH THE OWNER.4. REMOVE ALL CONSTRUCTION DEBRIS AND TRASH DAILY. PROVIDESEALED COVERINGS FOR ALL BINS OR BARROWS USED TO REMOVEDEBRIS, MATERIALS AND TRASH THROUGH OCCUPIED AREAS OF THEBUILDING.5. REMOVE ALL EXISTING CONSTRUCTION IN CONFLICT WITH NEW DESIGN.COORDINATE WITH DESIGN TEAM IF ELEMENTS OF EXISTINGCONSTRUCTION REQUIRED TO BE DEMOLISHED ARE NOT SHOWN ONDEMOLITION PLANS.6. UNLESS OTHERWISE NOTED, PARTITIONS TO BE REMOVED FROM FLOORSLAB TO UNDERSIDE OF STRUCTURE OR TOP RUNNER AS APPLICABLE.7. REMOVAL OF FIXTURES AND EQUIPMENT IS NOT LIMITED TO WHAT ISSHOWN ON DRAWINGS. IT IS INDICATED FOR GENERAL CONTRACTOR'SINFORMATION ONLY. PRIOR TO BID VERIFY ON JOB FOR EXACT TYPE,LOCATION AND NUMBER OF ITEMS TO BE REMOVED TO MEETREQUIREMENTS OF PLANS AND SPECIFICATIONS.8. MAINTAIN EXISTING DRIVES AND SERVICE ROAD SERVING THE PREMISESCLEAR AND AVAILABLE AT ALL TIMES. THE ARCHITECT WILL DESIGNATEAREA TO BE USED FOR PARKING AND STORAGE OF MATERIALS ON SITE.SITE PLAN NOTES:1. SLOPE ALL PAVING AND GRADING AWAY FROM BUILDING TO ACHIEVEPOSITIVE DRAINAGE AND TO ELIMINATE PONDING WATER ON SITE2. IMMEDIATELY NOTIFY DESIGN TEAM IF UNDOCUMENTED UTILITIES AREDISCOVERED ON SITE3. ALL EXTERIOR LEVEL LANDINGS SHALL BE OFFSET ½” MAXIMUM FROMFINISH FLOOR, RE: ___ G SHEETS AND SLOPE AWAY FROM THE BUILDING¼” PER FOOT MAXIMUM.4. PROVIDE HOSE STORAGE AT DUMPSTER ENCLOSURES5. PROVIDE WHEEL STOPS AT ALL PARKING SPACES6. CARRY ______ ALLOWANCE FOR EACH NEW UTILITY TAP TO MUNICIPALINFRASTRUCTURE7. RESTORE ALL DAMAGED SIDEWALKS AND CURBS TO THE STANDARDS OFTHE AUTHORITY HAVING JURISDICTION.8. A ½" HEM ON THE CONCEALED EDGE. INSTALL WORK WITH LAPS, JOINTSAND SEAMS WHICH WILL BE WATERTIGHT AND WATERPROOF.ROOF PLAN NOTES:1. SLOPE ROOF MEMBRANE ¼” PER FOOT MINIMUM, SLOPE CRICKETS AT ½”PER FOOT MINIMUM.2. CRICKET THE UP SLOPE SIDE OF ALL SQUARE CURBS AND PROJECTIONSOVER 20 INCHES IN WIDTH.3. ALL ROOF DRAINS, OVERFLOW DRAINS AND DOWNSPOUTS TO BECONNECTED TO SUBSURFACE DRAINAGE UNLESS NOTED OTHERWISE.SEE CIVIL FOR CONNECTION OF ROOF DRAINAGE SYSTEM TOUNDERGROUND SERVICES.4. PROVIDE ROOF MEMBRANE SYSTEM AT INTERIOR (ROOF) SIDE OFVERTICAL PARAPET WALLS WHERE PARAPET WALL IS 2’-0” HIGH ORLESS. PROVIDE METAL WALL PANEL SIDING SYSTEM AT INTERIOR(ROOF) SIDE OF VERTICAL PARAPET WALLS WHERE PARAPET WALLSARE OVER 2’-0” HIGH5. ALL ROOF MATERIALS AND ACCESSORIES TO BE INSTALLED INACCORDANCE WITH THE MANUFACTURER’S WRITTEN INSTRUCTIONS,RECOMMENDATIONS, AND SPECIFICATIONS TO ACHIEVE SPECIFIEDWARRANTY AND PROVIDE WEATHERTIGHT ROOF SYSTEM. (AND NRCASTANDARDS)6. COORDINATE ALL ROOF PENETRATIONS AND EQUIPMENT / PLATFORMSUPPORTS WITH ROOF STRUCTURE AND ROOFING INSTALLATION ANDFLASHING REQUIREMENTS.7. PROVIDE TREATED PLYWOOD SHEATHING AT THE INTERIOR (ROOF)SIDE OF ALL PARAPETS.8. ROOF MEMBRANE SYSTEM SHALL TURN UP PARAPETS, UP OVER TOPOF PARAPET WALL BELOW COPING CAP, TO BE FLASHED INTO WALLWRB SYSTEM TO ACHIEVE CONTINUOUS UNINTERRUPTED BUILDINGENVELOPE WEATHER BARRIER SYSTEM.9. PROVIDE WALK PAD SYSTEM COMPATIBLE WITH SPECIFIED ROOFSYSTEM, SPANNING FROM ROOF ACCESS POINT TO MAINTENANCESIDES OF ALL ROOFTOP EQUIPMENT.10. ALL ROOF MOUNTED EQUIPMENT STANDS, CURBS, PENETRATIONS,ACCESSORIES, UTILITIES, ETC. TO BE FLASHED INTO ROOF SYSTEM ASREQUIRED TO ACHIEVE SPECIFIED WARRANTY.11. PACK, SCREEN, INSULATE, AND SEAL ALL ROOF PENETRATIONSYSTEMS AS REQUIRED TO PREVENT ALL OUTSIDE AIR, MOISTURE,ANIMALS, INSECTS, ETC. FROM COMMUNICATING WITH FRAMINGCAVITY BELOW DECK.12. DO NOT LOCATE ANY ROOFTOP EQUIPMENT WITHIN 10’ OF ROOFEDGE UNLESS OTHERWISE NOTED13. ALL PIPING, CONDUITS, ETC. SHALL BE A MINIMUM 10” ABOVE ROOFSURFACE. PROVIDE PIPE SUPPORTS AT 8’-0” MAX.14. AFTER SUBSTANTIAL COMPLETION EXAMINE AND ENSURE ROOFDRAIN LINES ARE FREE OF DEBRIS AND BLOCKAGE. FLUSH WITHWATER TO ENSURE THAT DRAINS FLOW FREELY.15. ISOLATE ALL HEAT PIPES/FLUES AS RECOMMENDED AND OUTLINED INTHE NRCA MANUAL FOR ISOLATED STACK FLASHING.16. ALL ROOFTOP PENETRATIONS (SOIL STACKS, VENTS, ETC.) AREINSTALLED MINIMUM 4’-0” FROM OTHER DECK PENETRATIONS, RISEWALLS, AND ROOF EDGE.17. DIMENSIONS, DETAILS, EQUIPMENT SIZES AND LOCATIONS SHOWN ONTHESE ROOF PLANS AND DETAILS AR FOR INFORMATION ANDREFERENCE ONLY. EXACT SIZE AND LOCATIONS TO BE COORDINATEDWITH ALL DISCIPLINES.18. REFER TO OTHER DISCIPLINES FOR SIZE AND LOCATIONS OF NEWDECK PENETRATIONS AND ROOFTOP EQUIPMENT.19. ALL SHEET METAL SHALL BE INSTALLED TO COMPLY WITH THE LATESTEDITION OF SMACNA’S ARCHITECTURAL SHEET METAL MANUAL.20. ANCHOR ROOFTOP UNITS SECURELY IN PLACE WITH METHODSINDICATED PROVIDING FOR THERMAL EXPANSION OF METAL UNITS.CONCEAL FASTENERS WHERE POSSIBLE AND SET UNITS TRUE TOLINE AND LEVEL. EXPOSED EDGES SHALL BE FOLDED BACK NEATLYFROM A ½" HEM ON THE CONCEALED EDGE. INSTALL WORK WITHLAPS, JOINTS AND SEAMS WHICH WILL BE WATERTIGHT ANDWATERPROOF.SYMBOLSDRAWING NAMEDRAWING NUMBER1 DRAWING NAMESCALE : 1/4" = 1'-0"DRAWING SCALEDRAWING NUMBERSHEET NUMBER4A6.1DRAWING NUMBERSHEET NUMBER21A7.2DRAWING NUMBERSHEET NUMBER2A2.1DRAWING NUMBERSHEET NUMBER34 A4.1DRAWING NUMBERSHEET NUMBER18A3.2109'-0"341OFFICE112SECTIONDETAIL SECTIONEXTERIORELEVATIONINTERIORELEVATIONDETAILLEVEL LINEKEY NOTEREVISIONNUMBERROOM NAMENUMBERABBREVIATIONSACADAAGADJAFFALTALUMAPPROXARCHBBBDBLDGBOBOSBOTBURCCABCBCCCGCJCLCLGCLOSCLRCOCOLCONCCONTCRCRMCTRDBLDETDFDFCDIADIMDMDNDRDSDWDWGEEAEFEHDEIFSEJELECELEVEMERACOUSTICAL CEILING TILEAMERICANS WITH DISABILITIES ACTADJUSTABLEABOVE FINISHED FLOORALTERNATEALUMINUMAPPROXIMATEARCHITECTBEAD BOARD (WAINSCOTT)BOARDBUILDINGBOTTOM OFBOTTOM OF STEELBOTTOMBUILT UP ROOFCARPET OR CARPET TILECABINETCATCH BASINCUBICLE CURTAIN TRACKCORNER GUARDCONTROL JOINTCENTERLINECEILINGCLOSETCLEARCLEAN OUTCOLUMNCONCRETECONTINUOUSCRASH RAILCROWN MOULDINGCENTERDOUBLEDETAILDECORATIVE FILMDOOR FRAME CASINGDIAMETERDIMENSIONDECORATIVE METALSDOWNDOORDOWN SPOUTDISHWASHERDRAWINGEASTEACHEPOXY FLOORINGELECTRIC HAND DRYEREXTERIOR INSULATED FINISHINGSYSTEMEXPANSION JOINTELECTRIC(AL)ELEVATIONEMERGENCYEQEQUIPEWEWCEXP. JT.EXSTEXTFAFAPFDFEFECFFFHFHCFINFIXTFLRFLUORFRPFRTFTGALGALVGBGCGLGNDGWBGYPHCHDWDHDWRHMHORIZHPHRHTHWHWHIDINSULINTJANJCJTKPLAMLAVLB(S)LDGLFLTEQUALEQUIPMENTEACH WAYELECTRIC WATER COOLEREXPANSION JOINTEXISTINGEXTERIORFIRE ALARMFIRE ANNUNCIATOR PANELFLOOR DRAINFIRE EXTINGUISHERFIRE EXTINGUISHER CABINETFINISH FLOORFIRE HYDRANTFIRE HOSE CABINETFINISHFIXTUREFLOORFLORESCENTFIBERGLASS REINFORCED PLASTICPANELFIRE RETARDANT TREATEDFOOT or FEETGALLONGALVANIZEDGRAB BARGENERAL CONTRACTORGLASSGROUNDGYPSUM WALL BOARDGYPSUMHANDICAPPEDHARDWOODHARDWAREHOLLOW METALHORIZONTALHIGH POINTHAND RAILHEIGHTHAND WASHHOT WATER HEATERINNER (OR INSIDE) DIAMETERINSULATIONINTERIORJANITORJANITOR'S CLOSETJOINTKICK PLATELAMINATELAVATORYPOUNDSLANDINGLINOLEUM FLOORINGLIGHTLVTLWCMMAXMECHMEMBMFRMIMINMISCMOMTDMTLNNICNONOMNTSOCODOFFOHOPOPGOPPPPCPCNPLPLAMPLASPLYWDPRQSRRADRBRBMRCPRDREREFREINFREQDRESILRFRMRORPRRSSCSCSCHEDLUXURY VINYL TILELINEAR WOOD CEILINGMISCELLANEOUSMAXIMUMMECHANICALMEMBRANEMANUFACTURERMIRRORMINIMUMMISCELLANEOUSMASONRY OPENINGMOUNTEDMETALNORTHNOT IN CONTRACTNUMBERNOMINALNOT TO SCALEON CENTEROUTSIDE DIAMETEROFFICEOPPOSITE HANDOVERFLOW PIPEOPENINGOPPOSITEPAINTPRIVACY CURTAINPAINTED CONCRETEPLASTIC LAMINATEPLASTIC LAMINATEPLASTERPLYWOODPAIRQUARTZ SURFACERISERRADIUSRUBBER WALL BASERUBBER WALL BASE MILWORK PROFILEREFLECTED CEILING PLANROOF DRAINREFERREFRIGERATORREINFORCEDREQUIREDRESILIENTRUBBER FLOORINGROOMROUGH OPENINGRESIN PANELRUB RAILSOUTHSCUPPERSEALED CONCRETESCHEDULESDTSECTSFSFSHTSIMSPECSQSSSSMSTSTDSTLSTRUCTSUSPSVSWPTTT>ELTHKTLTLTTOTOSTPTRTSTYPTZUNFINUNOUTILVCFVCTVERTVIFVOJVTRWW/W/OWBWCWCWDWINWPWPWSWTWTWVWWFSTATIC DISSIPATIVE FLOORINGSECTIONSQUARE FOOTSEAMLESS FLOORINGSHEETSIMILARSPECIFICATIONSQUARESTAINLESS STEELSOLID SURFACE MATERIALSTONESTANDARDSTEELSTRUCTURALSUSPENDEDSHEET VINYLSPECIALTY WALL PANELSTREADTRANSITION STRIPTONGUE & GROOVETELEPHONETHICKTILETOILETTOP OFTOP OF STEELTOILET PARTITIONTRIMTACKABLE SURFACETYPICALTERRAZZOUNFINISHEDUNLESS NOTED OTHERWISEUTILITYVINYL COMPOSITION FLOORINGVINYL COMPOSITION TILEVERTICALVERIFY IN FIELDVERIFY ON JOBVENT TERMINATION PIPEWESTWITHWITHOUTWOOD BASEWALL COVERINGWATERCLOSETWOODWINDOWWATERPROOFWALL PROTECTIONWOOD STAINWEIGHTWINDOW TREATMENTSWOOD VENEERWELDED WIRE FABRICDRAWING INDEX12 3SHEETNUMBERSHEET NAMEGENERALG000 COVER SHEETG001 DRAWING INDEX + GENERAL INFORMATIONG002 TYPICAL TOILET & ACCESSORIES INFORMATIONG003 PARTITION TYPESG004 TYPICAL PARTITION DETAILS●●●●● ●●●●LIFESAFETYLS101 LIFE SAFETY PLAN - FIRST FLOOR●CIVILC1C2C3C4C5C6C7C8C9C10C11EXISTING CONDITIONSEXISTING CONDITIONS (BUILDING INSET)SITE PLANPAVEMENT PLANGRADING PLANUTILITY PLANEROSION CONTROL PLANTYPICAL DETAILSTYPICAL DETAILSWATER DETAILSSEWER DETAILS●●●●●●●●●●●●●LANDSCAPEL1.0OVERALL LANDSCAPE PLAN●L1.1LANDSCAPE PLAN●L1.2LANDSCAPE PLAN●L1.3LANDSCAPE NOTES / DETAILS●L2.1IRRIGATION PLAN●L2.2IRRIGATION PLAN●L2.3IRRIGATION NOTES & DETAILS●STRUCTURALS001 STRUCTURAL NOTES●S002 STRUCTURAL NOTES, ABBREVIATIONS AND SYMBOLS LEGEND ●S003 SPECIAL INSPECTIONS●S004 SPECIAL INSPECTIONS●S101 FOUNDATION PLAN - OVERALL●S101A FOUNDATION PLAN - AREA A●S101B FOUNADTION PLAN - AREA B●S101C FOUNDATION PLAN - AREA C●S101D ENLARGED FOUNDATION PLANS●S101E DUMPSTER FOUNDATION PLAN AND DETAILS●S102 ROOF FRAMING PLAN - OVERALL●S102A ROOF FRAMING PLAN - AREA A●S102B ROOF FRAMING PLAN - AREA B●S102C ROOF FRAMING PLAN - AREA C●S201 FRAMING ELEVATIONS●S202 FRAMING ELEVATIONS●S301 TYPICAL CONCRETE DETAILS●S302 CONCRETE DETAILS●S303 CONCRETE DETAILS●S401 TYPICAL MASONRY DETAILS●S501 TYPICAL STEEL DETAILS●S502 TYPICAL STEEL DETAILS●S600 TYPICAL REPAIR DETAILS●ARCHITECTURAL SITEADS101 DEMOLITION SITE PLANAS101 ARCHITECTURAL SITE PLANAS102 SITE DETAILSAS103 SITE DETAILS●●●●●ARCHITECTURE DEMOLITIONAD101 DEMOLITION FIRST FLOOR PLAN●AD101D DEMOLITION BASEMENT PLAN●ARCHITECTUREA101 OVERALL FLOOR PLAN - FIRST FLOORA101A FLOOR PLAN - AREA AA101B FLOOR PLAN - AREA BA101C FLOOR PLAN - AREA CA101D FLOOR PLAN - BASEMENTA110 ENLARGED FLOOR PLANSA120 PLAN DETAILSA121 PLAN DETAILSA141 OVERALL REFLECTED CEILING PLANA141A REFLECTED CEILING PLAN - AREA AA141B REFLECTED CEILING PLAN - AREA BA141C REFLECTED CEILING PLAN - AREA CA141D REFLECTED CEILING PLAN - BASEMENTA145 REFLECTED CEILING DETAILSA151 ROOF PLANA152 ROOF DETAILSA153 ROOF DETAILSA154 ROOF DETAILS - STANDING SEAM ROOFA201 BUILDING ELEVATIONSA202 BUILDING ELEVATIONSA301 BUILDING SECTIONSA401 WALL SECTIONSA402 WALL SECTIONSA403 WALL SECTIONSA411 SECTION DETAILSA501 VERTICAL CIRCULATIONA502 VERTICAL CIRCULATION - STAIR DETAILSA601 DOOR SCHEDULEA602 GLAZING ELEVATIONS●●●●●●●●●●●●●●●●●●●●●●●●●●●●●SHEETNUMBERSHEET NAMEINTERIOR DESIGNID001 FINISH KEYID002 FINISH TRANSITION DETAILSID101 OVERALL FINISH PLAN - FIRST FLOORID101A FINISH PLAN - AREA AID101B FINISH PLAN - AREA BID101C FINISH PLAN - AREA CID131 OVERALL MILLWORK PLAN - FIRST FLOORID131A MILLWORK PLAN - AREA AID131B MILLWORK PLAN - AREA BID131C MILLWORK PLAN - AREA CID201 INTERIOR ELEVATIONSID202 INTERIOR ELEVATIONSID203 INTERIOR ELEVATIONSID301 INTERIOR DETAILSID302 INTERIOR DETAILSID401 ENLARGED DRAWINGS●●●●●●●●●●●●●●●●●●●MECHANICALM-001 MECHANICAL GENERAL NOTES AND LEGENDS●MD101 MECHANICAL DEMOLITION PLAN - LEVEL 1MEP01 MECHANICAL ELECTRICAL PLUMBING SITE PLAN●MEP02 MECHANICAL ELECTRICAL PLUMBING ROOF PLAN●MH101 MECHANICAL OVERALL PLAN - LEVEL 1●MH102A MECHANICAL PLAN - LEVEL 1 - AREA A●MH103B MECHANICAL PLAN - LEVEL 1 - AREA B●MH104C MECHANICAL PLAN - LEVEL 1 - AREA C●MH105 MECHANICAL PLAN - BASEMENT●MP101A MECHANICAL PIPING AND CONTROLS PLAN - LEVEL 1 - AREA A ●MP102B MECHANICAL PIPING AND CONTROLS PLAN - LEVEL 1 - AREA B ●MP103C MECHANICAL PIPING AND CONTROLS PLAN - LEVEL 1 - AREA C ●MP104 MECHANICAL PIPING AND CONTROLS PLAN - BASEMENT●MZ501 MECHANICAL DETAILS●MZ601 MECHANICAL SCHEDULES●MZ801 MECHANICAL CONTROLS●MZ802 MECHANICAL CONTROLS●ELECTRICALE001 ELECTRICAL GENERAL NOTES AND LEGEND●ED100 ELECTRICAL DEMOLITION PLAN - BASEMENT●ED101A ELECTRICAL DEMOLITION PLAN - LEVEL 1 - AREA A●ED101B ELECTRICAL DEMOLITION PLAN - LEVEL 1 - AREA B●ED101C ELECTRICAL DEMOLITION PLAN - LEVEL 1 - AREA C●EL100 ELECTRICAL LIGHTING PLAN - BASEMENT●EL101A ELECTRICAL LIGHTING PLAN - LEVEL 1 AREA A●EL101B ELECTRICAL LIGHTING PLAN - LEVEL 1 AREA B●EL101C ELECTRICAL LIGHTING PLAN - LEVEL 1 AREA C●EP100 ELECTRICAL POWER PLAN - BASEMENT●EP101A ELECTRICAL POWER PLAN - LEVEL 1 AREA A●EP101B ELECTRICAL POWER PLAN - LEVEL 1 AREA B●EP101C ELECTRICAL POWER PLAN - LEVEL 1 AREA C●EZ501 ELECTRICAL DETAILS●EZ502 ELECTRICAL DETAILS●EZ601 ELECTRICAL SCHEDULES●EZ602 ELECTRICAL SCHEDULES●EZ701 ELECTRICAL DIAGRAMS●FA001 FIRE ALARM GENERAL NOTES AND LEGEND●FA100 FIRE ALARM PLAN - BASEMENT●FA101A FIRE ALARM PLAN - LEVEL 1 - AREA A●FA101B FIRE ALARM PLAN - LEVEL 1 - AREA B●FA101C FIRE ALARM PLAN - LEVEL 1 - AREA C●PLUMBINGP001 PLUMBING GENERAL NOTES AND LEGEND●PD100 PLUMBING DEMOLITION PLAN - BASEMENT●PD101 PLUMBING DEMOLITION PLAN - UNIT A●PD102 PLUMBING DEMOLITION PLAN - UNIT B●PD103 PLUMBING DEMOLITION PLAN - UNIT C●PK101 PLUMBING UNDERSLAB PLAN - AREA A●PK102 PLUMBING UNDERSLAB PLAN - AREA B●PK103 PLUMBING UNDERSLAB PLAN - AREA C●PP100 PLUMBING WASTE & VENT PLAN - BASEMENT●PP101 PLUMBING WASTE & VENT PLAN - LEVEL 1 - AREA A●PP102 PLUMBING WASTE & VENT PLAN - LEVEL 1 - AREA B●PP103 PLUMBING WASTE & VENT PLAN - LEVEL 1 - AREA C●PS101 PLUMBING SUPPLY PLAN - LEVEL 1 - AREA A●PS102 PLUMBING SUPPLY PLAN - LEVEL 1 - AREA B●PS103 PLUMBING SUPPLY PLAN - LEVEL 1 - AREA C●PZ501 PLUMBING DETAILS●PZ502 PLUMBING DETAILS●PZ601 PLUMBING SCHEDULES●PZ701 PLUMBING DIAGRAMS●FIRE PROTECTIONFX001 FIRE PROTECTION GENERAL NOTES AND LEGEND●FX101 FIRE PROTECTION PLAN - LEVEL 1●GRACE HEBERT CURTIS ARCHITECTS, LLCSEAL:© THIS SET OF DOCUMENTS INCLUSIVE OFDRAWINGS,SPECIFICATIONS, AND ADDENDA MAY NOTBE COPIED, SCANNED, NOR ELECTRONICALLYDISTRIBUTED OR USED FOR CONSTRUCTION WITHOUTTHE EXPRESSED WRITTEN CONSENT OF GRACEHEBERT CURTIS ARCHITECTS, LLC. NO PLAN ROOM,ELECTRONIC PLAN SERVICE (INTERNET PLANSERVICE), NOR REPRODUCTION COMPANY SHALL BEPERMITTED TO POST THESE DOCUMENTS WITHOUTTHE EXPRESSED WRITTEN CONSENT OF THEARCHITECT, GRACE HEBERT CURTIS ARCHITECTS, LLC.SEE SHEETS G001/G002 FOR GENERALNOTES APPLICABLE TO THE ENTIREDRAWING SETCBANO.123DESCRIPTIONADDENDUM 1ADDENDUM 2ADDENDUM 3DATE03/06/2504/08/2511/13/25DATE:10/29/25PHASE:CONSTRUCTION DOCSISSUED FORPERMITPROJECT NO:4023108DRAWING INDEX +GENERAL INFORMATIONSHEET NUMBERG001
- Commodity Codes
-
- NAICS 236220Commercial and Institutional Building Construction
- NAICS 541330Engineering Services
- NAICS 561210Facilities Support Services
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Country Club west Stoplog Reh...
Follow Country Club west Stoplog Rehabilitation Active Contract Opportunity Notice ID FY4201010 Related
INTERNATIONAL BOUNDARY AND WATER COMMISSION: US-MEXICO
Bid Due: 7/10/2026
Reference #: 2606-069. Name: ...
Reference #: 2606-069. Name: Teel Parkway Parking Addition Questions Due Date: Jul 23rd
City of Frisco
Bid Due: 7/30/2026