Westnedge Ave (Vine-Michigan)
Project Information
- Bid Title
- Westnedge Ave (Vine-Michigan)
- Issuing Agency
- City of Kalamazoo
- Location
- Michigan
- Published Date
- Mar 7, 2025
- Closing Date
- Mar 27, 2025
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Westnedge Ave (Vine-Michigan)
Closing date
March 27, 2025, 03:00 PM- Reference number 91396-022.0
- Status Open
-
Summary
It is the intent of these plans and specifications to provide for a general contractor who shall provide all labor, materials, tools and equipment necessary to perform in a professional manner for the Westnedge Ave (Vine-Michigan) project as described in the specifications and bid document.
The bidder shall have all work completed no later than September 1, 2025.
91396-022.0-Bid Document (PDF, 25MB)
91396-022.0-distribution list (PDF, 61KB)
91396-022.0-appendix c (PDF, 23MB)
91396-022.0-appendix d (PDF, 1MB)
INTENT
It is the intent of these plans and specifications to provide for a general contractor who shall provide all labor, materials, tools and equipment necessary to perform in a professional manner for the Westnedge Ave (Vine- Michigan) project as described in the specifications and bid document.
SCOPE OF WORK
The scope of work for this project shall consist of 2-inch mill and resurface of roadway from Vine intersection going north approximately 0.5 miles, stopping just short of Michigan Ave. This includes the intersections of Vine, Dutton, Walnut, Cedar, Lovell, South, and Academy. The Michigan Ave intersection is NOT included in the scope of this project. The traffic signals at Vine and Lovell will be replaced, and sidewalk ramps at all intersections except South will be removed and reconstructed. Project also includes typical items such as SESC measures, temporary and permanent traffic control devices, drive entrances as needed, and structure adjusts.
All necessary traffic control, labor, materials, tools, equipment, and other items incidental to the work being performed shall be included in the Contractor’s unit price for this contract. Such items will not be bid or paid for separately but shall be included in the overall unit price. The bidder shall furnish all labor, supervision, supplies, tools, equipment, and other means necessary or proper for performing and completing the work.
The bidder shall be responsible for the cleaning up of the job site and shall repair or restore all structures and property that may be damaged or disturbed during performance of the work to the satisfaction of the Public Services Department for the City of Kalamazoo. Drainage structure covers shall be salvaged and reused if in usable condition; otherwise, they shall be replaced. Where needed, all traffic control used for such operations as defined by the MMUTCD will be the responsibility of the bidder.
The bidder shall have all work completed within 60 calendar days of beginning work AND no later than September 1, 2025 (contractor shall be held to stricter/earlier deadline).
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Release Date Project with Bid Documentation Mandatory Pre-Bid Site Visit Bid Due Date
Oakland University
Bid Due: 7/08/2026
FORM 5550 #10 FF WINDOW COLLE...
Description: FORM 5550 #10 FF WINDOW COLLECTIONS ENVELOPE Department: Technology, Management and Budget
State of Michigan
Bid Due: 7/17/2026