SO-1860 Hill EV Elec Infrastructure Addendum 1
Project Information
- Bid Title
- SO-1860 Hill EV Elec Infrastructure Addendum 1
- Issuing Agency
- Lansing School District
- Location
- Michigan
- Published Date
- May 28, 2026
- Closing Date
- Jun 4, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
- SO-1860 Hill EV Elec Infrastructure Addendum 1
- Attachment Preview
-
PRE-BID ADDENDUM NO. 1TO SPECIFICATION 28172.00OWNER:Lansing Public School District519 West Kalamazoo StreetLansing, Michigan 48911PROJECT:Electric Vehicle Charger and Battery Storage Integrationwith Hill Center Resiliency Project #SO-1860CONTRACT FOR: ConstructionENGINEER:CTC Engineering, LLC3915 Research Park Dr., Ste. A-8Ann Arbor, Michigan 48108INTENT:The following is intended to be a clarification to the Contract Documentsbased upon the questions offered as a result of the Pre-Bid Walk Throughon May 20, 2026.DRAWINGS:The submittals for the EV Chargers are attached herewith for reference only.The following drawings accompany this Addendum:• Sheet 28172.00, E-2• Sheet 28172.00, E-2.1• Sheet 28172.00, E-5PROJECT MANUAL: -No sections are reissued with this Addendum-CLARIFICATIONS:A. Note that the bid proposals can be hand delivered, or mailed, and must be received no laterthan 2:00 pm, June 4, 2026 at: Lansing School District, Attn: Purchasing/Sealed Bid SO-1860, 519 W. Kalamazoo St, Lansing, Michigan 48933.B. Attached is the bidders list of those Contractors that attended the pre-bid walk through heldon May 20, 2026.C. The following questions and associated clarifications are made part of and binding to theContract documents:1. Are the EV chargers part of this Contract?Response: The acquisition of the EV chargers is not under this Contract, as they havealready been purchased by the Owner. The installation of the chargers is under thisContract and shall be assigned to the Contractor at the site.2. Will there be for construction drawing issued for bidding or are we to bid from thedrawings labeled “preliminary – Not to be used for construction”?Response: You are to bid from the documents issued as part of this package. The “ForConstruction” documents will be issued at the time of award.3. Will yellow Ideal plastic bollard protection sleeves be allowed in lieu of painting thebollards?Response: Yes.4. Where are TR-1 and Panel GA-1 located?Response: Sheet E-2 shows the overall equipment locations. Please see Sheet 28172.00E-2.1 for more specific locations.5. Please provide specs or a submittal of the owner provided bus EV chargers.Response: Please see the attached submittals for the EV Chargers.6. Who is responsible for final installation and startup of the Bus EV chargers?Response: The final installation is under this Contract but the startup will be performedby others.7. Do the EV chargers require a data connection?Response: Yes.8. Is the fencing included in this project? The civil drawings show it as by others, butthe electrical drawings have details on how to install it. Are there further details onthe fencing? Fabric type? Post thickness? Gate dimensions?Response: The fencing is part of this project in its entirety. In the Project Manual, pleasesee section #32 3100, for the specific specifications for the fencing and operators.9. Who is responsible for the gate operator? If contractor, please provide specs on it.Response: In the Project Manual, please see section #32 3100.10. Will the gate operators require a traffic loop for exit?Response: In the Project Manual, please see section #32 3100, page 3.11. What will open the gate operators?Response: In the Project Manual, please see section #32 3100, page 3.12. Will there be civil specs provided for this project? The only specs are electrical.Response: Civil specifications are provided on the civil sheets.13. Is civil testing part of this project? Who is responsible for paying the cost of civiltesting?Response: Civil testing is by a third party, obtained and paid for by the Owner.14. What is expected for pavement markings or are these by others?Response: Pavement markings are under this contract and shall conform to MDOTspecifications.15. Please provide a base detail for the bus EV chargers.Response: The base detail is shown in the submittals herewith. The base plate of thecharger is to be bolted in place direct to the concrete.16. Please provide a more detailed/larger plan for the bus charger arrangement showingthe bollard spacing and bus EV charger layout17. Response: Please see Sheet 28172, E-2.1 for an enlarged view of this area.18. Please clarify how the tap in the existing switch is to be made and where thisequipment is on the plans. Can plans be provided indicating what and where eachpiece of equipment is?Response: These have been provided and are attached.19. How long do you anticipate the Note #3 (sheet E-1) to be? It appears the tap lengthmay dictate overcurrent protection is needed for the tap conductors prior to reachingthe location shown for the 600A ATS.Response: The is using the tap rule as indicated in Section 240.21 (B)(5) of the NationalElectrical Code. The over-current protection in the ATS would be the required deviceas identified in Section 240.21 (B)(5)(3).20. The drawings indicate the solar array will not operate during a utility outage,however it appears if you are back feeding the school switchboard from thebuses/BESS then the array will in fact see power at the tap and start pushing powerback to the system. No electronics are indicated to be added to the existing solarswitch to accept a signal from the SEL-751 to open it if there is a utility loss and thebuses/BESS are sent to a back feed scenario.Response: The control of the solar array invertors, automatic transfer switches, EVchargers and the future BESS is not under this Contract. The control conductors andthe termination thereof are however, under this Contract. The point-to-pointterminations will be issued after all submittals have been made.21. Can you indicate where on the drawings the “Existing switch” below (left side) is locatedthat the 600 Amp tap will be made?a. Does this tap need overcurrent protection?Response: Please see response to [22] below.22. Can the 600 Amp tap be completed anywhere in the existing main switchboard sections?Does this tap need to be designed by Eaton or be UL field listed?Response: It is anticipated that the tap at the existing switch wouldbe made at the load side of the switch with additional lugs withrespect to the existing switch feeding the existing solar panels. Withrespect to the existing indoor distribution panel, it is anticipated thata direct connection can be made to the low voltage bus, and thenby the tap rule, fed to the ATS.23. Please clarify what is wanted for mesh reinforcement in the heavy duty concrete? Weassume this means W6x6 W2.9 but are unclear on what the SV stands for.Response: The SV notation stands for“smooth wire with deformed wire”, with theW2.9 referring to the wire size.- END OF PRE-BID ADDENDEM #1 -
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
2026 Local Streets Paving Closing date July 21, 2026, 03:00 PM Reference number
City of Kalamazoo
Bid Due: 7/21/2026
472/24262.JBB; Alger C.F. - P...
Description: 472/24262.JBB; Alger C.F. - Paging System Replacement Department: Technology, Management and Budget
State of Michigan
Bid Due: 7/15/2026