City of Statesboro Street Striping FY 2025 ADDENDUM 1

Project Information

Bid Title
City of Statesboro Street Striping FY 2025 ADDENDUM 1
Issuing Agency
Statesboro city
Location
Georgia
Published Date
Feb 24, 2025
Closing Date
Mar 12, 2025
Government Level
State & Local
Status
Closed
Original Source
Join to Access Full Details
Project Description
  • RFQ/RFP 2025 SOLICITATION

    ADDENDUM 1 of 1

    Wednesday, February 19, 2025

    SOLICITATION NUMBER: RFQ/RFP 2025 SOLICITATION TITLE: City of Statesboro Street Striping FY 2025

    SERVICES DUE DATE: 3:00 PM on Wednesday, March 12th, 2025

    Purpose: Addendum 1 addresses questions asked by contractors and is designed to clarify specifics of the project

    THIS DOCUMENTATION MUST BE INCLUDED IN YOUR SUBMITTED SEALED BID FOR THE BID TO BE CONSIDERED.

    1. Bobby Donaldson– listed as white solid only, did you mean yellow solid only?Too narrow and dirty for white edge-lines. No white striping needed; this quantity will be applied as yellow solid lines only.
    2. Harden Road– needs edge-lines clipped. Is the City going to clip shoulders? Allconstruction work shall be performed in accordance with the most recent GDOT Standards and   “Section 653—Thermoplastic Traffic Stripe 653.3.05 Construction A. General Application Thoroughly clean pavement areas to be striped. Use hand brooms, rotary brooms, air blasts, scrapers, or other approved methods that leave the pavement surface clean and undamaged. Take care to remove all vegetation and road film from the striping area. All new Portland Cement Concrete pavement surfaces shall be mechanically wire brushed or abrasive cleaned to remove all laitance and curing compound before being striped.”
    3. Parker Street– no white solid present, curb/gutter. Add white edge-lines? Yes, solid white striping will be added.
    4. Vista Circle– heavy clipping and sweeping needed, will need to be pre-lined. Will the City clip and sweep the edge-lines? Refer to #2.
    5. Rucker Lane– Length limits listed of South Main to 111 South driveway is .302 miles, its only .151 miles.  151 miles is the correct quantity for this section of Rucker Lane.
    6. East Olliff Street– Length limits from Packinghouse to Zetterower are listed as 1.146 miles, only .573 miles. Road is narrow and needs clipping for white solid edge-lines. Do you want edge-lines, and will the City clip them? 573 miles is the correct length for E. Olliff St. The average road width is 20 ft, so solid white edge lines will be applied. Refer to #2.

    RECEIPT OF ADDENDUM 1 OF 1 ACKNOWLEDGED: SIGNATURE: ________________________________

  • Commodity Codes
    • NAICS 237310Highway, Street, and Bridge Construction
    * Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.

    Government Bids

    Empower Your Bidding Strategy

    Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.

    • Access an extensive database of bids, including comprehensive local and state opportunities.
    • Receive customized alerts for the bids that matter most to your business.
    • Explore detailed specifications to ensure precise and competitive submissions.
    • Gain a competitive edge with up-to-date information and exclusive opportunities.

    See Also

    CSU_J-465-DP One Arsenal Plac...

    Event ID Event Title Government Entity Start Date (ET) End Date (ET) PE-47200-RFQ-2026-000000142

    State Government of Georgia

    Bid Due: 7/16/2026

    GSU - Chiller Replacement, Li...

    Event ID Event Title Government Entity Start Date (ET) End Date (ET) 50900-eRFQC-001795-2026

    State Government of Georgia

    Bid Due: 7/21/2026