City of Statesboro Street Striping FY 2025 ADDENDUM 1
Project Information
- Bid Title
- City of Statesboro Street Striping FY 2025 ADDENDUM 1
- Issuing Agency
- Statesboro city
- Location
- Georgia
- Published Date
- Feb 24, 2025
- Closing Date
- Mar 12, 2025
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
- RFQ/RFP 2025 SOLICITATION
ADDENDUM 1 of 1
Wednesday, February 19, 2025
SOLICITATION NUMBER: RFQ/RFP 2025 SOLICITATION TITLE: City of Statesboro Street Striping FY 2025
SERVICES DUE DATE: 3:00 PM on Wednesday, March 12th, 2025
Purpose: Addendum 1 addresses questions asked by contractors and is designed to clarify specifics of the project
THIS DOCUMENTATION MUST BE INCLUDED IN YOUR SUBMITTED SEALED BID FOR THE BID TO BE CONSIDERED.
- Bobby Donaldson– listed as white solid only, did you mean yellow solid only?Too narrow and dirty for white edge-lines. No white striping needed; this quantity will be applied as yellow solid lines only.
- Harden Road– needs edge-lines clipped. Is the City going to clip shoulders? Allconstruction work shall be performed in accordance with the most recent GDOT Standards and “Section 653—Thermoplastic Traffic Stripe 653.3.05 Construction A. General Application Thoroughly clean pavement areas to be striped. Use hand brooms, rotary brooms, air blasts, scrapers, or other approved methods that leave the pavement surface clean and undamaged. Take care to remove all vegetation and road film from the striping area. All new Portland Cement Concrete pavement surfaces shall be mechanically wire brushed or abrasive cleaned to remove all laitance and curing compound before being striped.”
- Parker Street– no white solid present, curb/gutter. Add white edge-lines? Yes, solid white striping will be added.
- Vista Circle– heavy clipping and sweeping needed, will need to be pre-lined. Will the City clip and sweep the edge-lines? Refer to #2.
- Rucker Lane– Length limits listed of South Main to 111 South driveway is .302 miles, its only .151 miles. 151 miles is the correct quantity for this section of Rucker Lane.
- East Olliff Street– Length limits from Packinghouse to Zetterower are listed as 1.146 miles, only .573 miles. Road is narrow and needs clipping for white solid edge-lines. Do you want edge-lines, and will the City clip them? 573 miles is the correct length for E. Olliff St. The average road width is 20 ft, so solid white edge lines will be applied. Refer to #2.
RECEIPT OF ADDENDUM 1 OF 1 ACKNOWLEDGED: SIGNATURE: ________________________________
- RFQ/RFP 2025 SOLICITATION
- Commodity Codes
-
- NAICS 237310Highway, Street, and Bridge Construction
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
CSU_J-465-DP One Arsenal Plac...
Event ID Event Title Government Entity Start Date (ET) End Date (ET) PE-47200-RFQ-2026-000000142
State Government of Georgia
Bid Due: 7/16/2026
GSU - Chiller Replacement, Li...
Event ID Event Title Government Entity Start Date (ET) End Date (ET) 50900-eRFQC-001795-2026
State Government of Georgia
Bid Due: 7/21/2026