Gleason Park Fencing Improvement Project - IFB 26-12
Project Information
- Bid Title
- Gleason Park Fencing Improvement Project - IFB 26-12
- Issuing Agency
- Stockton Unified School District
- Location
- California
- Published Date
- May 1, 2026
- Closing Date
- May 20, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
- Gleason Park Fencing Improvement Project - IFB 26-12
- Attachment Preview
-
NOTICE INVITING INFORMAL BIDSNotice is hereby given that the governing board (“Board”) of the Stockton Unified SchoolDistrict (“District”) will receive sealed bids for the following project, Edna Gleason ParkFencing Improvement Project, Bid No. IFB 26-12 (“Project” or “Contract”). The goal ofthis project scope is to upgrade the 4-foot ornamental iron fence at Edna Gleason Park (Cityof Stockton) at its shared boundary with Spanos Elementary School (Stockton UnifiedSchool District) to 6-foot “Privacy Plus” galvanized chain link featuring integrated privacyslats. This solution provides the necessary height for school security while offering a visualscreen between park activities and the shared play area.1. Project OverviewThe project involves replacing 540 lineal feet of 4-foot ornamental iron with 6-foot high, 9-gauge, Privacy Plus”, galvanized chain link fencing. Replacing approximately 60 lineal feet of6’ black coated chain-link fabric with galvanized fabric. Replacing approximately 140 linealfeet of 4’ tall Ornamental Iron fence with 6’ high galvanized chain-link fence. The installationoccurs within an existing 13-inch wide concrete mow strip, requiring precision cutting andstructural patching while ensuring the safety of students and the protection of parkirrigation systems.2. Material Specifications• See SUSD Fencing Spec (Section 32 31 13 – Chain link Fencing and Gates).• Fabric: 9-gauge galvanized steel chain link (2-inch mesh).• Framework: All posts and rails to be Schedule 40 galvanized steel.• Privacy: High-density polyethylene (HDPE) privacy slats (to be inserted into thegalvanized mesh) providing 90% visibility blockage.• Restoration: Any turf damaged by equipment, concrete slurry, or foot traffic mustbe restored to original condition via soil aeration and sod replacement (matchingexisting turf species).• Security: Inclusion of a bottom tension wire (7-gauge) to prevent the fabric frombeing pulled up or out.3. Site Protection & Infrastructure• Irrigation/Valve Boxes: The contractor must physically mark and protect allirrigation valve boxes and lines. Any damage to the City ofStockton or SUSD irrigation systems during the concrete cutting or post-hole boringphase must be repaired immediately at the contractor’s expense.• Mow Strip Integrity: The 13-inch wide concrete strip serves as a primary walkway.New footings must be core-drilled or saw-cut. All patches must be finished flush withthe existing slab to eliminate trip hazards for Spanos Elementary students.4. Safety & Coordination (Contractor Requirements)STOCKTON UNIFIED SCHOOL DISTRICTGLEASON PARK FENCING IMPROVEMENT, IFB # 26-12INFORMAL BID PACKET - CUPCCAANOTICE INVITING INFORMAL BIDS - 1• Mandatory Safety Plan: Contractor must submit a site-specific safety plan prior tomobilization.• Temporary Fencing: temporary fencing must be maintained throughoutconstruction. The school perimeter must be fully secured at the end of each shift—noexceptions.• Agency Coordination: Attendance is required at a pre-construction coordinationmeeting with Stockton Unified School District (SUSD) and City ofStockton employees to finalize access points and work hours.5. Scope of Work1. Preparation: Locate all underground utilities and irrigation valves. Install temporaryfencing.2. Demolition: Remove 4-foot iron fencing. Saw-cut/core-drill the 13-inch mow strip at10-foot intervals.3. Structural: Drill 36-inch deep holes for new galvanized posts. Set posts in 3,000 PSIconcrete and patch the mow strip to match the existing broom finish.4. Assembly: Install top rails, 9-gauge galvanized fabric, and privacy slats.5. Modification: to a section of existing ornamental iron fence.6. Access: Install (1) 4-foot pedestrian gates with SUSD-approved hardware in existinggate location and (1) 12-foot double-drive gate for maintenance in existing location.6. Success Criteria• New 6-foot galvanized fence is perfectly plumb and provides full privacy screeningfrom the park and adjacent apartment buildings.• The 13-inch mow strip remains structurally sound with flush, professional concretepatches.• Continuous security was maintained for Spanos Elementary throughout the projectduration.• Irrigation system and valve boxes remain undamaged.• Restoration: Turf must be restored to original condition.• Work is completed on or before July 25, 2026.STOCKTON UNIFIED SCHOOL DISTRICTGLEASON PARK FENCING IMPROVEMENT, IFB # 26-12INFORMAL BID PACKET - CUPCCAANOTICE INVITING INFORMAL BIDS - 2. Contract Documents are available as of 4:00pm on May 1, 2026, for review and may bedownloaded from the District’s website, https://www.stocktonusd.net/projects-out-to-bid,using the [“Projects Out to Bid”] link.Sealed Bids will be received until 2:00 p.m., May 20, 2026 at the SUSD Maintenance &Operations Office, 1932 N. El Pinal Drive, Stockton, Ca 95205, at or after which time thebids will be opened and publicly read aloud. All bids shall be on the form provided by theDistrict and must be responsive.To bid on this Project, the Bidder is required to be registered as a public works contractorwith the Department of Industrial Relations and to possess one or more of the followingState of California Contractor Licenses: C-13, A, B. The Bidder's license(s) must remainactive and in good standing throughout the term of the Contract.A mandatory pre-bid conference and site visit will be held on Wednesday May 6, 2026, at10:00 a.m. at Edna Gleason Park (between the Park and Spanos Elementary School), 536 SCalifornia Street, Stockton, CA 95203, California (“Site Visit”). All participants are requiredto sign-in. Failure to attend or tardiness will render bid ineligible. The Site VisitCertification will be provided at the end of the Site Visit and must be submitted with the Bid.The successful Bidder shall be required to furnish a 100% Performance Bond and a 100%Payment Bond if it is awarded the contract for the Work. The successful Bidder maysubstitute securities for any monies withheld by the District to ensure performance underthe Contract, in accordance with the provisions of section 22300 of the Public ContractCode.The successful Bidder shall comply with all requirements of Division 2, Part 7, Chapter 1, ofthe Labor Code and Title 8 of the California Code of Regulations. For all work performedpursuant to this Contract, the Contractor and all subcontractors shall pay all workers notless than the general prevailing rate of per diem wages and for holiday and overtime workas determined by the Director of the Department of Industrial Relations, State of California,(“DIR”) for the type of work performed and the locality in which the work is to be performedwithin the boundaries of the District, pursuant to sections 1770 et seq. of the CaliforniaLabor Code. Prevailing wage rates are also available from the District or the DIR websiteat: http://www.dir.ca.gov. This Project is subject to labor compliance monitoring andenforcement by the DIR.The Board reserves the right to reject any and all bids and/or waive any irregularity in anybid received. Unless otherwise required by law, no bidder may withdraw its bid for ninety(90) days after the date of the bid opening.END OF DOCUMENTSTOCKTON UNIFIED SCHOOL DISTRICTGLEASON PARK FENCING IMPROVEMENT, IFB # 26-12INFORMAL BID PACKET - CUPCCAANOTICE INVITING INFORMAL BIDS - 3INSTRUCTIONS TO BIDDERSContractors shall follow the instructions in this document, and shall submit all documents,forms, and information required for consideration of a Bid.Stockton Unified School District (“District”) will evaluate information submitted by theapparent low Bidder and, if incomplete or unsatisfactory to District, Bidder’s bid may berejected at the sole discretion of District.1.Bids are requested for a general construction contract, or work described in general,(“Work”) for the following project:EDNA GLEASON PARK FENCING IMPROVEMENT PROJECT #IFB 26-12 (“Project”).2.District will receive sealed Bids from Bidders as stipulated in the Notice to Bidders.3.The District has prequalified bidders pursuant to Public Contract Code section20111.5. Only prequalified Bidders will be eligible to submit a Bid for this Project.Any Bid submitted by a Bidder who is not prequalified shall be deemednonresponsive and will not be considered.4.District will receive sealed bids from bidders as stipulated in the Notice to Bidders.a.All bids must be sealed in an envelope, marked with the name and address ofthe Bidder, name of the Project, the Project Number and/or bid number, andtime of bid opening.b.Bids must be submitted to the SUSD Maintenance & Operations Office, 1932N. El Pinal Drive, Stockton, Ca 95205 by date and time shown in the Notice toBidders.c.Bids must contain all documents as required herein.5.Bidders are advised that on the date that bids are opened, telephones will not beavailable at the District Offices for use by bidders or their representatives.6.Bids will be opened at or after the time indicated for receipt of bids.7.Bidders must submit Bids on the documents titled Bid Form and Proposal and mustsubmit all other required District forms. Bids not submitted on the District's requiredforms shall be deemed nonresponsive and shall not be considered. Additional sheetsrequired to fully respond to requested information are permissible.8.Bidders shall not modify the Bid Form and Proposal or qualify their bids. Biddersshall not submit to the District a re-formatted, re-typed, altered, modified, orotherwise recreated version of the Bid Form and Proposal or other District-provideddocument.9.Bids shall be clearly written and without erasure or deletions. District reserves theright to reject any bid containing erasures, deletions, or illegible contents.STOCKTON UNIFIED SCHOOL DISTRICTGLEASON PARK FENCING IMPROVEMENT, IFB # 26-12INFORMAL BID PACKET - CUPCCAAINSTRUCTIONS TO BIDDERS - 110. Bidders must supply all information required by each Bid Document. Bids must befull and complete. District reserves the right in its sole discretion to reject any Bid asnon-responsive as a result of any error or omission in the Bid. Bidders mustcomplete and submit all of the following documents with the Bid Form and Proposal:a.Bid Bond on the District's form, or other security.b.Designated Subcontractors List.c.Site Visit Certification, if a site visit was required.d.Non-Collusion Declaration.11. Bidders must submit with their Bids a cashier's check or a certified check payable toDistrict, or a bid bond by an admitted surety insurer of not less than ten percent(10%) of amount of base Bid, plus all additive alternates (“Bid Bond”). If Bidderchooses to provide a Bid Bond as security, Bidder must use the required form ofcorporate surety provided by District. The Surety on Bidder’s Bid Bond must be aninsurer admitted in the State of California and authorized to issue surety bonds inthe State of California. Bids submitted without necessary bid security will be deemednon-responsive and will not be considered.12. If Bidder to whom a contract is awarded (“Contract” or “Agreement”) fails or neglectsto enter into Contract and submit required bonds, insurance certificates, and allother required documents, within SEVEN (7) calendar days after the date of theNotice of Award, District may deposit Bid Bond, cash, cashier's check, or certifiedcheck for collection, and proceeds thereof may be retained by District as liquidateddamages for failure of Bidder to enter into Contract, in the sole discretion of District.It is agreed that calculation of damages District may suffer as a result of Bidder'sfailure to enter into the Contract would be extremely difficult and impractical todetermine and that the amount of the Bidder’s required bid security shall be theagreed and conclusively presumed amount of damages.13. Bidders must submit with the Bid the Designated Subcontractors List for thosesubcontractors who will perform any portion of the Project, (“Subcontractor”)including labor, rendering of service, or specially fabricating and installing a portionof the Work or improvement according to detailed drawings contained in the plansand specifications, in excess of one half of one percent (0.5%) of the total Bid.Failure to submit this list when required by law shall result in bid being deemednonresponsive and the bid will not be considered.14. All of the listed subcontractors are required to be registered as a public workscontractor with the Department of Industrial Relations pursuant to the Labor Code.a.An inadvertent error in listing the California contractor license number on theDesignated Subcontractors List shall not be grounds for filing a bid protest orgrounds for considering the bid nonresponsive if the correct contractor’slicense number is submitted to the District within 24 hours after the bidopening and the corrected number corresponds with the submitted name andlocation for that subcontractor.STOCKTON UNIFIED SCHOOL DISTRICTGLEASON PARK FENCING IMPROVEMENT, IFB # 26-12INFORMAL BID PACKET - CUPCCAAINSTRUCTIONS TO BIDDERS - 2
- Commodity Codes
-
- NAICS 236220Commercial and Institutional Building Construction
- NAICS 238990All Other Specialty Trade Contractors
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
St. Vincent's Reinforced Conc...
Project: St. Vincent's Reinforced Concrete Box Culvert (RBC) Reinforced Fill (ML MP 22.18
Sonoma-Marin Area Rail Transit
Bid Due: 7/16/2026
Bishop Airport Fencing Perime...
Project ID: Title: Bishop Airport Fencing Perimeter Replacement - Phase 1 Addenda: 0
Inyo County
Bid Due: 7/15/2026