CONSTRUCTION INSPECTION / SUPPORT SERVICES
Project Information
- Bid Title
- CONSTRUCTION INSPECTION / SUPPORT SERVICES
- Issuing Agency
- City of Daly City
- Location
- California
- Published Date
- Jun 17, 2026
- Closing Date
- Jun 23, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
CONSTRUCTION INSPECTION / SUPPORT SERVICES
Date Released: 05/28/2026
RFP NOTICE:
The City of Daly City (City) hereby requests proposals from qualified firms to provide construction inspection/support services for the Westlake Slurry Seal Project in Daly City. The project bids will be opened on June 2, 2026. It is anticipated that the project will be awarded in June 2026. Upon request, the construction documents will be made available to inquiring firms. All questions regarding this Request for Proposals (RFP) shall be directed to Benjamin Zee, Engineer I, at bzee@dalycity.org . Questions submitted after the questions submittal deadline listed in this RFP may not be answered. At the City’s discretion, a list of questions and answers may be published.
Proposals shall be submitted by firms that have a capable and demonstratable background in the type of work described in Section C, "SCOPE OF SERVICES," of this notice. In addition, all interested firms shall have sufficient, readily available resources in the form of trained personnel, support services, specialized consultants, and financial resources to carry out the work without delay or shortcomings.
The proposals shall be submitted electronically to the Engineering Division of the Public Works Department, City of Daly City, by e-mail to bzee@dalycity.org no later than:
4:00 p.m. on June 23, 2026
Each proposer shall submit one (1) electronic copy of the proposal in PDF format in accordance with Section II, "SUBMITTAL REQUIREMENTS."
PROJECT DESCRIPTION:
The consultant shall provide construction inspection and support services required for the complete construction of the project. The construction costs for the Westlake Slurry Seal are approximately $3.0 million. The time of completion established for contract work is one hundred twenty-five (125) working days. The project will include:
- Asphalt concrete (AC) deep-lift repairs
- Crack seal
- Protection of utility manhole frames and covers, utility boxes, and monument boxes
- Application of slurry seal
- Removal and application of pavement striping and markings
- Traffic control
- Removal and replacement of sanitary sewer and storm drain manhole frame and covers to finished grade
- Removal and replacement of water valve frame and cover to finished grade
- Removal and replacement of monument box and cover to finished grade
- Adjustment of sanitary sewer and storm drain manhole frame and covers including utility boxes, monument boxes and water valve box/lid to finished grade
- Street sweeping/cleaning
REQUESTED SCOPE OF SERVICES:
The Consultant shall perform the following professional services described in this section.
PART I. INSPECTION
Project inspection shall be full-time by qualified personnel throughout the duration of the project. Inspector will include construction observation and acceptance of testing as specified in contract specifications. Digital still photos and video records shall be taken of work progress to document the Contractor’s work. All construction activities shall be coded using the CPM schedule activity numbers and bid item number.
Project inspector shall observe, monitor, inspect, and document all aspects of the contractor’s daily activities including manpower, equipment, and materials. The project inspector shall ensure the prosecution of the work is in accordance with the approved contract documents.
Due to the potential of concurrent activities taking place at various locations and dates, consultant shall provide available qualified full-time inspectors to ensure all activities are under supervisions at all times.
Project inspector(s) shall ensure the Contractor’s temporary installations including, but not limited to traffic controls, material storage, and work areas are provided and maintained in accordance with approved plans, City standards, industry practices and OSHA guidelines, and that the ROW is safely accessible by both vehicles and pedestrians as intended.
Deliverables:
- Digital still photos and video records
- Daily and Weekly Inspection Reports
DOCUMENTS:
RFP - Westlake Slurry Seal for Construction Inspection / Support Services (PDF)
- Attachment Preview
- To access this preview, please sign up here.
- Commodity Codes
-
- NAICS 541330Engineering Services
- NAICS 541350Building Inspection Services
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
On-Call Construction Quality ...
Project ID: 2026-PURB RFP-0063 Title: On-Call Construction Quality Assurance Services for Kiefer Landfill
Sacramento County
Bid Due: 8/24/2026
Accredited Water Quality Labo...
Project ID: Title: Accredited Water Quality Laboratory Testing, Analysis, and Reporting Services -
City of Anaheim
Bid Due: 8/26/2026