Measure 2.1 - Battery Electric Freight Vehicle Deployment Incentive Program
Project Information
- Bid Title
- Measure 2.1 - Battery Electric Freight Vehicle Deployment Incentive Program
- Issuing Agency
- South Coast Air Quality Management District
- Location
- California
- Published Date
- Aug 1, 2025
- Closing Date
- Nov 28, 2025
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- PA2026-02
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Bid Number Title Bidder's Conference Closing Date Contact Person Document PA2026-02 Measure 2.1 - Battery Electric Freight Vehicle Deployment Incentive Program
None 11/28/2025
12:00 PMInvest Clean -onroad
(909) 396-2000PA2026-02
- Attachment Preview
-
Program Announcement#PA2026-02Measure 2.1 - Battery Electric Freight VehicleDeployment Incentive ProgramAccepting Applications: August 15, 2025, at 12 PM PTSubmission Deadline: November 28, 2025, at 12 PM PTPA2026-02INTRODUCTIONIn July 2024, US EPA awarded funds to the South Coast Air Quality Management District(South Coast AQMD) to implement INVEST CLEAN in Los Angeles-Long Beach-Anaheim andRiverside-San Bernardino-Ontario Metropolitan Statistical Areas (MSAs). The two MSAsinclude the following four counties: Los Angeles, Orange, Riverside, and San Bernardino.INVEST CLEAN targets the limiting factors and challenges to the electrification transformationof the Southern California goods movement corridor.The purpose of this Program Announcement (PA) is to solicit project applications for INVESTCLEAN – Measure 2.1: Battery Electric Freight Vehicle Deployment Incentive Program. ThisProgram will provide funding rebates for the transition of goods movement operations toadvanced technologies and reduce emissions by replacing heavy-duty Class 8 diesel freightdelivery vehicles with Class 8 trucks that are powered by battery-electric technology.SECTION 1 – PROGRAM OVERVIEWThe total rebate funding for Measure 2.1: Battery Electric Freight Vehicle Deployment IncentiveProgram is approximately $28,000,000 from the INVEST CLEAN funds awarded to the SouthCoast AQMD. All applications will be evaluated based on the requirements set forth in this PA,which align with the INVEST CLEAN workplan and the Terms and Conditions of the grantawarded to INVEST CLEAN.WHO:WHAT:HOW:WHEN:Applicants may be public or private entities currently operating a Class 8 vehiclefor goods movement. Eligible applicants are asset-owners/operators.Incentives under this PA are rebate-based and limited to the replacement ofdiesel-fueled Class 8 trucks with Class 8 trucks powered by battery-electrictechnology. Only Class 8 (GVWR 33,001 pounds or higher) goods movementtrucks are eligible for this rebate. An equivalent baseline truck that will bescrapped must be diesel-fueled.Applications must be submitted online through South Coast AQMD's GrantManagement System (GMS), which can be found at:http://www.aqmd.gov/investcleanApplications can be submitted starting August 15, 2025, at 12 PM PT and theapplication period closes on November 28, 2025 at 12 PM PT or until programfunds are exhausted.ItemIssue PA2026-02Applications OpenDateAugust 1, 2025August 15, 2025, at 12 PM PT1PA2026-02Deadline to Submit ApplicationAgreement ExecutionPerformance and usage trackingNovember 28, 2025, at 12 PM PT or untilfunds are expended (whichever comes earlier)January 2026 through August 2027Commencing after DeploymentALL APPLICATIONS MUST BE RECEIVED VIA SOUTH COAST AQMD’SONLINE GRANT MANAGEMENT SYSTEM (GMS)1.1 - GENERAL PROGRAM INFORMATIONIncentive funding under this PA is rebate-based. Only diesel Class 8 goods movement trucks areeligible for a rebate under this Program. South Coast AQMD staff will evaluate all applicationssubmitted online as they are received until the application deadline, or until all funds areexhausted, whichever date occurs first.Eligible Participant• The applicant must provide proof of compliance with applicable fleet/truck regulationsduring the application process.• If awarded, the applicant must enter into a written Agreement with South Coast AQMDas a condition of receiving rebate funds. See SECTION IV – PROJECT AGREEMENT• The applicant must agree to adhere to all applicable Terms and Conditions. SeeSECTION VI – LEGAL UPDATES AND DEFINITIONSEligible Existing Vehicle• The existing vehicle must be diesel-powered.• The existing vehicle must be domiciled and have operated at least 75% within either oneor both MSAs for the prior 12 months from application submittal. The MSA regions areshown in the dotted areas on the map below in Figure 1, which include the four counties:Los Angeles, Orange, Riverside, and San Bernardino.• The existing vehicle must have operated a minimum of 7,000 miles during the 12 monthsprior to application.Eligible Replacement Vehicle• The replacement vehicle must be brand new and battery-electric powered.• The replacement vehicle must not be powered by hydrogen or any fossil fuels.• The replacement vehicle must not be a retrofit, repower, or conversion.• The replacement vehicle must be deployed no later than February 2028.• The replacement vehicle must operate at least 75% within one or both of the MSAs for aminimum of 5 years after vehicle deployment.2PA2026-02Figure 1: Area inside dotted line represents the two MSAs qualified territories1.2 - ELIGIBLE FUNDING AMOUNTEach eligible Class 8 truck project will receive a rebate amount up to $400,000.While Program grants can be combined with other non-federal grants and incentives, in no case may thetotal grant/rebate funds be greater than 100% of a project’s total cost, as explained in Section 1.3 below.1.3 - PROJECT COSTAll project costs must be clearly indicated in the application. Applicants must provide an itemizeddealership or manufacturer quote for the replacement vehicle. Sales tax, Federal Excise Tax (FET), anddelivery fees are eligible costs under the INVEST CLEAN program. Please note that any combinedincentive funds with this opportunity cannot exceed the cost of the replacement truck.1.4 – PROGRAM WORKFLOWThe flowchart in Figure 2 depicts the evaluation process of a typical replacement project, whileTable 1 below provides a detailed explanation of each step. Projects will begin with an onlineapplication, followed by a project evaluation conducted by South Coast AQMD staff. This willbe followed by the execution of Agreements, project implementation, invoicing andreimbursement, and required reporting.3PA2026-02Figure 2: Lifecycle for Battery Electric Class 8 Vehicle Replacement Projects4
- Commodity Codes
-
- NAICS 335911Storage Battery Manufacturing
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
CDDAR - Crashed, Damaged, or ...
Follow CDDAR - Crashed, Damaged, or Disabled Aircraft Recovery Trailers Active Contract Opportunity
DEPT OF DEFENSE
Bid Due: 7/15/2026
CDDAR - Crashed, Damaged, or ...
Follow CDDAR - Crashed, Damaged, or Disabled Aircraft Recovery Trailers Active Contract Opportunity
DEPT OF DEFENSE
Bid Due: 7/15/2026