Replacement of HVAC Systems at the F. Wayne Hill Water Resources Center Operations Building
Project Information
- Bid Title
- Replacement of HVAC Systems at the F. Wayne Hill Water Resources Center Operations Building
- Issuing Agency
- Gwinnett County
- Location
- Georgia
- Published Date
- May 27, 2026
- Closing Date
- Jun 12, 2026
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- BL063-26 INV
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Replacement of HVAC Systems at the F. Wayne Hill Water Resources Center Operations Building
Buyer Contact : Anna.West@GwinnettCounty.com
Opening Date : 06/12/2026 03:00 PM EST
Addendum : BL063-26 ADD 3 , BL063-26 ADD 1 , BL063-26 ADD 2
Additional Documents : BL63-26 Attachments
- Attachment Preview
-
BL063-26Page 1 of 61March 24, 2026INVITATION TO BIDBL063-26The Gwinnett County Board of Commissioners is soliciting competitive sealed bids from qualified contractors for theReplacement of HVAC Systems at the F. Wayne Hill Water Resources Center Operations Building for the Departmentof Water Resources.Bids should be typed or submitted in ink and returned in a sealed container marked on the outside with the BL# andCompany Name. Bids will be received until 2:50 P.M. local time May 15, 2026, at the Gwinnett County FinancialServices - Purchasing Division – 2nd Floor, 75 Langley Drive, Lawrenceville, Georgia 30046. Any bid received after thisdate and time will not be accepted. Bids will be publicly opened and read at 3:00 P.M.The bid opening will be virtual ONLY. To access the bid opening virtually, visit the following link:https://gwinnettgov.webex.com/gwinnettgov/j.php?MTID=mdf33266278ea1250c94b5b0914c276d7. Apparent bidresults will be available the following business day on the website www.GwinnettCounty.com.A pre-bid conference is scheduled for 10:00 A.M. on April 23, 2026, at the Gwinnett County F. Wayne Hill WaterResources Center Conference Room located at 1500 One Water Way, Buford, GA 30519. All contractors are urged toattend. Questions regarding bids should be directed to Anna West, Purchasing Associate II, atAnna.West@GwinnettCounty.com or by calling 770-822-7862, no later than April 28, 2026. Bids are legal and bindingupon the vendor when submitted. All bids should be submitted in duplicate.All suppliers must submit with bid, a bid bond, certified check or cashier's check in the amount of five percent (5%) ofthe total bid. Failure to submit a bid bond with the proper rating will result in the bid being deemed non-responsive. Successful supplier will be required to meet insurance requirements, submit a one hundred percent(100%) performance bond and a one hundred percent (100%) payment bond. Insurance and Bonding Company shouldbe licensed to do business by the Georgia Secretary of State, authorized to do business in Georgia by The GeorgiaInsurance Department, listed in the Department of Treasury's Publication of Companies holding Certificates ofAuthority as Acceptable Surety on Federal Bonds and as acceptable reinsuring companies. The bid bond, paymentbond, and performance bond must have an A.M. Best rating of A-7 or higher.Gwinnett County does not discriminate on the basis of disability in the admission or access to its programs oractivities. Any requests for reasonable accommodations required by individuals to fully participate in any openmeeting, program or activity of Gwinnett County Government should be directed to the ADA Coordinator at theGwinnett County Justice and Administration Center, 770-822-8165.The written bid documents supersede any verbal or written prior communications between the parties.Award will be made to the contractor submitting the lowest responsive and responsible bid. Gwinnett County reservesthe right to reject any or all bids to waive technicalities and to make an award deemed in its best interest. Bids maybe split or awarded in entirety. Gwinnett County reserves the option to negotiate terms, conditions and pricing withthe lowest responsive, responsible vendor(s) at its discretion.Award notification will be posted after award on the County website, www.gwinnettcounty.com and companiessubmitting a bid will be notified via email.We look forward to your bid and appreciate your interest in Gwinnett County.Anna WestPurchasing Associate IIThe following pages should be returned in duplicate as your bid:Bid Schedule, Pages 5-8Equipment Information, Page 9References, Page 10Code of Ethics, Page 11Contractor Affidavit and Agreement, Page 12Bid Bond, Pages 13-14BL063-26Page 2 of 61SCOPE OF WORK:F. Wayne Hill Water Resource Center (FWHWRC) is experiencing issues with the HeatingVentilation Air Conditioning (HVAC) equipment that services the Operations Building. The buildingand HVAC systems were installed in 2002. Two of the Air Handling Units (AHU) are located in amechanical room on the ground level and are accessible through double doors. The third unit islocated on a mezzanine floor space above the laboratory and is only accessible using a verticalfixed mounted ladder through an approximate 30” by 30” opening in the mezzanine floor. All unitsare supplied with chilled water from a chilled water system located outside the building.An assessment of the system performance and operation of the equipment was completed inApril 2024. The assessment highlighted the underperformance of three AHUs and the fanpowered terminal units. Concerns related to the chilled water capacity and pump control werealso noted. Further, the assessment revealed control and communication issues with the existingCarrier iVue DDC automated control system. It was also highlighted that most of the equipmenthas reached the end of its useful life.In order to restore the HVAC system to provide the required conditioned space within theOperations Building, Gwinnet County require replacement of the existing Control System, threeHVAC/AHU units, all the Variable Air Volume (VAV) Terminal Units and the two chilled waterpumps. The two accessible AHUs are to be removed and replaced in their current locations. Thethird AHU is to be demolished into small pieces for removal through a manway access, and thereplacement unit relocated to the Warehouse to provide better access for future repair andmaintenance. The two chilled water pumps and their appurtenances are to be replaced.Bids are requested for the supply and complete installation of replacement equipment and allmodifications to the existing equipment pads, ducting, chilled water pipes, drains, electrical andcontrol connections required for the complete operation, control and monitoring of the systemswithin the Operations Building. The location of FWHWRC is 1500 One Water Way, Buford, GA30519. The location of the Operations Building is shown in Figure 1.BL063-26Page 3 of 61A critical component of this project is the Operations Building will be in use and occupied 24/7during construction and work will need to be carried out with no interruptions to plant operations.The Contractor will be responsible for setting up temporary cooling units to maintain the buildingtemperatures during the work.Bids are requested for the following services:1. Supply of all information requested on this bid.2. Site visit to confirm any measurements prior to preparation of the shop drawings.3. Assessment of the existing electrical connections to ensure they are rated for replacementequipment.4. Submission of specified submittals for approval prior to ordering equipment and materials.5. Procure, deliver and install the following replacement equipment:o Chilled Water Pumps and Trim (pressure gauges and triple duty valves)o Air Handling Unitso Automated Controlso VAVso Ducts and pipingo Electrical equipmento Dampers6. Modifications to existing ducts, pipework electrical systems and control systems andstructures and installation of the replacement equipment and all ancillaries.7. Provide a manufacturing and delivery schedule and provide monthly progress updates.8. Coordination and delivery to FWHWRC, 1500 One Water Way, Buford, GA, 30519.9. Provision of temporary cooling.10. Start up assistance and Owner training.11. Provision of Operating and Maintenance manuals.The scope of work is detailed in Attachment 1. Project Drawings and Specifications are providedin Attachments 2 and 3 respectively. Record drawings are provided in Attachment 4.The following information sheets should be submitted with the bid.1. Make, model, and weight of each component.2. Manufacturer’s catalog information, descriptive literature, specifications, and materials ofconstruction.3. Complete description of equipment and other ancillary items.4. Plan and section views of equipment and dimensional tolerances required for installationand maintenance.5. A complete listing of materials.6. Drawings of AHU and VAV.7. Manufacturer Certificate of Compliance with materials specifications shall be submittedprior to shipment of the equipment. The certificate shall certify that materials,manufacturer, and final product conforms to or exceeds specified requirements and intentfor which the product will be used. Submit supporting reference data, affidavits, andcertificates as appropriate. The certificate may reflect recent or previous test results onmaterial or product, acceptable to the Engineer.8. Table 1 Preliminary Equipment Information SummaryBL063-26Page 4 of 61PRELIMINARY CONSTRUCTION SCHEDULEThe Operations Building will be occupied during the project as essential activities are required tobe maintained to keep the facility operational. Disruption to normal plant operation andoccupation of the different space is to be minimized. Coordination with Owner’s Plant staff isrequired to establish an overall work sequencing and schedule for each element of the work. Apreliminary work sequence is proposed below for information purposes and to enable contractorsto consider the most efficient work sequence and schedule that will be acceptable to operationsstaff and minimize the need for temporary cooling.1. Replacement of the chilled water pumps to maintain supply to AHU units.2. Replacement of one HVAC system (serviced by a single AHU and all associated VAVs,ducts, pipes, electrical etc.) at a time. One system can be taken out of services and replacedwhilst the two other systems remain in operation: Once the system has been replaced andis returned to operation, the next system can be taken out of service. This will allow partialcooling during the work.BL063-26Page 5 of 61FAILURE TO RETURN THIS PAGE AS PART OF YOUR BID DOCUMENT MAY RESULT IN REJECTIONBID SCHEDULEITEM#DESCRIPTIONPART 1 - GENERALPost award onsite visit to obtain information to1.1 confirm installation, electrical and controlrequirements and modifications.1.2Submittal preparation, shop drawings andsubmissions.1.3 Provide Temporary Cooling SystemsProvide two hard copies and one electronic1.4 copy of the operating and maintenancemanuals for all equipment items.Onsite training to Owner staff on systemoperation and1.5maintenance including all travel,accommodation andancillary expenses etc. (two non-consecutivevisits of 8 hours each day).1.6Cost for post-handover assistance of 1 dayvisit if requested by Owner.QTYMANUFACTURER& NO.1 LS1 LS16Weeks1 LS2 DAYS1 DAYDelivery A.R.OUNIT PRICE$$$$$$PART 2 – 61-AIR HANDLING UNIT-1Disconnect, demolish, remove and dispose of2.1 existing unit, including all ancillaries not1 LS$required for replacement unit.2.2 Procure and deliver unit.1 LS$Install unit including all modifications to2.3 equipment pads and connections to existing1 LS$ducting and piping.2.4 Electrical and control modifications.1 LS$2.5 Testing, start up and balancing.1 LS$TOTAL COST$$$$$$$$$$$Company Name:
- Commodity Codes
-
- NAICS 238220Plumbing, Heating, and Air-Conditioning Contractors
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
CSU_J-465-DP One Arsenal Plac...
Event ID Event Title Government Entity Start Date (ET) End Date (ET) PE-47200-RFQ-2026-000000142
State Government of Georgia
Bid Due: 7/16/2026
GSU - Chiller Replacement, Li...
Event ID Event Title Government Entity Start Date (ET) End Date (ET) 50900-eRFQC-001795-2026
State Government of Georgia
Bid Due: 7/21/2026