2025 Electrical and Ground Power Substation Replacement
Project Information
- Bid Title
- 2025 Electrical and Ground Power Substation Replacement
- Issuing Agency
- Metropolitan Airports Commission (MAC)
- Location
- Minnesota
- Published Date
- Sep 15, 2025
- Closing Date
- Oct 16, 2025
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- Solicitation085
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Project: 2025 Electrical and Ground Power Substation ReplacementRef. #: Solicitation085Department: Airport DevelopmentType: RFBStatus:OpenOpen Date: Sep 15th 2025, 8:00 AM CDTQuestions Due Date: NeverContact Information: Chris Roy, Chris.Roy@mspmac.orgClose Date: Oct 16th 2025, 2:00 PM CDTProject Number(s):106-2-1040
Project Description: This project builds a new one-story addition onto Concourse C at Terminal 1 between gate C3 and C4, and on Concourse G extends an electrical substation and replaces equipment. Civil work will include testing and disposal of contaminated soils, traffic control and perimeter security, pavement removal and replacement (airside and landside), pedestrian ramp and stair removal and replacement, curb and gutter removal and replacement, sanitary sewer, watermain, and signing and pavement markings, excavation, backfilling, fuel pump and fuel tank removals, and building demolition. Construction will include waterproofing, concrete work, masonry, structural steel framing and cold formed metal framing, metal wall panels, doors and a window, roofing, spray fireproofing, asbestos abatement, gyp board work, ceilings, and painting. Mechanical will include installation of VAVs, Fan Coil Units, Unit Heaters, and associated piping, ductwork, and controls. Plumbing will include installation of sanitary piping, flammable waste systems, water meter replacement and piping, miscellaneous fixtures and floor drains, and roof drains. Electrical will include re-routing of existing feeder to passenger boarding bridges, installation of panelboards and transformers, re-routing of existing circuits to replace and relocate panelboards, installation of duct banks for future use, installation of lighting fixtures and associated controls, and installation of data and access controls systems. At Concourse G, the electrical work includes removal of existing substation and replacing it with a new substation line-up including medium voltage switches, medium voltage to low voltage transformers, low voltage switchgear, installation of an Automatic Transfer Switch, and installation of panelboards and transformers. Existing medium voltage feeder, branch feeders and branch circuits will be extended to new equipment locations. Data drops and fire alarm detection and notification are also included in the scope.
- Commodity Codes
-
- NAICS 237130Power and Communication Line and Related Structures Construction
- NAICS 238210Electrical Contractors and Other Wiring Installation Contractors
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.