Running Hill Road Sidewalk
Project Information
- Bid Title
- Running Hill Road Sidewalk
- Issuing Agency
- City of South Portland
- Location
- Maine
- Published Date
- Apr 1, 2026
- Closing Date
- Apr 23, 2026
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- 25-26
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Bid Number: 25-26
Bid Title: Running Hill Road Sidewalk
Category: All Bids Status: Open Bid Recipient: Matt Fitzgerald, Purchasing Agent Description: Sealed bids for construction of the Running Hill Road Sidewalk (Bid 25-26) will be received by the City of South Portland Purchasing Office, South Portland City Hall, 25 Cottage Road, South Portland, ME 04106 until April 23, 2026 at 2:00 p.m. local time and then at said office publicly opened and read aloud. Bids submitted after this time will not be accepted. Each bidder must submit a single sealed envelope, the outside of which must be clearly marked “Bid for Running Hill Road Sidewalk (Bid 25-26)”.
Location The Project is located along Running Hill Road between Maine Mall Road and the Popeyes driveway. The Project also includes ramp construction on the southeast corner of the intersection and median island reconstruction on Maine Mall Road for a new pedestrian crossing.
Outline of Work The work includes: Construction of a bituminous sidewalk including associated granite curb and paving. Additional work includes, but is not limited to, earthwork, pedestrian and vehicular traffic control, and all associated work as shown on contract drawings and documents.
Basis of Award Contract shall be awarded to the responsible bidder whose bid, complying with conditions and requirements provided in this Notice and Bid Form, is the lowest total base bid as identified on the bid form.
Other Information The contractor shall make note of the schedule requirements presented in the contract documents. The City intends completion of the work in its entirety by June 15, 2026. The Contractor may start at any time, as approved by the City. Work is to be completed within 30 calendar days and the Contractor shall work continuously upon commencement of the work. The Issuing Office is Sebago Technics, 75 John Roberts Road, Suite 4A, South Portland, ME 04106. Electronic (PDF) copies of the Contract Documents may be obtained by contacting Michael Feely at For security reasons, you must enable JavaScript to view this E-mail address. or 207-200-2137. Hard copies of Contract Documents may be obtained upon request and payment of a fee of $100.00 per set. Plans and specifications will be available on March 26, 2026, after 10:00 a.m. Partial sets will not be distributed. All requests for mailed documents must be accompanied by an additional non-refundable fee of $25.00 to cover postage and handling. Checks should be made payable to SEBAGO TECHNICS.Credit cards will not be accepted.
To be considered a responsive Bidder, the Contractor shall have obtained one set of plans and specifications electronically (PDF format) from the Engineer (Sebago Technics). A link to download the plans may be obtained by contacting Michael Feely at For security reasons, you must enable JavaScript to view this E-mail address. or 207-200-2137. The Bid will not be awarded to the Bidder unless a record for obtaining documents from the Engineer exists in the office of the Engineer.
A Mandatory Pre-Bid Conference will be held for General Contractors via Google Meet on April 9, 2026, at 9:00 a.m. at the following link: https://meet.google.com/tyx-bqqb-tjj
Attendance by Subcontractors, while encouraged, is not mandatory.
All questions are to be submitted to the Engineer in writing. Questions may be transmitted by e-mail to For security reasons, you must enable JavaScript to view this E-mail address. . Questions received less than five (5) working days prior to the date for opening of Bids may not be answered. Only questions answered by Addenda will be binding.
A bid must be accompanied by Bid security made payable to Owner in an amount of 5% of Bidder’s maximum bid price and in the form of a certified check or Bid bond issued by surety meeting the requirements of the General Conditions. No bid may be withdrawn for at least 60 days after receipt of bids unless released by the Owner.
A completed Bid Form and Bid Security, with verification of bonding capacity and other attachments identified in the instructions must be submitted with the Bid.
Within five days after the receipt of bids, the apparent low responsive bidder shall deliver to the Engineer and Owner for review and acceptance the listing of subcontractors, suppliers or entities for the work listed in Supplementary Condition SC-7.06.
The successful bidder must furnish within 10 calendar days after the Notice of Award the required number of copies of the signed Agreement, 100% Performance Bond, 100% Payment Bond, Insurance Policy and begin execution of this contract within 10 calendar days following the Notice to Proceed. The General Contractor shall be responsible for the full amount the 100% Performance Bond and the 100% Payment Bonds. Combining bonds of subcontractors is not acceptable.
By Order of the City Council of South Portland
Publication Date/Time: 4/1/2026 4:00 PM Publication Information: Portland Press Herald Closing Date/Time: 4/23/2026 2:00 PM Submittal Information: mfitzgerald@southportland.gov Pre-bid Meeting: 04/09/2026 Download Available: yes Fee: No Fee Business Hours: 8:00 to 5:00 M - Th Related Documents: View Document(s) - Commodity Codes
-
- NAICS 237310Highway, Street, and Bridge Construction
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Maintenance Dredging, Kennebe...
Follow Maintenance Dredging, Kennebec River, Kennebec Maine Active Contract Opportunity Notice ID W912WJ26BA015
DEPT OF DEFENSE
Bid Due: 7/28/2026
Maine Air National Guard Fuel...
Follow Maine Air National Guard Fuel Cell Hangar Construction Active Contract Opportunity Notice
Federal Agency
Bid Due: 7/16/2026