5938 Chamber Creek Bridge Replacement
Project Information
- Bid Title
- 5938 Chamber Creek Bridge Replacement
- Issuing Agency
- Pierce County
- Location
- Washington
- Published Date
- Apr 8, 2026
- Closing Date
- May 6, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Project ID:
Title: 5938 Chamber Creek Bridge Replacement
Addenda: 1
Release Date: 4/8/2026
Due Date: 5/6/2026
5938 Chamber Creek Bridge ReplacementFollowLast updated by Addendum #1 on Apr 9, 2026 5:26 AM See what changedRequest For QualificationPlanning and Public WorksProject ID: 2026-RFQ-112Release Date: Wednesday, April 8, 2026· Due Date: Wednesday, May 6, 2026 3:30pmPosted Wednesday, April 8, 2026 9:00amAll dates & times in Pacific TimeDraft Response No BidTime Remaining: 27 days, 21 hours, 27 minutesOverview
Post Information
Posted At:Wed, Apr 8, 2026 9:00 AM
Sealed Bid Process:Yes (Bids Sealed / Pricing Sealed)
Private Bid:No
SummaryPierce County Planning & Public Works – Office of the County Engineer Division (County) solicits interest from consulting firms with expertise in Civil and Structural Engineering Design. This agreement will be for approximately two years in duration, beginning September 2026 and ending September 2028, with the option for the County to extend it for additional time and money if necessary.
The project is estimated to be between 6 and 8.5 Million.
BackgroundThe existing Chambers Creek Bridge #29202-A was built in 1946 and crosses over Chambers Creek on Chambers Creek Road West connecting the Town of Steilacoom and the City of University Place. The 65-foot long, 22-foot-wide bridge consists of four concrete-slab spans supported by twelve timber piles, with abutments reinforced by timber sheet piles. The existing facility has minimal shoulder widths, no pedestrian facilities and an FHWA Overall Condition Classification – Fair. The roadway classification for Chambers Creek Road is Secondary Arterial with a 2019 ADT of 7275.
The replacement of the Chambers Creek Bridge is an element of a larger effort to restore the Chambers Bay Estuary that involves the removal of the Chambers Creek dam, estuary bank protection measures including the transport of sediment above the bridge and dam, as well as riparian and marsh restoration. As part of a larger effort to restore the estuary, the bridge must be designed to future conditions following the removal of the Chambers Creek Dam, subject to tidal influence and differing hydrogeomorphology. The project area includes a salmonid bearing stream, wetlands, floodplains, geologic hazards, and possibly cultural resources.
This project will replace the functionally obsolete Chambers Creek Bridge and other associated work. This project will provide a constructability plan for relocation and reduction of impacts to utilities connected to, running under and within the vicinity of the existing bridge. Bridge replacement design will include relocation and protection of utility infrastructure that serves University Place, the Town of Steilacoom, and the City of Lakewood. It will also include pedestrian crossings and parking to improve safety and access to the adjacent Chambers Creek Canyon trail system. The bridge alignment and roadway reconfiguration must also allow for continued turning movements for a WB-40 semi-truck to enter the Chambers Creek Regional Wastewater Treatment Plant and the BNSF access road.
The County is initiating engineering design for County Road Project (CRP) 5938, the Chambers Creek Bridge Replacement Project. To support this effort, Pierce County is seeking an engineering firm to provide Preliminary and Final Design Engineering services for the project. This is anticipated to be a federally funded project and must adhere to the WSDOT Local Agency Guidelines. In 2023, Pierce County completed a Type, Size, and Location (TS&L) study for the bridge replacement project, which can be found here: Chambers Bay Estuary Restoration | Pierce County, WA - Official Website .
The major features of the project are as follows:
- Roadway, parking lot, and bicycle/pedestrian improvements related to the new bridge,
- Demolition plan for the existing bridge,
- Structural design for the proposed bridge and walls required for the bridge abutments and roadway approaches,
- Stormwater collection and treatment facilities,
- Pedestrian crossing enhancements and roadway illumination requirements for new pedestrian crossings and parking to improve access to the adjacent Chambers Creek Canyon trail system,
- Utility design for the new bridge and temporary utility bypasses during construction, including preconstruction investigations and ongoing coordination with utility providers and jurisdictions during the design process,
- Environmental permitting and mitigation,
- Communication and engagement with tribes, interested parties, and the community,
- Determination of Right-of-Way needs and plan preparation, and
- Coordination with teams working on the other stages of the larger estuary restoration project.
Timeline
Release Project Date:April 8, 2026Question Submission Deadline:April 15, 2026, 4:00pmProposal Submission Deadline:May 6, 2026, 3:30pmProposal Evaluation:Approximately three weeks after proposal submission deadline, proposals will be evaluated and interviews may be held if multiple proposers are deemed capable of meeting the requirements.Estimated Notice of Intention to Negotiate a Contract:Approximately six weeks after proposal submission deadline.Estimated Date of Contract Execution :Approximately eight weeks After proposal submission deadline. - Commodity Codes
-
- NAICS 237310Highway, Street, and Bridge Construction
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Construction of Systemic Safe...
Project Name Deadline Project Info Request for Bids: Construction of Systemic Safety Pedestrian
Covington city
Bid Due: 7/16/2026
RFP 2026- 2028 Road Maintenan...
Bid Title: RFP 2026- 2028 Road Maintenance RFB Category: Tribal Employment Rights Ordinance
Quinault Indian Nation
Bid Due: 7/09/2026