BRINE LINE PIGGING SERVICES
Project Information
- Bid Title
- BRINE LINE PIGGING SERVICES
- Issuing Agency
- City of Antioch
- Location
- California
- Published Date
- Mar 4, 2026
- Closing Date
- Apr 8, 2026
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- RFQ P.W. 694-B
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Bid Number: RFQ P.W. 694-B
Bid Title: BRINE LINE PIGGING SERVICES
Category: Public Works RFQs Status: Open Description: The City of Antioch seeks to retain the services of a qualified contractor to perform pigging operations for the City on an as-needed basis. The City intends to enter into a three (3)-year agreement with the selected consultant, with the option, at the City’s sole discretion, to extend the contract two (2) additional years.
The City operates a 4.3-mile-long brine line that will need to be pigged routinely to maintain the integrity and operation of the system. Pig launching and retrieval station have been installed at either end of the pipeline. Pigging operations will begin at the City’s Water Treatment Plant (WTP), located at 401 Putnam St, Antioch, CA 94509, and will be recovered at Delta Diablo located at 2500 Pittsburg-Antioch Hwy, Antioch, CA 94509.
Publication Date/Time: 3/4/2026 12:00 AM Closing Date/Time: 4/8/2026 2:00 PM Addendum Date/Time: April 1, 2026 Contact Person: Marcus Woodland, Water Treatment Plant Superintendent
[email protected]Related Documents: - Attachment Preview
-
REQUEST FOR QUALIFICATIONSFORBRINE LINE PIGGING SERVICESPROJECT NO. P.W. 694-BQualification Due Date: April 8, 2026, at 2:00 P.M.Public Works DepartmentWater Treatment Plant Division1201 W 4th StAntioch, CA 94509(925) 779-6950INTRODUCTIONThe City of Antioch seeks to retain the services of a qualified contractor to perform piggingoperations for the City on an as-needed basis. The City intends to enter into a three (3)-yearagreement with the selected consultant, with the option, at the City’s sole discretion, to extendthe contract two (2) additional years.The City operates a 4.3-mile-long brine line that will need to be pigged routinely to maintain theintegrity and operation of the system. Pig launching and retrieval station have been installed ateither end of the pipeline. Pigging operations will begin at the City’s Water Treatment Plant (WTP),located at 401 Putnam St, Antioch, CA 94509, and will be recovered at Delta Diablo located at2500 Pittsburg-Antioch Hwy, Antioch, CA 94509.The deadline for submission of qualifications for this work is April 8, 2026, at 2:00 P.M.SCOPE OF WORKPROJECT REQUIREMENTSA. Furnish necessary personnel, materials, and equipment to conduct the initial pigcleaning operation of the brine disposal pipeline.B. Refer to Attachment B for schematic of pigging operations.C. Existing Pipe Size and Materials:1. 14-inch High Density Polyethylene (HDPE) (AWWA C906).2. Actual ID: 12 inches.3. All elbows have 42-inch radius (min).D. Nominal pressure and velocity available for pigging operations:1. Available pressure from fire hydrant near pig launching vault at the WTP: 65pounds per square inch.2. Pipeline profile falls approximately 140 feet from the high point at the piglaunching vault at WTP to the connection to the outfall at Delta Diablo.3. Normal operational velocity in pipeline: 1,400 gallons per minute at 3.9 feet persecond.E. Pipeline/cleaning/testing lengths:1. Well Field section:a. Length: 22,700 feet (4.3 miles) from pig launch vault at WTP to outfall atDelta Diablo.b. Launch Vault at WTP: See contract drawing 25C03. For layout of pig launchvault.c. Receiver Vault at Delta Diablo: See contract drawing 25C07.F. Water for testing:1. Water for testing and cleaning will be provided by the City from the nearby firehydrant.G. Modifications to facilities for pipeline pigging operations:Page 2 of 91. Pig Launching at WTP: Contractor shall provide all temporary fittings andflanges needed for connection to the blind flange on the brine pipeline inside thevault, water connections, valves, piping, and other materials as needed for piglaunching operations.2. Pig Retrieval at Delta Diablo: Contractor shall provide all temporary fittings andflanges needed for connection to the blind flange on the brine pipeline inside thevault. Contractor shall also provide temporary storage tanks in the area shown inAttachment B for collecting all water and solids from the pigging operation.H. Disposal of water: Contractor shall be responsible for hauling away and legally disposingof all collected water and solids within three (3) days of completing pigging operations.I. Contractor responsible for coordination and compliance with Delta Diablo.PERFORMANCE/DESIGN CRITERIAA. Foam Pigs:1. Materials: Open-cell polyurethane foam body with densities as specified in thisSection.2. Spiral bands: Criss-crossed urethane bands used to assist in rotating the pig as ifmoves through the pipeline.3. Pigs shall be able to through reductions of up to 60 to 65 percent of cross-sectionalarea of the nominal pipe.4. Pig Cleaning Contractor shall provide the size and style of progressive pigs asnecessary to the conduct the initial cleaning operations.B. Pig tracking system to be used by Contractor:1. Transmitter is designed for the length of pipe being tested.2. Receivers and wands as needed.3. Batteries as needed.EXECUTIONPREPARATIONA. Pipeline shall be cleaned to remove most dirt and other foreign matter within the pipeline.Satisfactory precautions shall be taken to prevent scratching or scraping of interior wallsurfaces.INSTALLATIONB. General:1. New pig launching and retrieval vaults shall be used along with temporary facilitiesprovided by the Contractor. Review Appendix A (Launching and Receiving Vaults)for equipment layout areas.2. Install pigs in accordance with Pig Manufacturer's recommendations.C. Pigging:1. Prior to start of pigging operations, the Contractor shall assist in verifying that allpipeline isolation valves are fully open.Page 3 of 92. Prior to the use of the standard foam pig, a line-size swab made of soft plasticfoam shall be sent through the pipeline to ensure the piping systems fittings, valvesand interior dimensions will allow the initial cleaning pig to pass through withoutbeing trapped with the pipeline.3. Progressive pigging operation: Upon examination of this initial swab, subsequentpigs of varying diameters and/or densities shall be sent through the pipeline until itcan be determined that no obstacles and/or restrictions exist within the pipeline forthe stand pigging operations.4. Complete the final pigging operation by passing the specified line-size bare foampipe through the pipeline. The pig tracking transmitted shall be installed for thisfinal run.5. Contractor shall be responsible for locating and removing the pig should it becomelodged in the pipeline.6. Upon completion of cleaning operations remove the Pig Launching and RetrievalFacilities and reinstall blind flanges in the vaults.7. Return all valves to original position.Page 4 of 9FORMAT OF THE STATEMENT OF QUALIFICATIONSThe submittal is to be prepared in a bound 8 ½” x 11” format limited to approximately 25 pages,including brochures. Covers, dividers are not included in the page count. In addition, anyinformation that needs to be returned should not be submitted. The Consultant is requested toinclude the following information in the SOQ. It is expected that the SOQs will follow the orderlisted below:• Cover Letter introducing the firm and describing why you want to be considered. Providelocation of the office that will be performing the work• Organization Chart for the Project Team• Brief Information for Key Staff including education, directly related experience, descriptionof their assignment on this project, and résumé• A list of proposed sub-consultants, and a description of their proposed services• Summary of the Company’s Relative Experience and Performance• Summary of Approach for Completing the Work• Detailed Scope of Work of Activities Required• List of contracts/agreements terminated for convenience or default within the past threeyears, if any.• List any litigation that now affects or may affect in the future consultant firm’s ability toperform.• Confirm your firms’ ability to meet contract & insurance requirements.• Anticipated Labor Effort by Task and Classification for Each Activity• Milestone schedule for Project CompletionADDENDAAll questions regarding this RFQ must be submitted via email to Marcus Woodland atmwoodland@antiochca.gov by April 1, 2026, at 4:00 P.M. Questions received after this deadlinewill not be considered. Responses to all submitted questions will be issued via written addendumand published to the City website. Any addenda issued for this RFQ must be acknowledged andincluded within the proposer’s SOQ. The addenda will not count toward the page limit.CONSULTANT SELECTION PROCESSEnclosed is a copy of the City of Antioch’s Maintenance Services Agreement. By submitting aproposal for this work, a firm agrees to comply with all terms and conditions outlined in theagreement.It is anticipated that from the qualifications submitted, City staff will be able to select the firm bestsuited to meet the City’s needs. However, if that is not possible, the City will ask a “short list” offirms to meet with staff to discuss the project and the firm’s qualifications. The City will negotiatea professional services contract for the work after staff have determined the best qualified firm.Page 5 of 9
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Contract Delivery Service (CD...
Follow Contract Delivery Service (CDS) HCR 961C4 SOUTH LAKE TAHOE, CA - R029,
POSTAL SERVICE
Bid Due: 7/09/2026
Contract Delivery Service (CD...
Follow Contract Delivery Service (CDS) HCR 961C5 SOUTH LAKE TAHOE, CA - R027,
POSTAL SERVICE
Bid Due: 7/09/2026