Public Process for Southern Tier Trail - Design and Alignment
Project Information
- Bid Title
- Public Process for Southern Tier Trail - Design and Alignment
- Issuing Agency
- Cattaraugus County
- Location
- New York
- Published Date
- Sep 17, 2024
- Closing Date
- Nov 1, 2024
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Bid Due Date:Fri, 11/01/2024 - 2:00pmDepartment:Economic Development, Planning and Tourism
Request for Proposal (RFP) for Public Process for Southern Tier Trail - Design and Alignment
Cattaraugus County Department of Economic Development, Planning, and Tourism released on September 17th, 2024.
This proposal relates to the public process necessary to complete the final alignment, engineering, permitting and construction documents to complete the Southern Tier Trail project (STT).
Cattaraugus County is located in rural southwestern New York State. It is characterized by wooded hillsides interspersed with farm fields. The County has 42 municipalities, which include two cities, (Olean and Salamanca) nine villages and thirty-two towns.
Cattaraugus County Department of Economic Development, Planning and Tourism (EDPT) completed the Countywide Trail System Plan ( https://www.cattco.org/planning/trail-system-plan ) with the purpose to preserve and promote the County’s natural resources, maximize opportunities for outdoor recreation, increase the number and options for active transportation, and capitalize on the outdoor tourism industry. The Plan objective included surveying existing trails, determining the feasibility of connecting existing trails (within and beyond Cattaraugus County), identifying potential trail corridors and recommending trail improvements and potential new trails. This study recommended connecting to larger Western NY trail networks, including the Erie Cattaraugus Rail Trail and the Genesee Valley Greenway.
EDPT has moved that recommendation forward by partnering with GObike Buffalo, funded by The Ralph C. Wilson, Jr. Foundation, completing a feasibility study in February of 2022 for the Southern Tier Trail (STT) ( https://gobikebuffalo.org/project/southern-tier-trail-feasibility-study/ ). The study consisted of community outreach and an assessment for the design and construction of a shared-use bicycle and pedestrian path between the City of Buffalo, NY and the southern end of Genesee Valley Greenway State Park in Hinsdale NY, completing a full regional trail loop of Western New York. The route is intended to follow the Buffalo-Pittsburgh Rail corridor to the greatest extent possible from Buffalo to the City of Salamanca and along the Allegany River from the City of Salamanca to the Town of Hinsdale. The corridor runs through two counties, 11 towns, three villages, and portion of the Seneca Nation of Indian’s Allegany Territory.
The Southern Tier Trail (STT) project in Cattaraugus County will be a total of 52 miles of pedestrian infrastructure that will connect 11 communities in Cattaraugus County. Currently along this corridor, there are only 7 miles that have pedestrian, bicycle facilities, of which most are inadequate, and not ADA compliant. The goal of the STT will be to improve and expand the bicycle and pedestrian infrastructure, and ensure that the infrastructure is safe and comfortable for use by persons of all ages and abilities. Once developed, STT will provide a safe, affordable and accessible active transportation option for the lower income and underserved populations by connecting them with the option to walk or bike to the critical amenities in their area, which include jobs, healthcare, grocery stores, libraries and schools.
Cattaraugus County Department of Economic Development, Planning and Tourism (EDPT) applied for and was funded by the United States Department of Transportation for Rebuilding American Infrastructure with Sustainability and Equity (RAISE) 2023 Funding to complete the alignment, planning, design and construction documents for 52 miles of trail through Cattaraugus County. The 52 miles will cross into eleven municipalities.
Proposed Scope of WorkTask 1: Plan Review and Analysis/ Design a Public Process Plan
Questions
Task 2: Establish Advisory Groups
Task 3: With the assistance of EDPT Staff and Engineering Firm, identify the corridor and negotiate trail alignment
Task 4: Establishing Operation and Maintenance PlanThis will take you to the Catt. County Data Portal.
Submission of ProposalsAdvertisement: Monday September 23rdth, 2024
Bid Document(s)
Question Deadline: Monday, October 14th, 2024 at 4:00 pm EST
Posting of Addenda: Monday, October 21st, 2024 at 4:00 pm EST
RFP Proposal Due: Friday November 1st, 2024 at 2:00 pm EST - Commodity Codes
-
- NAICS 541330Engineering Services
- NAICS 541512Computer Systems Design Services
- NAICS 541611Administrative Management and General Management Consulting Services
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
MBE, WBE and SDVOB Subcontrac...
30 Title: MBE, WBE and SDVOB Subcontractor Procurement for CUCF - CUNY School
The New York State Contract Reporter
Bid Due: 7/15/2026
2026 Sidewalk Replacement Pro...
08 Title: 2026 Sidewalk Replacement Project (various locations) CR#: 2136444 Agency: Niagara Falls,
The New York State Contract Reporter
Bid Due: 7/09/2026