26500005 RFP Addendum 2 Master Planning and Design Services for the Public Works Ops Center
Project Information
- Bid Title
- 26500005 RFP Addendum 2 Master Planning and Design Services for the Public Works Ops Center
- Issuing Agency
- Christiansburg town
- Location
- Virginia
- Published Date
- Nov 14, 2025
- Closing Date
- Nov 24, 2025
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- 26500005 RFP
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Bid Number: 26500005 RFP
Bid Title: 26500005 RFP Addendum 2 Master Planning and Design Services for the Public Works Ops Center
Category: Bid / RFP Opportunities Status: Open Description: Town of Christiansburg
Purchasing Office
100 East Main Street
Christiansburg, VA 24073
November 14, 2025
Addendum #2
RFP 26500005 Master Planning and Design Services for the
Public Works Operations Center
This Addendum #2 amends or supplements Request for Proposals (RFP) 26500005 as indicated below.
- Clarification to Pre-Proposal Meeting Agenda
- Clarification to RFP
- Additional Post Meeting Questions Received
- All other terms and conditions in RFP 26500005 remain the same.
- The due date and hour remains November 24, 2025, 3:00 PM, EST.
The complete document can be viewed in the Purchasing Office or at Bid Postings • Town of Christiansburg • CivicEngage .
Publication Date/Time: 11/14/2025 12:00 AM Closing Date/Time: 11/24/2025 3:00 PM Addendum Date/Time: 11/14/2025 Pre-bid Meeting: Has past Contact Person: Tara Vance
Procurement Officer
tvance@christiansburg.org
540-585-7605
Business Hours: M-F, 8:00 a.m. – 5:00 p.m. Related Documents: - Attachment Preview
-
Addendum No. 2Request for ProposalsMaster Planning and Design Services for Public Works Operation CenterRFP Number: 26500005November 14, 20251 of 7Addendum No. 2Request for ProposalsMaster Planning and Design Services for Public Works Operation CenterClarification to Pre-Proposal Meeting Agenda: Item No. 5, SCOPE, Task 2 - Intermediate(50%), Pre-Final Design (90%) & Final Design (100%), shall read as follows:“Non-binding Task 2 design fee estimate needed for FY26-FY27 Budget by March 6, 2026.” The Townwill make this part of the Task 1 fee negotiation process with the selected Consultant.____________________________________________________________________________________Clarification to RFP: RFP page 13, SECTION VIII. B, item 10, Page Limitations, first bulleted itemshall read as follows:“Maximum 2 additional pages allowed within the Consultant’s Proposal. The location of these twoadditional pages, whether together or separate, is up the discretion of the Proposer.”Comment: While the Town does not have a total maximum sheet count for the finished Proposal, theTown wants to provide some flexibility for the proposers. Except for these two additional pages beingallowed, please adhere to the maximum sheet count when listed.___________________________________________________________________________________Additional Post Meeting Questions Received:Question No. 8: RFP page 11, SECTION VIII. B, items #1, #2, and #5Please confirm under which section these forms should be included, as they are not mentioned in C.Proposal / Expression of Interest (EOI) Organizational Format.Answer: Replace C. Proposal / Expression of Interest (EOI) Organizational Format, with the following(Items revised or added to this list are in bold text):1. Required Order of Submission• Transmittal Letter• Table of Contents• Addendum Acknowledgement Form (Attachment H)• Understanding of Section V, Scope of Work (max 2 pages – Refer to Question No. 9 answer• General Information Form (Attachment E, Forms)2 of 7• Corporate Registration Form (See Attachment E, Forms)• SF 330 Part I – one combined for project team• SF 330 Part II – one for each firm• Response to RFP EOI Item 7• Affiliates & Subsidiaries• Table/Matrix of information for Item 13• SCC & DPOR registration/licensing documentation (full-size copies)• DPOR registration certificates for Key Personnel (full-size copies)• Firm Data Sheet• Certification Regarding Debarment (See Attachment I)• 3 Most Recent References List____________________________________________________________________________________Question No. 9: RFP page 11, SECTION VIII. B, item 3Please confirm if we need to submit 3 recent references, in addition to the references in Section F, andunder which section that information should be included.Answer: Yes, In addition to the references required as part of Section F, please provide a List of 3 MostRecent References of your choice as listed above in the answer to Question No. 8, the revised “RequiredOrder of Submission”, 1 page total. Each reference listed shall include the project title, clientorganization, contract amount, year completed, and client contact name, title, phone number, andemail.____________________________________________________________________________________Question No. 10: RFP page 12, SECTION VIII. C, item 7Please clarify the content for “Responses to Consultant Short List Score Sheet” that needed to beincluded in the Section H, since there is no section titled “Consultant Short List Score Sheet”.Answer: Please eliminate “Responses to Consultant Short List Score Sheet”. No response required.____________________________________________________________________________________Question No. 11: RFP page 13, SECTION VIII. C, item 8Is this section included in the page count for Section H (per section C. Proposal / Expression of Interest(EOI) Organizational Format)?Answer: No, please include this as a separate response, 1 page maximum, for Affiliates & Subsidiaries,as noted in the revised “Required Order of Submission” listed above in the answer to Question No. 8.Question No.11, cont. : Please clarify the requirement “Resolve doubt in favor of listing as affiliate.”3 of 7Answer: The phrase “Resolve doubt in favor of listing as affiliate”, in accordance with the Town’sinterpretation, means if there is any uncertainty about whether a person, organization, or companyshould be considered an affiliate, the decision should err on the side of including them as an affiliaterather than excluding them.____________________________________________________________________________________Question No. 12: RFP page 13, SECTION VIII. C, item 10Please clarify which section are allowed another additional 2 pages.Answer: “Maximum of 2 additional pages are allowed within the Consultant’s Proposal. The locationof these two additional pages, whether together or separate, is up the discretion of the Proposer.”Question No. 12, cont. : Is there a total page count for the entire EOI?Answer: There is NO total page count for the entire EOI. The only page limitations are as described foreach section as noted.____________________________________________________________________________________Question No. 13: Will the minutes / transcript of the Pre-Proposal Meeting of November 3 beavailable?Answer: The minutes were provided as part of Addendum No. 1.____________________________________________________________________________________Question No. 14: During the Pre-Proposal Meeting, there was mention of a sanitary sewer pumpstation being necessary for the property. Will design of the pump station be a part of the scope of theProject?Answer: The preliminary design through final design of the pump station will be included andnegotiated as part of the Scope of Work.____________________________________________________________________________________Question No. 15: Will Addenda be e-mailed to proposers, or are they to be posted to the website?Answer: Addenda will NOT be emailed to proposers. All Addenda are uploaded to eVA and to theTown of Christiansburg Web site.____________________________________________________________________________________Question No. 16: On page 12 of the RFP, section 7 “Additional Information”, we’re to include“Responses to Consultant Shortlist Score Sheet”. Please clarify what this is.Answer: “Please eliminate “Responses to Consultant Short List Score Sheet”. Also see the answer toQuestion 10 above.4 of 7Question No. 17: In Section VIII, B., the RFP states, "Proposals must include: ...5. Signedacknowledgement(s) of any Addenda." Is there a specific form or format you would like us to use forthis acknowledgement?Answer: An “Addendum Acknowledgement Form – Attachment H” is included with Addendum No. 2.Please note the revised “Required Order of Submission” listed above in the answer to Question No. 8.____________________________________________________________________________________Question No. 18: In Section IX, D., Criteria 1., the RFP states, "Proposal adheres to submittalparameters - ...acknowledgement of Professional Services Agreement...". Is there a specific form orformat you would like us to use for this acknowledgement?Answer: Under Section IX Evaluation and Award of Contract, Item D. Evaluation Criteria, revise ItemNo. 1. Requirements: to read as follows: “Proposal adheres to submittal parameters identified inSection VIII – Proposal Preparation & Submission Requirements.” Disregard the reference to“acknowledgement of Professional Services Agreement”.____________________________________________________________________________________Question No. 19: Section VIII.B.4. states that proposals must include a “Response to Section III,Statement of Need”. Section III does not ask any specific questions of the offeror. Can you pleaseclarify what, specifically, would you like addressed in the requested response? Is this intended to be ademonstration of the understanding of scope?Answer: Replace SECTION VIII – PROPOSAL PREPARATION & SUBMISSION REQUIREMENTS, B. SpecificProposal Requirements, item No. 4. Response to Section III, Statement of Need with the following:Understanding of Section V, Scope of Work. Please note the revised “Required Order of Submission”listed above in the answer to Addendum No. 2, Question No. 8.For clarification, the proposer shall provide a clear explanation of their understanding of the Scope ofWork. This response should describe the proposer’s interpretation of the project objectives, key issues,constraints, and desired outcomes as presented in the RFP.____________________________________________________________________________________Question No. 20: Please indicate where all items included in Section VIII.B.4 (Corporate RegistrationForm, General Information Form, Three (3) Recent References, Response to Section III, andAcknowledgement of Addenda) should be included in the Required Order of Submission (SectionVIII.C.1.).Answer: Please see the revised “Required Order of Submission” in the answer to Question No. 8 and theadditional clarity provided in the answer to Question No. 21.____________________________________________________________________________________5 of 7
- Commodity Codes
-
- NAICS 236220Commercial and Institutional Building Construction
- NAICS 541310Architectural Services
- NAICS 541330Engineering Services
- NAICS 541611Administrative Management and General Management Consulting Services
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
RFP 2026-02 Engineering Servi...
RFP 2026-02 Engineering Services - CHO Airport Status: Open RFP 122993-1 Charlottesville-Albemarle Airport
State Government of Virginia
Bid Due: 7/30/2026
Commissioning Services for Mo...
Commissioning Services for Model Laboratory K-12 School Eastern Kentucky University is seeking proposals
Eastern Kentucky University
Bid Due: 7/14/2026