BLD A Cooling Upgrades
Project Information
- Bid Title
- BLD A Cooling Upgrades
- Issuing Agency
- District of Columbia Courts
- Location
- District of Columbia
- Published Date
- May 20, 2026
- Closing Date
- Jun 9, 2026
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- DCSC-26-RFP-068
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Solicitation # Details Opening Date Closing Date Other Documents DCSC-26-RFP-068
BLD A Cooling Upgrades
May 05, 2026 Jun 09, 2026 - Attachment Preview
-
a0SOLICITATION, OFFER, AND AWARD2. Reference Number3. Solicitation NumberDCSC-26-RFP-068BLDA Cooling System Upgrades4. Type of SolicitationSealed Bid (IFB)Sealed Proposals (RFP)5. Date Issued05/05/2026Page of Pages1 596. Type of MarketOpenSet Aside7. Issued By8. Address Offer to:District of Columbia CourtsDistrict of Columbia CourtsCapital Project Facilities Management DivisionAdministrative Services Division510 4th St. NW, Suite 214Procurement and Contracts BranchWashington, DC. 20001510 4th St. NW, Suite 326Washington, D.C. 20001ATTN: Kenneth L. Evans JrNOTE: In the sealed bid, solicitations “offer” or “Contractor” means “bid or “bidder.”SOLICITATION9. THE DISTRICT OF COLUMBIA COURTS REQUIRES PERFORMANCE OF THE WORKS DESCRIBED IN THESE DOCUMENTS (Title, date)A Prebid will be held Monday, May 11, 2026, promptly @ 10:00 AM in Building B, 510 4th St, Suit #214.06A site walk will be held Monday, May 11, 2026, promptly @ 11:00 AM, immediately following the Prebid.Offerors shall provide the following information no later than Monday, May 11 @10:00 AM, for all participants to (e-mail): Kenneth.Evans@dccsystem.gov, ContractSpecialist to participate in the conference calla) Full name of the attendeeb) Name of the company the attendee is affiliated withc) and email address10. The Contracting Officer shall issue the Notice to Proceed no later than _120 calendar days after contract award. The Contractor shall achieve Final Completion within_300_ days after receiving the Notice to Proceed.11. THE CONTRACTOR MUST FURNISH ANY REQUIRED BID, PERFORMANCE, PAYMENT AND WARRANTY BONDSBid BondYes____ No____ _ __% of the total amount of their proposalPerformance and Payment Bond Yes_X__ No____ 100 __% Within ___5__ Calendar days after receiving the notice to proceedWarrantyYes_X__ No____ 100 __% Within _ _5__ Calendar days after final acceptance12. ADDITIONAL SOLICITATION REQUIREMENTS:a. Sealed offers an original, and __4__ copies to perform the work required are due at the place specified in Item 8 by Tuesday , June 02, 2026, at 3:00 PM (date).b. Proposals shall be submitted in two parts, titled "Technical Proposal" and "Price Proposal."c. A separate electronic copy of the entire proposal should accompany the package.d. Sealed envelopes shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.e. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.CAUTION: See Section L.1.2—Proposal submission date and time, and late submissions, late modification, withdrawal or modification of proposals and lateproposals. All offers are subject to all terms & conditions contained in the solicitation13. For InformationA. NameB. TelephoneC. E-mail AddressContactKenneth L. Evans Jr(Area Code)(Number)(Ext) kenneth.evans@dccsystem.gov(202)879-877614. Table of Contents(X)SectionDescriptionPage (X) SectionDescriptionPage No.No.PART I – THE SCHEDULEPART II – CONTRACT CLAUSESXA Solicitation/Contract Form1XI Contract Clauses28XB Supplies or Services and Price/Cost2PART III – LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTSXC Specifications/Work Statement4XJ List of Attachments42XD Packaging and Marking11PART IV – REPRESENTATIONS AND INSTRUCTIONSXE Inspection and Acceptance12Representations, certification and other43XF Deliveries or Performance14XK statements of ContractorsXG Contract Administration Data16XL Instructions, conditions & notices to49ContractorsXH Special Contract Requirements26XM Evaluation factors for award5815. In conjunction with the above, the undersigned agrees, if this offer is accepted within _____120________ calendar days from the receiptof offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), withinthe time specified herein.15A.Name and Addressof Contractor15B. Telephone(Area Code)(Number)SOLICITATION, OFFER, AND AWARD (Continue d)(Construction, Alteration, or Repair)15D. Name and Title of Person Authorized to Sign Offer/Contract15 C. Check if remittance(Ext) address is different from above –Refer to section G15E. Signature and Corporate SealAll written communications regarding this solicitation should be addressed to the Contracting Officer at the mailing address listed on page 1.DCSC-26-RFP-068SECTION B: CONTRACT TYPE, SUPPLIES OR SERVICES ANDPRICE/COSTB.1 Project PurposeThe District of Columbia Courts (the “Courts”), Procurement and Contracts Branch on behalf ofthe Capital Projects and Facilities Management Division (CPFMD) is seeking a contractor toprovide construction services for the BLDA Cooling System Upgrades project located at the DCSuperior Courts Probate Division, also known as Building A (BLDA), at 515 5th St NW,Washington, DC 20001.B.2 The Court contemplates award of a Single firm fixed contract.B.3 SERVICESThe Contractor shall provide all professional, technical, supervision, labor, materials, andequipment for the construction of the BLDA Cooling System Upgrades.B.4 PRICE SCHEDULE:B.4.1 Base Bid Price / Section Pricing: Refer to SECTION K, Attachment K – Tab K.1The Contractor shall perform all efforts in accordance with the requirements of this contract forthe firm fixed price (“FFP”) below and as further specified in the Contractor’s pricing proposal.This FFP shall include all direct labor, materials, equipment, communication, and other directcosts as well as all indirect costs, subcontractor costs, commissions, and any other profit andexpenses for which the Contractor expects payment. No additional charge shall be made by theContractor to complete the scope outlined in this Request For Proposal (RFP). The Contractorshall also guarantee said offered price and itemized pricing, free from any change, for onehundred and twenty (120) days from the date of the submission of its proposal.In addition to the base scope, the Owner requests proposal information corresponding to analternate allowance outlined below:B.4.2 Temporary Cooling Allowance:Refer to section F1.1 for anticipated period of performance. In the event that temporary coolingof BLDA will be required, the Contractor shall provide a temporary system to ensureuninterrupted cooling for the occupied building with no disturbance to Courts operations. Thisservice may be required as early as when the contract is awarded. The Courts envisions thissolution to be temporary chillers and associated temporary power. BLDA is serviced by 208Vpower and cannot support 480V services, so this should be taken into account when planningtemporary cooling.The Contractor shall:1. Coordinate with the Owner to complete all necessary pre-installation activities2. Facilitate revew and acceptance of all pre-installation documents by the Owner and theDistrict prior to installation of the temporary cooling system3. Provide monthly allowances for cooling system rental (see Attachment K – Tab K.3.)2DCSC-26-RFP-068a. Planning, Coordination, Drawings, set up and removal of Temporary CoolingSystemb. All fuel costs for any proposed temporary solutionc. Monthly rental rates for equipmentIf this temporary cooling allowance is required, the contractor, utilizing their proposed rates, willprovide the total cost of the service necessary to cool the building ahead of contract scope (Seesection B.6) which will be executed through a contract modification.Reference Section C for additional information on base contract scope and considered options/allowance.B.4.3 Unit Cost (Abatement Schedule): Refer to SECTION K, Attachment K – Tab K.2.B.4.4 Alternate Deduct for Bathrooms: Refer to SECTION K, Attachment K – Tab K.4.Provide alternate deducts amounts for the slab cutout, toilet partition replacement, and shaftexpansion on Levels 1, 2, and 3 bathrooms.B.5. ADDITIONAL PRICING INCLUSIONSB.5.1 ALLOTMENT(s) The Offeror shall include allowances for the following:B.5.1 A. Hazardous Material Abatement $100,000.00B.6 CONSTRUCTION SCHEDULEThe Contractor shall submit a complete project schedule which shows all activities required toperform the scope of work to include the sequence in which the Contractor proposes to performall contractual aspects of the work. The schedule shall be completed by the Contractor and willbe considered a part of the Construction Project Bid-Offer. Table 1 lists the ContractualMilestones that shall be incorporated into the project schedule. Refer to section F1.1 for periodof performance.The contractor shall take all means necessary to prep and plan for the removal and replacementof the chilled water system over the Fall/Winter season of 2026/2027 and shall have the newsystem operational to support demand in Spring/Summer 2027 anticipated as March1st. Contractor will coordinate the date of the removal of the existing chilled water system withthe DC Courts anticipated for November 1st, 2026.Contract MilestoneSubstantial CompletionFinal CompletionCalendar Days After NTP2703003SECTION C: SPECIFICATIONS/WORK STATEMENTDCSC-26-RFP-068C.1 SCOPEThe Courts is seeking a qualified contractor to provide construction services as specified inAttachments J.22 and J.23 for the BLDA Cooling System Upgrades.The project scope associated with this task order are upgrades of condenser water and chilledwater systems located in the basement and the penthouse. The scope of work includes installationand construction of the following equipment: Condenser Pump(s), Chilled Water Pump(s), HeatExchanger(s), VFDs, and associated Piping and Controls, as well as demolition and removal ofexisting equipment.C.2 APPLICABLE DOCUMENTSSee sections J and K.C.3 DEFINITIONSThese terms when used in this RFP have the following meanings:C.3.1 THE CONTRACT DOCUMENTSThe Contract Documents consist of the Agreement between Owner and Contractor (hereinafterthe Agreement), Conditions of the Contract (General, Supplementary and other Conditions),Drawings, Specifications, Amendments issued prior to execution of the Contract, otherdocuments listed in the Agreement and Modifications issued after execution of the Contract.C.3.2 MODIFICATIONA Modification is (1) a written amendment to the Contract signed by both parties, (2) a ChangeOrder, (3) a Construction Change Directive or (4) a written order for a minor change in the Workissued by the CO.C.3.3 THE CONTRACTThe Contract and documents referenced herein represents the entire and integrated agreementbetween the parties hereto and supersedes prior negotiations, representations or agreements,either written or oral. The Contract may be amended or modified only by a Modification. TheContract Documents shall not be construed to create a contractual relationship of any kindbetween the Owner and a Subcontractor or between any persons or entities other than the Ownerand Contractor. The CM shall, however, be entitled to performance and enforcement ofobligations under the Contract intended to facilitate performance of the CM's duties.C.3.4 THE WORKThe term "Work" means the construction and services required by the Contract Documents,whether completed or partially completed, and includes all other labor, materials, equipment andservices provided or to be provided by the Contractor to fulfill the Contractor's obligations. TheWork may constitute the whole or a part of the Project.C.3.5 THE PROJECTThe Project is the total construction of which the Work performed under the Contract Documentsmay be the whole or a part and which may include construction by the Owner or by separatecontractors.4DCSC-26-RFP-068C.3.6 THE DRAWINGSThe Drawings are the graphic and pictorial portions of the Contract Documents showing thedesign, location and dimensions of the Work, generally including plans, elevations, sections,details, schedules and diagrams.C.3.7 THE PROJECT MANUALThe Project Manual, or Specifications, are the portion(s) of the Contract Documents consistingof the written requirements for materials, equipment, systems, standards and workmanship forthe Work, and performance of related services.C.3.8 THE DIVISION 01The Division 01 is a volume assembled for the Work which may include the Offeringrequirements, sample forms, Conditions of the Contract and Specifications. The terms“knowledge,” “recognize,” “discover,” their respective derivatives, and similar terms in theContract Documents, as used in reference to the Contractor, shall be interpreted to mean thatwhich the Contractor knows (or should know), recognizes (or should recognize), and discovers(or should discover) in exercising the care, skill, and diligence required by the ContractDocuments. Analogously, the expression “reasonably inferable” and similar terms in theContract Documents shall be interpreted to mean reasonably inferable by a contractor familiarwith the Project and exercising the care, skill, and diligence required of the Contractor by theContract Documents. These are included in the Project Manual.C.3.9 SUBSTANTIAL COMPLETIONSubstantial Completion is the stage in the progress of the work when the work or designatedportion thereof is sufficiently complete in accordance with the Contract Documents so that theCourts can fully, safely, and securely occupy the Project Area. For complete definition refer toAttachment J.20 Section 9.8.C.3.10 FINAL PROJECT COMPLETIONUpon receipt of written notice that the work is ready for final inspection and acceptance andupon receipt of a final Application for Payment, the DC Courts and Construction Manager willpromptly make such inspection and, when the DC Courts and Construction Manager finds thework acceptable under the Contract Documents and the Contract fully performed, the DC Courtswill promptly issue a final Certificate for Payment, stating that to the best of the ConstructionManager's knowledge, information and belief, and on the basis of the Construction Manager'son-site visits and inspections, the work has been completed in accordance with terms andconditions of the Contract Documents and that the entire balance found to be due the Contractorand noted in the final Certificate is due and payable. The DC Courts Final Certificate forPayment will constitute a further representation that conditions listed in Section 9.10.2 asprecedent to the Contractor's being entitled to final payment have been fulfilled. For completedefinition refer to Attachment J.20 Section 9.10.C.3.11 ACCEPTANCE"Acceptance," as used in this clause, means the act of an authorized representative of the DCCourt by which the DC Court assumes for itself, or as an agent of another, approves specificservices, as partial or complete performance of the contract.C.3.12 ALLOWANCES5
- Commodity Codes
-
- NAICS 238220Plumbing, Heating, and Air-Conditioning Contractors
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Follow DCF AHU Coils Active Contract Opportunity Notice ID 2031ZA26Q00108 Related Notice Department/Ind.
Federal Agency
Bid Due: 7/20/2026
Model WW3 Haskris Non-Refrige...
Follow Model WW3 Haskris Non-Refrigerated Water Re-circulating System Active Contract Opportunity Notice ID
DEPT OF DEFENSE
Bid Due: 7/07/2026