60" WASTEWATER REHABILITATION FROM TRINITY RIVER TO ROCHESTER SWPS
Project Information
- Bid Title
- 60" WASTEWATER REHABILITATION FROM TRINITY RIVER TO ROCHESTER SWPS
- Issuing Agency
- City of Dallas
- Location
- Texas
- Published Date
- May 7, 2026
- Closing Date
- Jun 5, 2026
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- CIZ-DWU-26 040
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Project: 60" WASTEWATER REHABILITATION FROM TRINITY RIVER TO ROCHESTER SWPSRef. #: CIZ-DWU-26 040Type: CSPStatus:OpenOpen Date: May 7th 2026, 9:00 AM CDTQuestions Due Date: May 28th 2026, 4:00 PM CDTContact Information: Patricia Davis, patricia.davis@dallas.govClose Date: Jun 5th 2026, 1:00 PM CDT
Project Description: The project involves the trenchless rehabilitation of a total of approximately 5,150 linear feet (LF) of a circa 1950’s 60” RCP gravity wastewater pipe, the replacement of existing manhole structures, reconstruction of existing manhole structures and the rehabilitation of existing manhole structures. All existing manhole structures are steel reinforced concrete.
The project involves rehabilitation of approximately 4,790 LF by Machine Spiral Wound Liner (MSWL) and approximately 360 LF of CIPP followed by HDPE slip lining for the portion of the pipeline crossing the Trinity River. A section of the pipeline crossing the Trinity River is exposed to river flow. Flow control to complete the rehabilitation will include the coordinated diversion of flow using the upstream DWU Sunbeam Diversion Structure. Pipeline rehabilitation work is to proceed in accordance with the Flow Control Provisions found in the Contract Drawings.
The pipeline rehabilitation extents are from the west side of the East Branch of the Trinity River east to near the existing Rochester Stormwater Pump Station (SWPS) located near William Blair Jr. Park in South Dallas. A portion of the pipeline parallels and crosses an Oncor High Voltage Transmission Tower ROW and crosses both an active UPRR ROW and TXDOT ROW.
The entire pipeline alignment is in the FEMA Regulatory Floodway and the area will be subject to flooding. Additionally, portions of the existing pipeline and/or project area are in United States Army Corps of Engineers (USACE) Lamar Levee Extension Project Area and portions parallel the Rochester Levee both of which are subject to USACE jurisdiction. Project Manager: Joe Felipe, P.E.
Final Specifications, Drawings, Bid Proposal Spreadsheet, and any procurement documents will be uploaded to Bonfire no later than Friday, May 8, 2026.
- Commodity Codes
-
- NAICS 237990Other Heavy and Civil Engineering Construction
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
CONTRACT sTATUS Number Description Opening Date Opening Time Tab Sheet Open to Receive
City of Carrollton
Bid Due:
CITY OF CORSICANA, TEXAS REQU...
Bid Title: CITY OF CORSICANA, TEXAS REQUEST FOR PROPOSALS CUTTING, BALING AND REMOVAL
City of Corsicana
Bid Due: 7/21/2026