Windham Center Water Storage Tank Demolition
Project Information
- Bid Title
- Windham Center Water Storage Tank Demolition
- Issuing Agency
- Portland Water District
- Location
- Maine
- Published Date
- Mar 6, 2026
- Closing Date
- Mar 19, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Basic InfoDescriptionWindham Center Water Storage Tank Demolition
The project consists of demolition of a 200,000 Gallon multicolumn water storage tank located at 10 School Road, Windham, ME.
Project documents may be obtained by contacting the District’s Purchasing Agent, Wesley Gilbert. His email is wgilbert@pwd.org.
Attachments Download All Attachments - Attachment Preview
-
WINDHAM CENTER ELEVATED WATERSTROAGE TANK DEMOLITIONADDENDUM NO. 1TOCONTRACT DOCUMENTSFOR100% CONTRACT REQUIREMENTS AND SPECIFICATIONSVOLUME 1 OF 1DATE: MARCH 2026Prepared By:PORTLAND WATER DISTRICT225 Douglass StreetPortland, ME 04104Reviewed and Approved by:Hazen and Sawyer225 Douglass Street, PO Box 3553, Portland, Maine 04104 | 207.774.5961 | www.pwd.orgGENERAL This Addendum shall be considered part of the bid documents for the Chute Road Water Mainproject. Bidders must acknowledge receipt of this Addendum on C-410 – Bid Form for ConstructionContract, 5.03 Receipt of Addenda. Except as described below, the original bid document remains unchanged.SPECIFICATION UPDATES1. C-111 – Advertisement for Bids. Bid opening date has been changed to 1pm (EST) March 19, 2026,Customer Service entrance, 225 Douglass St, Portland, Maine.2. C-410 – Bid Form – 4.02 Work to be substantially complete within 180 days and completed andready for final payment in 210 days.DRAWINGS1. There are no updates to the drawings at this time.GENERAL QUESTIONS1. Bid advertisement states this is “contract 2”, it also refers to construction of a new tank. What iscontract 1? New tank? Yes, a new tank was constructed last year.a. Is there a new tank under construction / will there be a new tank located near this site?It is completed, roughly 2 miles from the tank to be demoed.b. If yes, what size, height and style is the new tank and what is the proximity to the oldtank? Concrete2. Bid adv states contractor is responsible for handling all drainage and water removal. 01 11 00-2,1.02.B#5 states the same thing. Plan sheet D2 #1 under construction notes states the OWNER willflush the water and the CONTRACTOR will flush any remaining volume prior to demo.The tank is drained. Some remaining water may be in the disconnected water main from the baseelbow to the drain valve in the base of the building.a. Who is responsible for draining the tank? Tank is effectively drained in its presentcondition.b. When you state the contractor will flush the remaining water, what are you expecting? 5gallons? 25,000 gallons? We would expect less than 50 gallons3. A majority of the spec refers to the abatement of lead and asbestos.a. Is there a lead paint analysis available? Nob. If not, please do and provide to all plan holders. The intent is to have the contractor abatethe lead if there is lead present.c. OSHA Reg. 29CFR 1926.62 does not require paint removal prior to torch cutting. Are yourequiring paint abatement? We do not agree or disagree with means and methods here,specifications (01 35 23) outline safety articles to adhere to.1. If yes, a complete paint abatement? Out side of tank and inside? Or just on the cutlines? Tank to be demolished completely, if abated materials can be disposed ofthen a full abatement would not be required.--Remember, the Addendum must be acknowledged with the submitted bid—4. Is there an asbestos report on or anywhere dealing with this tank? if so, where in thebuilding? In the piping? Provide proofi. If a report is not available, please have one done and provide.Portland Water District will complete an asbestos assessment in the building andprovide the results to the plan holders in a subsequent addendum.--Remember, the Addendum must be acknowledged with the submitted bid—
- Commodity Codes
-
- NAICS 237110Water and Sewer Line and Related Structures Construction
- NAICS 238910Site Preparation Contractors
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Sources Sought: Monopole Towe...
Follow Sources Sought: Monopole Tower Procurement and Base Foundation Construction (577 SWES/DIFF) Active
DEPT OF DEFENSE
Bid Due: 7/08/2026