Construction: Multi Site HVAC Upgrades Phase 2
Project Information
- Bid Title
- Construction: Multi Site HVAC Upgrades Phase 2
- Issuing Agency
- Eugene School District 4J
- Location
- Oregon
- Published Date
- Apr 13, 2026
- Closing Date
- May 5, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
- Construction: Multi Site HVAC Upgrades Phase 2
PROJECT NAME:
Multi Site HVAC Upgrades Phase IIBid Due Date:
May 5 th 2026 at 2:00pm
Mandatory Pre-Bid Date:
April 21 st 2026 at 10:00am Location: Eugene School District 4J’s Facilities building: 715 West 4 th Ave Eugene OR 97402Addenda:
Document Uploads:
Multi Site HVAC Upgrades Phase II Project Manual
Monroe Middle School Project Drawings
McCornack Elementary School Project Drawings
Kennedy Middle School Project Drawings
Kelly Middle School Project Drawings
Edgewood Elementary School Project Drawings
Est. Const. Cost:
$5.3 MillionStatus:
Questions
ActiveFor questions regarding this project, please contact the Project Manager:
- Name: Kirk Gebb
- Email: Gebb@4j.lane.edu
Hard copies are not provided by the School District. It is the responsibility of all Prime Bidders, Sub-bidders, and Suppliers to obtain Bidding Documents and all Addenda from the hyperlink. It is important that all bidders correctly indicate all addenda on the bid form.
- Construction: Multi Site HVAC Upgrades Phase 2
- Attachment Preview
-
APRIL 8, 2026Bid SetProject ManualEugene School District, 4jMulti-Site HVAC Phase 2250036.01>BEND550 NW Franklin Ave,Suite 448Bend, OR 97703SPRINGFIELD725 A StSpringfield, OR 97477WEST LINN1750 Blankenship Rd,Suite 250West Linn, OR 97068PROJECT MANUALEUGENE SCHOOL DISTRICT, 4jMulti-Site HVAC Phase 2Eugene, OregonC.I.P. Project No. 462-900-P0125Bid SetApril 8, 2026Owner:Eugene School District715 West 4th AvenueEugene, Oregon 97402Contact: Kirk GebbPhone: (541) 968-0950Project Managergebb@4j.lane.eduMechanical & Electrical Engineer:Systems West Engineers, Inc.725 A StreetSpringfield, Oregon 97477Contact: Paul Fooks, PESenior Mechanical EngineerPhone: (458) 210-2475pfooks@systemswestengineers.comArchitectRowell Brokaw1203 Willamette Street, Suite 210Eugene, OR 97401Contact: Chris Andrejko, AIAPrincipalPhone (541) 513-7830chris@rowellbrokaw.comStructural Engineer:Hohbach-Lewin, Inc.199 East Fifth Ave. Suite 23Eugene, OR 97401Contact: Brent Crawford, S.E.Senior AssociatePhone (541) 349-1701bcrawford@hohbach-lewin.comTERNEDGIPNROEFEESSI# 59,544OREGONULJAN.E11,.2005FOOEXP IRES : 12 - 3 1- 27250036.01TABLE OF CONTENTSSPECIFICATIONSNote project manual is utilized for multiple facilities. Not all sections in Divisions 3through 26 will apply to each facility in project.Division 00 – Procurement and Contracting Requirements001113002113002113002213003113004113004522005213005213007213007213007343Invitation to Bid – Electronic Submission VersionInstructions to BiddersInstructions to Bidders B, AIA Document A310Supplemental Instructions to BiddersNotice SummaryBid FormFirst Tier Subcontractor DisclosureForm of AgreementForm Agreement B A101-2017General ConditionsGeneral Conditions B, AIA Document A201Prevailing Wage RatesDivision 01 - General Requirements011100012500012900013000013200013300014000015000016000016116017000017300017419017700017823017839019113Summary of Work Phase 2Contract Modification ProceduresPayment ProceduresAdministrative RequirementsConstruction Progress DocumentationSubmittal ProceduresQuality RequirementsTemporary Facilities and ControlProduct RequirementsVolatile Organic Compound (Voc) Content RestrictionsExecution and Closeout RequirementsExecution RequirementsConstruction Waste Management and DisposalCloseout ProceduresOperation and Maintenance DataProject Record DocumentsGeneral Commissioning RequirementsSWE#250036.01000110 - 1Table of ContentsTABLE OF CONTENTSDivision 02 – Existing Conditions024110Selective DemolitionDivision 03 - Concrete033000Cast-in-Place ConcreteDivision 05 – Metals055000055133Metal Fabrications (Rev 4-8-2026, Bid Set)Metal LaddersDivision 06 – Wood, Plastics, and Composites061000Rough CarpentryDivision 07 – Roofing, Waterproofing, and Insulation075600076200077200079200Fluid-Applied Membrane RoofingSheet Metal Flashing and TrimRoof AccessoriesJoint Sealants (Rev 4-8-2026, Bid Set)Division 09 – Finishes095100099113099123Acoustical CeilingsExterior Painting (Rev 4-8-2026, Bid Set)Interior PaintingDivision 23 - Heating, Ventilating, and Air Conditioning (HVAC)230500230513230514230517230523230529230548230553General HVAC ProvisionsCommon Motor Requirements for HVAC EquipmentCommon Motor Control Requirements for HVAC EquipmentSleeves, Sleeve Seals, and Escutcheons for HVAC PipingValves For HVAC Piping (Rev 4-8-2026, Bid Set)Hangers and Supports for HVAC Piping and EquipmentVibration and Seismic Controls for HVAC (Rev 4-8-2026, Bid Set)Identification for HVAC Piping and EquipmentSWE#250036.01000110 - 2Table of ContentsTABLE OF CONTENTS230593230713230719230800230922230929232133232116232123232300233113233300233713233723234100237223237420237605238143238216Testing, Adjusting, and Balancing for HVACDuct InsulationHVAC Piping Insulation (Rev 4-8-2026, Bid Set)Commissioning of HVACGeneral Automatic Controls For HVACBAS Sequence of Operations for HVAC (Rev 4-8-2026, Bid Set)Above Ground Hydronic PipingHydronic Piping SpecialtiesHydronic PumpsRefrigerant Piping and SpecialtiesMetal DuctworkAir Duct Accessories (Rev 4-8-2026, Bid Set)Air Outlets and Inlets (Rev 4-8-2026, Bid Set)HVAC Gravity VentilatorsParticulate Air FiltrationPackaged Air-to-Air Energy-Recovery UnitsPackaged Outdoor Heating and Cooling UnitAir Cooled Condensing UnitAir-Source Unitary Heat Pumps (Rev 4-8-2026, Bid Set)Air CoilsDivision 26 - Electrical260500260501260519260529260533260548260553260572262213262413262416262726262816General Electrical ProvisionsElectrical DemolitionLow-Voltage Electrical Power Conductors and CablesHangers and Supports for Electrical SystemsRaceways and Boxes For Electrical SystemsSeismic Controls For Electrical SystemsIdentification for Electrical SystemsOvercurrent Protective Device Short-Circuit and Arc Flash StudyLow-Voltage Distribution TransformersSwitchboardsPanelboardsWiring DevicesEnclosed Switches and Circuit BreakersSWE#250036.01000110 - 3Table of Contents
- Commodity Codes
-
- NAICS 236220Commercial and Institutional Building Construction
- NAICS 238220Plumbing, Heating, and Air-Conditioning Contractors
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
NE 1 st, 2 nd, Fogarty, and G...
Bid Solicitation # S-KN0010-00017300 Bid Solicitation # S-KN0010-00017300 Organization Name City of Newport
State Government of Oregon
Bid Due: 7/09/2026
RESERVE CONTRACT FOR CONSTRUC...
Description Oregon State University ("OSU" and/or "Owner") is seeking Offers ("Offers") from qualified
Oregon State University
Bid Due: 8/30/2030