2025 ADA Sidewalks Improvement Project
Project Information
- Bid Title
- 2025 ADA Sidewalks Improvement Project
- Issuing Agency
- City of Pensacola
- Location
- Florida
- Published Date
- Jun 3, 2025
- Closing Date
- Jun 13, 2025
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- 68899021
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Title: Ends: 13-Jun-2025 2:30:00 PM CDT Listing Information/AdvertisementScope of Work
The goal of this project is the installation of new sidewalk and replacement of dilapidated sidewalks identified as needing repairs. These sidewalks serve neighborhoods with poor walkability.
The 2025 Sidewalk project also includes the improvement of several driveway sections that intersect the sidewalks within the ROW. Those improvements shall be constructed to the provided standard driveway detail. The standard sidewalk is 4” thick but shall be 6” thick where the sidewalk crosses a driveway apron. On streets lined with concrete curbs, a curb cut will be required for the driveway improvements. On streets without curbs, the specified driveway dimensions still apply, but driveways do not require “tie-ins” or construction of new curb. This project also calls for the placement of thermoplastic pavement striping for crosswalks and for the installation of detectable warning plates for pedestrians. Thermoplastic shall be placed beginning at the edge of asphalt.
Note that “Q” Street plan set shall be considered a Bid Alternate in its entirety. All work called for in the plans shall be tracked separately from the Scott and Anderson plans.
Utility coordination is the responsibility of the contractor. Surveys indicate the presence of buried utilities in the project areas.
All the project areas are relatively flat, but erosion and sedimentation control measures should be taken where needed to prevent soil runoff away from the project areas. Additionally, work will be performed near vehicular traffic. Maintenance of Traffic (MOT) plans are required and shall be furnished by the contractor.
This project has a 90 calendar-day completion goal following Notice to Proceed.
DOWNLOAD BID DOCUMENTSBID SUBMITTAL INFORMATIONCreator Username: PensacolaPurchasing Bidding Privacy: Bid encryption Started: 09-May-2025 12:00:00 PM CDT Ends: 13-Jun-2025 2:30:00 PM CDT ( 9d, 18h+ ) History: 205 Views Event Status: Event open for bids Actions: Sign-In to Bid Visitors: Visitors/Central Bidding Plan Holders - Commodity Codes
-
- NAICS 236220Commercial and Institutional Building Construction
- NAICS 237310Highway, Street, and Bridge Construction
- NAICS 238990All Other Specialty Trade Contractors
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
CONSTRUCT RANGE ROAD 218 BY-P...
Follow CONSTRUCT RANGE ROAD 218 BY-PASS AT D-51, EGLIN AIR FORCE BASE, FLORIDA
Federal Agency
Bid Due: 7/31/2026
Ortman Drive and West Jackson...
Project ID: Y26-756 Title: Ortman Drive and West Jackson Street Sidewalk Improvements Addenda:
Orange County
Bid Due: 7/30/2026