Anderson County Bridge Replacement - Anderson County, KS
Project Information
- Bid Title
- Anderson County Bridge Replacement - Anderson County, KS
- Issuing Agency
- Drexel Technologies
- Location
- Missouri
- Published Date
- May 27, 2026
- Closing Date
- May 29, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Anderson County Bridge Replacement - Anderson County, KS
Project No. 2 C-5327-01StatusAccepting Bids
Bid Date 5/29/26 9:00am LocationAnderson County, KS
Date Issued: 5/12/2026
ANDERSON COUNTY BRIDGE REPLACEMENT PROJECT NO. 2 C-5327-01Sealed proposals submitted in an envelope plainly marked “Project No. 2 C-5327-01 Proposal” will be received at the office of the County Shop, 823 W. 7th Ave., Garnett, Kansas, until 12:00 p.m. on Friday, May 29th, 2026. At 9:00 a.m. on June 1st, 2026, the proposals will be publicly opened and read aloud in the County Commissioners Office:
PROJECT NO. 2 C-5327-01 PROPOSAL
The Project consists of the replacement of Anderson County Bridge Number P.8-21.2, located 0.2 Miles North of Nevada-2100 Intersection, KS on Nevada Road. The proposed bridge is a 50’ WBMS Bridge with 24’-0” Roadway.
The bid quantities for the project consist of the following total approximate quantities of work:
Class I Excavation…………………………………………. 84 Cu. Yds.
Concrete (Grade 4)(AE)(SW)...…………………………… 30.9 Cu. Yds.
Reinforcing Steel (Grade 60)……………………………… 8,160 Lbs.
Structural Steel (M270)(Gr 50WT3)………………………. 37,800 Lbs.
Structural Steel (A709)(Gr 50W)………………………….. 9,500 Lbs.
Structural Steel (A709)(Gr 36)………………………….…. 2,790 Lbs.
Bridge Handrail (Metal)(Double Nested)…………………. 98 Lin. Ft.
Piles (Corrugated Metal Sheet)……………………………. 1,446 Sq. Ft.
Piles (Steel)(HP10x42)…………………………………….. 344 Lin. Ft.
Test Piles (Special)(HP10x42)……………………….……. 63 Lin. Ft.
Contractor Furnished PDA………………………………… 2 Each
Slope Protection (Riprap Stone)(200 lb)…………………… 85 Cu. Yds.
Contractor Construction Staking…………………………... Lump Sum
Mobilization……………………………………………….. Lump Sum
Removal of Existing Structures……………………………. Lump Sum
Curing Environmental……………………………………... Lump Sum
Clearing & Grubbing………………………………………. Lump Sum
Common Excavaion (Rural Small)…..……………………. 515 Cu. Yds.
Compaction of Earthwork (Type B)(MR-90)……………... 24 Cu. Yds.
Water (Grading)(Set Price)………………………………... 1 M Gal
Signing Object Marker (Type 3)…………………………... 4 Each
Temporary Surfacing Material (Aggregate)(Set Price)……. 1 Cu. Yd.
Traffic Control……………………………………………... Lump Sum
Seeding……………………………………………………... Lump Sum
Water Pollution Control……………………………………. Lump Sum
Surfacing Material (AB-3)…………………………………. 95 Tons
All equipment, materials and workmanship must be in accordance with the Standard Specifications for State Road and Bridge Construction of the Kansas Department of Transportation, 2015 Edition, with all Supplemental Specifications and the Special Provisions that include applicable local construction standards and procedures as provided with the contract documents.
Copies of the contract documents will be on file at the Anderson County Shop, 823 W. 7th Ave., Garnett, Kansas and in the office of Schwab Eaton, 5410 Ledge Stone Drive, Manhattan, Kansas 66503. Three additional sets of documents (except Standard Specs., 2015 Ed.) will be furnished to the successful bidder.
Interested Bidders may secure a set of drawings, specifications and all other Contract Documents through the online Plan Room administered by Drexel Technologies. Please visit www.drexeltech.com and click on the Plan Room tab to get registered. Questions regarding purchasing the Contract Documents, getting registered, or using the Plan Room can be answered at www.drexeltech.com or by calling Drexel Technologies toll free at (888) 202-1301.
All bidders must be prequalified with the Kansas Department of Transportation for the type and amount of work covered under this contract.
A bid deposit in the form of certified check on a solvent Kansas bank or a satisfactory bid bond in an amount equal to five percent of the total bid price must accompany the bid.
Bidders shall direct all questions concerning the plans and contract documents to Schwab Eaton.
Bidders will be required to furnish their proposed start date in the Proposal to begin construction.
The Notice to Proceed will be issued with an early start date of August 10, 2026, and a late start date of February 15, 2027. There is a total of 120 calendar working days for the project.
No bidder may withdraw his bid for a period of 30 days after the date of the opening of bids.
The bidder to whom a contract is awarded will be required to furnish performance and statutory bonds acceptable to Anderson County, each in the amount of the total contract price in conformity with the requirements of the contract documents.
The right is reserved by the County to reject any or all bids and to waive any informality therein, to determine which is the lowest responsible bid most suitable to the County and to approve the bonds.
BOARD OF COUNTY COMMISSIONERS
ANDERSON COUNTY, KANSAS
- Commodity Codes
-
- NAICS 237310Highway, Street, and Bridge Construction
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Q510--Intraoperative Neuromon...
Follow Q510--Intraoperative Neuromonitoring Services Contract (IONM) Active Contract Opportunity Notice ID 36C25525Q0562 Related
VETERANS AFFAIRS, DEPARTMENT OF
Bid Due: 7/30/2026
Q999--KC Wheelchair/COT Speci...
Follow Q999--KC Wheelchair/COT Special Mode Transportation (SMT)Mission Critical (VA-25-00102304) Active Contract Opportunity Notice
Federal Agency
Bid Due: 7/06/2026