RFQ FOR TOWN OF APEX JENKS SUBSTATION DESIGN
Project Information
- Bid Title
- RFQ FOR TOWN OF APEX JENKS SUBSTATION DESIGN
- Issuing Agency
- Town of Apex
- Location
- North Carolina
- Published Date
- May 8, 2026
- Closing Date
- Jun 11, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Bid Title: RFQ FOR TOWN OF APEX JENKS SUBSTATION DESIGN
Category: Utilities Engineering Status: Open Description: The Town of Apex Electric Department is conducting a qualification-based selection process for engineering services for a new substation. Interested engineering firms are invited to submit a Statement of Qualifications (SOQ) package for consideration no later than 12:00 PM on June 11 th , 2026.
The proposed substation will consist of a 230kV-24kV, 40 MVA transformer supplying three feeders from a 2,000A bus system with provisions for another three feeders and transformer in the future.
Publication Date/Time: 5/7/2026 1:45 PM Closing Date/Time: 6/11/2026 12:00 PM Contact Person: Brad Holland brad.holland@apexnc.org Miscellaneous: All questions related to the RFQ shall be via email to brad.holland@apexnc.org from the identified contact person. The deadline for questions is 4:00 PM on May 28th, 2026. Related Documents: - Attachment Preview
-
ELECTRIC UTILITIES DEPARTMENTRequest for QualificationsJenks Substation DesignMay 7th, 2026IntroductionThe Town of Apex Electric Department is conducting a qualification-based selection process forengineering services for a new substation. Interested engineering firms are invited to submit aStatement of Qualifications (SOQ) package for consideration no later than 12:00 PM on June 11th,2026.Project DescriptionThe Town of Apex has a need to increase the capacity of its power system on western side of theservice territory near US Highway 64 to accommodate planned growth in the area with a new230kV substation. The proposed substation will consist of a 230kV-24kV, 40 MVA transformersupplying three feeders from a 2,000A bus system with provisions for another three feeders andtransformer in the future. Refer to the preliminary single line. Land for the new substation has beenprocured and the transformer has been ordered and is scheduled for delivery in the first quarter of2028.This project is to provide the design and engineering calculations as well as the constructiondocuments, bid packages, and substation drawings required to construct and commission thesubstation. This includes all required protection, controls, and metering systems as well as designand procurement of a prefabricated control house and 48V DC battery control systems and240/120V station power. The bus support structure shall be a lattice style support structure withthe bus work arranged to match other town substation configurations. Exit feeders are to be fed by600A reclosers (GW Vipers or Eaton Nova TS) through 576 KVA regulators (GE VR 1 orEaton/Cooper Quickstep). The project may include the design or layout for all or portions of the exitfeeders’ (circuit) routes. This includes load-based layout of the distribution transformers, highwaycrossing, and development of tie points and loop schemes for the circuit and between circuits.Scope of WorkThe following scope of work is currently envisioned for this project. The intent is to award theentire scope to one qualified firm or team of firms; however, the town reserves the right to contractseparately for any portion of the project. This may include issuing a subsequent RFQ for certaintasks or assignments of tasks to the town’s on-call engineering firms.Design Phase•Conduct necessary surveys of the substation site and exit feeder routes.•Grading determinations, plats, easement maps, etc.•Construction plans and technical specifications preparationTOWN OF APEXThe Peak of Good LivingPO Box 250 Apex, NC 27502 | (919) 249-3400 | www.apexnc.orgELECTRIC UTILITIES DEPARTMENT•Bidding and contract documents preparation utilizing the town’s standard documents•Final construction cost estimates•Any required environmental permits and regulatory approvals•Provide input to power wholesaler for point of delivery and transmissions studies if requiredBidding Assistance Phase•Advertise or assist in the advertising of the project for bids•Receive inquiries and issue clarifications and addenda as required•Conduct a pre-bid conference•Receive bids and conduct public bid opening (if required)•Provide a certified bid tabulation and make a recommendation of award•Attend factory acceptance tests as neededConstruction Administration & Observation Phase•Coordination and execution of the contract documents•Review of submittals and maintain logs•Negotiate and prepare change orders•Review/verify quantities and recommend approval of partial pay requests•Maintain red-lines, as-built drawings•Provide part-time observation during site preparation phase of construction•Provide part-time observation once structure and equipment installation begin•Oversee/witness relay testing and validation•Maintain weekly observation logs•Conduct monthly construction progress meetings•Conduct project closeout and submit all as-builts plans, and certificationsSOQ RequirementsThe SOQ should follow the format outlined in this section. Submittals shall not exceed 10 pagesincluding the cover letter. Page count does not include cover page or dividing tabs if used. All pagesshall be 8.5” x 11”.1. Cover Letter: A clear and concise introduction, which shall identify the firm’s primarycontact person for the SOQ, acknowledge receipt of any amendments to the RFQ, and summarizewhy the town should select your firm for this project.2. Firm Profile: Provide the following information:a. Brief history of the firm,b. Location and contact information for the firm’s corporate headquarters,c. Location(s) and contact information for any branch office(s) that may be utilized for thisproject,d. Number of employees (overall and for each identified branch office),TOWN OF APEXThe Peak of Good LivingPO Box 250 Apex, NC 27502 | (919) 249-3400 | www.apexnc.orgELECTRIC UTILITIES DEPARTMENTe.Type of ownership and parent company, if applicable, and any pending ownership changes,f.Identify any claim or litigation involving the firm within the last five years, or provide astatement that none exist3. Project Understanding and Approach: A detailed narrative that demonstrates anunderstanding of the town’s needs and describes how those needs will be met. Identify servicesthat are typically provided in-house by the firm’s local or North Carolina offices, services that areavailable from the firm’s out-of-state offices, and services for which a sub- consultant would beutilized.4. Qualifications and Experience: At least four relevant projects completed by the firm. Includethe following information for each listed project:a.Project description,b. Project start and completion dates (if ongoing, provide the current status and projectedcompletion date),c.Engineer’s estimated cost, bid cost, and final cost (an explanation to significant differencesin cost may be provided),d. Scope of services provided by the consultant,e. Sub-consultants utilized (if any),f.Summary of the similarities to this project, andg. Name, title, email address, and phone number of Owner reference.5. Project Team: Identify all personnel, including sub-consultants that will be directly involvedin the project. Provide a brief resume for each team member which includes office location, generalqualifications (education, professional registrations, certifications, etc.), years of experience (withcurrent firm and other firms), role for this project, and role for any projects listed in theQualifications and Experience section of the SOQ.6. Project Management and QA/QC: Briefly describe the firm’s procedures and processes forproject management and quality assurance and quality control throughout all phases of a project.Evaluation Criteria & Selection ProcessSOQs will be evaluated based on the following criteria:1. Firm experience and reputation2. Project approach and understanding3. Qualifications and experience of the personnel assigned to this project4. Office location of project team membersTOWN OF APEXThe Peak of Good LivingPO Box 250 Apex, NC 27502 | (919) 249-3400 | www.apexnc.orgELECTRIC UTILITIES DEPARTMENTSOQs will be evaluated by a selection committee comprised of town staff. Following initialevaluation of the SOQs, the committee may conduct interviews with top candidates.Submittal ProcedureAs soon as possible, please email brad.holland@apexnc.org to indicate your firm’s interest in theproject and intent to submit a SOQ. Include the firm’s name and the name and email address of themain contact person for the SOQ.All questions related to the RFQ shall be via email to brad.holland@apexnc.org from the identifiedcontact person. The deadline for questions is 4:00 PM on May 28th, 2026.Submit the SOQ in pdf format via email to brad.holland@apexnc.org no later than 12:00 PM on June11th, 2026. No hardcopy submittal of the SOQ is required. Please note that any additionalinformation or amendments to this RFQ will be posted to the town’s website. It is the responsibilityof the consultant to monitor the site accordingly.The consultant shall bare full responsibility for all costs incurred in the development and submittalof the SOQ, including costs associated with interviews. All submissions shall become the exclusiveproperty of the town of Apex and may be disclosed to third parties.TOWN OF APEXThe Peak of Good LivingPO Box 250 Apex, NC 27502 | (919) 249-3400 | www.apexnc.org
- Commodity Codes
-
- NAICS 237130Power and Communication Line and Related Structures Construction
- NAICS 541330Engineering Services
- NAICS 541511Custom Computer Programming Services
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Request for Qualifications - ...
Request for Qualifications - Church Street Park Field Improvements Closing date July 09,
Town of Morrisville
Bid Due: 7/09/2026
RFQ #26-065 Architectural & E...
RFQ #26-065 Architectural & Engineering Services RFQ #26-065 Architectural & Engineering Services -
Wake County
Bid Due: 7/21/2026