Addendum 2 - Jonathan Law High School Career Technology Education Additions and Alterations

Project Information

Bid Title
Addendum 2 - Jonathan Law High School Career Technology Education Additions and Alterations
Issuing Agency
City of Milford
Location
Connecticut
Published Date
Jun 10, 2026
Closing Date
Jun 29, 2026
Government Level
State & Local
Status
Closed
Ref. #
1848
Original Source
Join to Access Full Details
Attachment Preview
ADDENDUM #2
CAREER TECHNOLOGY EDUCATION ADDITIONS & ALTERATIONS
JONATHAN LAW HIGH SCHOOL
20 LANSDALE AVENUE
MILFORD, CT 06460
STATE PROJECT #084-0217 EA
S/P+A PROJECT #24.161
DATE: June 9, 2026
The following changes to the Drawings and Project Specifications shall become a part of the Drawings
and Project Specifications; superseding previously issued Drawings and Project Specifications to the
extent modified by Addendum #2.
General Information:
The deadline for RFIs is Thursday, June 18, 2026.
See attached RFI log. Questions unanswered will be responded to in a future addendum. (2)
Changes to the Specifications:
SUPPLEMENTARY INSTRUCTIONS TO BIDDERS, Page 1, Article 1.2.A., revise
“fbialka@ci.milford.ct.us” to read “fbialka@milfordct.gov”. (Per Owner)
Changes to the Drawings:
The following ARCHTIECTURAL drawings have been deleted in their entirety. New drawings have
been added and are attached as part of this addendum*:
o A211B
o A211C
1ST FLOOR FINISH PLAN – PART ‘B’ (Per RFI #009)
1ST FLOOR FINISH PLAN – PART ‘C’ (Per RFI #009)
The bid date remains June 29, 2026 at 3:00pm by this addendum.
The addendum consists of three (3) pages of 8½” x 11” text and two (2) 30” x 42” drawings*.
End of Addendum #2
Jonathan Law High School Career Technology Education Additions & Alterations – Milford
State Project #084-0217 EA
Addendum #2-1
SILVER PETRUCELLI + ASSOCIATES
3190 Whitney Avenue | Hamden CT 06518
311 State Street | New London CT 06320
BID RFI LOG
Project: Jonathan Law HS CTE Additions & Alterations
State Project #: 084-0217 EA
S/P+A Project #: 24.161
6/11/2026
RFI Deadline: 06/18/2026
06/18/26, 3:00p
Bids Due: 06/29/26, 3:00p
RFI #
001
002
003
004
005
006
007
008
009
010
011
012
013
014
015
016
017
018
019
020
QUESTION
DATE
RESPONSE
RECEIVED
Bidder is to provide the # of days to substantially
Could you please provide the substantial completion date? I
know the abatement must be completed by August this year.
06/02/26
complete the entire project in their Bid Form. A
preliminary schedule for both the entire project &
abatement portion is also required with the Bid.
What is the expected substantial completion date for this
project?
06/05/26 Refer to RFI #001.
Will the City waive the permit fees?
06/05/26 Refer to SIB, 9.3.
Are there ballistic steel doors on the project? The only ballistic
door wihtout a blast rating on the prints is door 31B.3 and it is
shown as wood.
06/05/26
No, ballistic doors are wood. Refer to Addendum #1 for
additional information.
Many of my subcontractors are saying the bid date is too
soon. Can it be extended?
Bid due date to be extended however substantial
06/05/26 completion date for abatement does change. Refer to
Addendum #1.
PE is a polyethylene core that is not fire rated. Should we
carry this?
06/05/26 Yes, per Section 074213.23.
1/4" (6mm) thick panels aren't available; only 3mm and 4mm
are available for PE and only 4mm for FR (fire-rated). Which
one should we choose for this scope?
06/05/26
4mm. Refer to Addendum #1 for Section 074213.23
revisions.
Is the GC repsonsible for purchasing all of the equipment
listed on the drawings?
06/05/26
Yes, unless otherwise indicated on the equipment
schedules.
The specifications manual contains section 096523 - metal
base. And yet I could not this item on the finish schedule.
Indicate the locations and extent of application of this item.
06/08/26
Metal base is in Vestibule 31E. Refer to Addendum #2
for revised Drawings A211B & A211C.
Confirm who will be paying for third party testing, we note that
IBC 2021 Section 1704.2 requires special inspections to be
performed by an approved agency retained by the Owner or
Owner's agent, "other than contractor", in accordance with the
independence requirements of IBC 2021 Section 1703.1.1.
Given that these services typically are to be performed by the
Owner's retained agency, and that the scope and frequency of
required testing are not fully defined, please confirm whether
the Owner will retain and pay for these services directly, or if
the Contractor is to carry an allowance or other defined value
for inclusion in the proposal.
06/09/26
Unless otherwise indicated in the project manual, Owner
is responsible to retain and pay for third-party testing.
Confirm the GC owns the cost of all temporary equipment,
electric, water, heat etc. Will the GC be allowed to hook up to
the existing services for construction purposes?
Confirm Builders Risk insurance is to be carried by the
General Contractor.
Confirm OCP insurance is required to be carried by the
general contractor
Will the General Contractor be required to provide snow
plowing during the course of the construction
Are there any requirements for the contractor to provide for
any clerk of the works.
06/09/26 Refer to Section 015000.
06/09/26
06/09/26
06/09/26
06/09/26
For all equipment shown on Sheets A451, A452, and A453, is
there are preferred/recommended vendor and/or supplier
identified for sourcing the equipment package. If so, is this
required to be a sole sourced supplier or is this open to other
suppliers in accordance with the specifications?
06/09/26
No preferred vendors as most items are readily
sourced. Refer to attached list for available vendors of
Manufacturing specialized equipment. Substitutions are
allowed, following Section 012500.
ADDENDUM #
ISSUED
1
1
1
1
1
1
1
1
2
2
2
2
The specifications and ITB do not state a specified questions
deadline. When is the deadline for all Prebid questions.
06/09/26 Refer to Addendum #1.
2
The specifications do not state a substantial completion date
for this project. When is the planned dare and or how many
06/09/26 Refer to RFI #001.
2
days are planned for this project?
Confirm the contractor is to provide Attachments 1-5 along
with the bid from with submission of the bid. Bid bond,
contractor pre qual statement, updated bid statement, prelim
06/09/26 Confirmed.
2
Abatement schedule, prelim project schedule.
Please confirm the extent of protection required by the
contractor to separate the occupied areas of the building from
the construction area. As the contractor will be working in the
existing child development while the school is occupied.
06/09/26
Page 1 of 1
RFI #016
Manufacturing Specialized Equipment Vendor Information
M-01, M-02, M-09, M-10
Haas
Lorraine Palmer
Trident Machine Tools, LLC
860-878-4835
lpalmer@hfotrident.com
M-03
Prototrak
TRAK Machine Tools
Walt Ostrom
203-231-6221
Wostrom@trakmt.com
M-04
Chevalier
Morris Group
Joe Margaitis
860-816-4433
jmargaitis@morrisgroupinc.com
M-05
IAP
Ryan Looper
931-372-0050 x225
ryan@iap-airproducts.com
M-06
Kalamazoo
Anderson Machinery Co
Carl Anderson
203-375-4481
Andersonmach777@gmail.com
M-08
Hexagon Manufacturing Intelligence
Shawn Grady
401-932-5485
Shawn.grady@hexagon.com
CB
MANUFACTURE STUDIO
37
COMPUTER LAB /
PRECISION INSPECTION
37A
STEM & IT
STUDIO
38
EP-10
RB-1
VCT-1
VCT-4
EP-6
DESIGN
STUDIO
39
EP-10
RB-1
VCT-1
VCT-4
EP-6
CLASSROOM
40
TYP. EP-2 F03
2
RB-1
A211A
VCT-5
CLASSROOM
41
F03
EP-2
RB-1
VCT-5
TYP.
2
A211A
CUSTODIAL
33
TLT
32
STO'G
31D
EP-8
RB-1
CPT-1
DWG-8
VCT-4
VCT-2
VCT-4
EP-6
TLT
31C
EP-8 *
CWB-2
PFT-2
PT-4
EP-6
CHILD
DEVELOPMENT
CLASSROOM
31
EP-8
RB-1
VCT-1
VCT-4
VCT-2
DWG-3A
VCT-4
F04
DWG-3C
F04
DWG-3B
VCT-2
VCT-4
CORRIDOR
58
EP-5
RB-2
VCT-1
VCT-4
OFFICE
31A
EP-8
RB-1
VCT-1
F04
DWG-2B
VCT-2
VCT-4
DWG-2A
VCT-4
VCT-4
EP-9
CHILD CARE
31B
EP-8
RB-3
CPT-1,4
PT-4
ALIGN SEAMS
VESTIBULE
31E
EP-3
*
1
WOM-1 RFI #009
CPT-1
CPT-4
F01
PT-5
VESTIBULE
58A
EP-6
RB-5
VCT-2
CORRIDOR
57
F01
PT-5
CHORUS
42
CB
Project Title:
Additions and Alterations:
Jonathan Law High School Career Technology Education
20 LANSDALE AVENUE
MILFORD, CONNECTICUT 06460
1 1st FLOOR FINISH PLAN - PART B
1/8" = 1'-0"
Revision:
SILVER PETRUCELLI + ASSOCIATES
1
3190 WHITNEY AVENUE HAMDEN CT 06518
311 STATE STREET NEW LONDON CT 06320
203 230 9007
silverpetrucelli.com
Description:
ADDENDUM #2
Date:
06/09/2026
Revised By:
FINISH PLAN LEGEND
ROOM FINISH TAG
Room name
101
PT-1
RB-1
CPT-1
ROOM NAME
ROOM NUMBER
WALL FINISH
BASE FINISH
FLOOR FINISH
* REFER TO FINISH PLAN, PATTERN PLAN, OR RELATED
FINISH DRAWINGS FOR ADDITIONAL DETAILED FINISH INFORMATION
ROOM ACCENT TAG
PT-2
WALL ACCENT
RB-2
BASE ACCENT
FINISH TRANSITION TAG
FINISH (1) LVT-1
CPT-1
LINE OF FINISH
TRANSITION
FINISH (2)
GENERAL FINISH NOTES
A. REFER TO PROJECT MANUAL AND 90000 SCHEDULE OF
FINISHES FOR FINISH TYPES AND ABBREVIATIONS.
B. REFER TO FINISH SCHEDULE AND FINISH PLAN FOR GENERAL
FINISHES. REFER TO ALL INTERIOR FINISH NOTES, AND
INTERIOR DRAWINGS (INCLUDING PLANS, ELEVATIONS &
DETAILS) FOR COMPLETE INTERIORS INFORMATION.
C. REFER TO ANSI 117.1 FOR MOUNTING HEIGHTS & FLOOR
CLEARANCES.
D. ALIGN TRANSITION OF FLOOR MATERIAL WITH CENTER OF
HINGE IN DOORWAY, U.O.N;. IN A WRAPPED OPENING WITHOUT
HINGES, REFERENCE FINISH PLANS FOR TRANSITION
LOCATIONS.
E. PROVIDE MANUFACTURER'S RECOMMENDATIONS FOR
TRANSITION BETWEEN UNLIKE FLOORING MATERIALS, U.O.N.
F. FLOOR FINISHES TO EXTEND BENEATH MILLWORK.
G. CONTRACTOR TO INSTALL WALL BASE ON ALL WALLS UNLESS
OTHERWISE NOTED.
H. CONTRACTOR TO DETERMINE TAKE-OFF QUANTITIES AND
ADHESIVE REQUIREMENTS FOR ALL FINISHES.
I. CONTRACTOR TO INSTALL A SINGLE-PIECE, ADA-COMPLIANT,
SOLID STONE THRESHOLD AT ALL FLOORING TRANSITIONS TO
TOILET ROOMS.
J. PROVIDE WALL PLATES AND RECEPTACLES TO BEST MATCH
WALL FINISH AND LIGHT REFLECTIVE VALUE AND/OR FINISH TO
MATCH WALL FINISH.
K. REFER TO PROJECT MANUAL FOR FLOOR LEVELER
RECOMMENDATIONS, TYPICAL.
FINISH HATCH LEGEND
CPT-2
VCT
CPT-3
ACCENT
VCT *
CPT-3
CPT-4
ACCENT
VCT *
NO HATCH IS INDICATED FOR CPT-1 AS IT IS INSTALLED
WITHOUT ACCENTS OR PATTERN. REFER TO SHEET A211B,
THE PROJECT MANUAL, AND THE 90000 SCHEDULE OF
FINISHES FOR ANY ADD'L INSTALLATION INFORMATION.
* REFER TO FINISH PLAN ANNOTATIONS FOR ACTUAL
ACCENT DESIGNATION
FINISH KEY NOTES - PLAN
F01 PATCH IN VCT-5 AS REQ'D; ALIGN SEAMS w/ EXISTING
F02 REFER TO ENLARGED FLOOR PATTERN PLANS FOR MORE
INFORMATION ABOUT COMPLEX FLOORING INSTALLATION
F03 BID ALTERNATE: NEW FLOORING; BASE BID: PATCH / REPAIR
ETR FLOORING AS REQUIRED
F04 BID ALTERNATE: WINDOW WALL GRAPHICS; BASE BID: ACCENT
EPOXY PAINT EP-7
PART B
Drawing Title:
1st FLOOR FINISH PLAN - PART B
Project Phase:
ISSUED FOR BID - 05/29/2026
State Project Number:
#084-0217 EA
Phase 1 of 2
Date:
10/31/2025
Scale:
As indicated
Drawn By:
J. Lipset
Project Number:
24.161
KEY PLAN
Drawing Number:
PROJECT
NORTH
A211B
CPT-3
CONTROL
ROOM
34B
EP-7
RB-2
CPT-2, 3
CPT-2
CPT-3
COMMUNICATION
STUDIO
34
EP-8
RB-2
CPT-2, 3
VCT-4
BROADCAST
RECORDING
34C
EP-8
RB-2
CPT-2, 3
CPT-3
CPT-2
CPT-2
VCT-4
2 ENLARGED FLOOR PATTERN PLAN
1/4" = 1'-0"
WOOD
STORAGE
35B
EP-2
RB-2
SC-1
MAINT.
GARAGE
35C
EP-2
RB-2
SC-1
WOOD STUDIO
35
EP-10
RB-2
EFC-1
ALIGN EDGE OF
EFC-2 w/ CORNER
15'-2 1/2"
EFC-2
5'-0"
8" 3'-4" 1'-0"
EP-6
RB-5
4'-0"
ALIGN
TRANSPORTATION
STUDIO
36
EP-10
RB-2
EFC-1
5'-0"
EFC-3
EP-6
RB-5
ALIGN
ALIGN EDGES OF
EFC-3 w/ M.O.
4'-0"
EP-6
RB-5
4'-0"
ALIGN EDGES OF
EFC-3 w/ M.O.
VCT-1
CPT-2
CPT-3
SOUND
RECORDING
34A
EP-8*
RB-2
CPT-2,3
No.
ROOM NAME
31
CHILD DEVELOPMENT
CLASSROOM
31A OFFICE
31B CHILD CARE
31C TLT
31D STO'G
31E VESTIBULE
34
COMMUNICATION
STUDIO
34A SOUND
RECORDING
34B CONTROL ROOM
34C BROADCAST
RECORDING
35
WOOD STUDIO
35A COMPRESSOR
ROOM
35B WOOD STORAGE
35C MAINT. GARAGE
36
TRANSPORTATION STUDIO
37
MANUFACTURE STUDIO
37A COMPUTER LAB /
PRECISION INSPECTION
37B ELEC
37C IT
38
STEM & IT STUDIO
39
DESIGN STUDIO
39A ELEC
40
CLASSROOM
41
CLASSROOM
45
CLASSROOM
45A TLT
45C VESTIBULE
55
CORRIDOR
58
CORRIDOR
58A VESTIBULE
59
CORRIDOR
FLOOR FINISH
BASE FINISH
VCT-1
RB-1
VCT-1
CPT-1,4
PFT-2
RB-1
RB-3
CWB-2
CPT-1
RB-1
WOM-1
*
CPT-2, 3
RB-2
CPT-2,3
RB-2
CPT-2, 3
RB-2
CPT-2, 3
RB-2
EFC-1
RB-2
SC-1
RB-2
SC-1
RB-2
SC-1
RB-2
EFC-1
RB-2
EFC-1
RB-2
EFC-1
RB-2
SC-1
SC-1
VCT-1
VCT-1
ETR
VCT-5
VCT-5
VCT-5
PFT-1
VCT-5
ETR / VCT-5
RB-2
RB-2
RB-1
RB-1
ETR
RB-1
RB-1
RB-1
CWB-1
RB-1
ETR*
VCT-1
RB-2
VCT-2
RB-5
VCT-1
RB-2
FINISH SCHEDULE
WALL FINISH
CEILING FINISH
COMMENTS
EP-8
ACT-1
TRIM PAINT, EP-3; DOOR PAINT, EP-4; ACCENT PAINT, EP-6
EP-8
EP-8
EP-8 *
EP-8
EP-3
EP-8
EP-8*
ACT-1
ACT-1
ACT-2
ACT-1
ACT-1
ACT-1
ACT-1
TRIM PAINT, EP-3
TRIM PAINT, EP-9; ACCENT PAINT, PT-4
* DOOR TRIM PAINT, EP-9; INSTALL WALL TILE CWT-5, 6, 2, 7, 8 PER PATTERN SHOWN ON ELEVATIONS
4-7/A450
TRIM PAINT, EP-9
* REFER TO DETAIL 4/A421 AND ELEVATION 9/A469 1 RFI #009
BASE BID: AWP-4; BID ALTERNATE: AWP-2 APPLIED TO WALLS PER ELEVATIONS
EP-7
EP-8
EP-10
EP-10
ACT-1
SAS-1
SAS-1
PT-2
AWP-1 APPLIED TO WALLS PER ELEVATIONS; COLOR MATCH SAS-1 TO PT-1
EP-2
EP-2
EP-10
EP-10
EP-10
EP-10
EP-10
EP-10
EP-10
ETR
EP-2
EP-2
EP-2
CWT-1*
EP-2
ETR*
EP-5
EP-6
ETR
PT-2
PT-2
SAS-1
SAS-1
SAS-1
PT-2
PT-2
ACT-1
ACT-1
ETR
ACT-1
ACT-1
ACT-1
ACT-2
ACT-1
ETR*
ACT-1
ACT-1
ACT-1
COLOR MATCH SAS-1 TO PT-1
COLOR MATCH SAS-1 TO PT-1
COLOR MATCH SAS-1 TO PT-1
DOOR TRIM, EP-3; DOOR PAINT, EP-4; DECORATIVE PAINT PER ELEVATIONS
DOOR TRIM, EP-3; DOOR PAINT, EP-4; DECORATIVE PAINT PER ELEVATIONS
DOORS AND TRIM, EP-1
DOORS AND TRIM, EP-1
DOORS AND TRIM, EP-1
* DOOR TRIM PAINT, EP-1; INSTALL WALL TILE CWT-1, 2, 3, 4 PER PATTERN SHOWN ON ELEVATIONS
* MATCH ADJACENT EXISTING WHEREVER NEW WORK NECESSITATES TOUCH UP OF EXISTING
FINISHES
DWG-X (VARIES) AS INDICATED ON DWGS; DOOR TRIM, EP-3; DOOR PAINT, EP-4; SOFFIT PAINT, EP-6
DOORS AND TRIM, EP-1
EXISTING TO REMAIN GLAZED BLOCK
CB
FINISH PLAN LEGEND
ROOM FINISH TAG
Room name
101
PT-1
RB-1
CPT-1
ROOM NAME
ROOM NUMBER
WALL FINISH
BASE FINISH
FLOOR FINISH
* REFER TO FINISH PLAN, PATTERN PLAN, OR RELATED
FINISH DRAWINGS FOR ADDITIONAL DETAILED FINISH INFORMATION
ROOM ACCENT TAG
PT-2
WALL ACCENT
RB-2
BASE ACCENT
FINISH TRANSITION TAG
FINISH (1) LVT-1
CPT-1
LINE OF FINISH
TRANSITION
FINISH (2)
GENERAL FINISH NOTES
A. REFER TO PROJECT MANUAL AND 90000 SCHEDULE OF
FINISHES FOR FINISH TYPES AND ABBREVIATIONS.
B. REFER TO FINISH SCHEDULE AND FINISH PLAN FOR GENERAL
FINISHES. REFER TO ALL INTERIOR FINISH NOTES, AND
INTERIOR DRAWINGS (INCLUDING PLANS, ELEVATIONS &
DETAILS) FOR COMPLETE INTERIORS INFORMATION.
C. REFER TO ANSI 117.1 FOR MOUNTING HEIGHTS & FLOOR
CLEARANCES.
D. ALIGN TRANSITION OF FLOOR MATERIAL WITH CENTER OF
HINGE IN DOORWAY, U.O.N;. IN A WRAPPED OPENING WITHOUT
HINGES, REFERENCE FINISH PLANS FOR TRANSITION
LOCATIONS.
E. PROVIDE MANUFACTURER'S RECOMMENDATIONS FOR
TRANSITION BETWEEN UNLIKE FLOORING MATERIALS, U.O.N.
F. FLOOR FINISHES TO EXTEND BENEATH MILLWORK.
G. CONTRACTOR TO INSTALL WALL BASE ON ALL WALLS UNLESS
OTHERWISE NOTED.
H. CONTRACTOR TO DETERMINE TAKE-OFF QUANTITIES AND
ADHESIVE REQUIREMENTS FOR ALL FINISHES.
I. CONTRACTOR TO INSTALL A SINGLE-PIECE, ADA-COMPLIANT,
SOLID STONE THRESHOLD AT ALL FLOORING TRANSITIONS TO
TOILET ROOMS.
J. PROVIDE WALL PLATES AND RECEPTACLES TO BEST MATCH
WALL FINISH AND LIGHT REFLECTIVE VALUE AND/OR FINISH TO
MATCH WALL FINISH.
K. REFER TO PROJECT MANUAL FOR FLOOR LEVELER
RECOMMENDATIONS, TYPICAL.
FINISH HATCH LEGEND
COMPRESSOR
ROOM
35A
EP-10
RB-2
SC-1
COMPUTER
LAB /
PRECISION
INSPECTION
37A
EP-10
RB-2
EFC-1
ALIGN
IT
37C
EP-10
RB-2
SC-1
5'-0"
EP-6
RB-5
DWG-5
VCT-4
ELEC
37B
EP-10
RB-2
SC-1
VCT-2
F04
DWG-4F
VCT-4
VCT-2
DWG-7B
F04
BROADCAST
RECORDING
34C
EP-8
RB-2
CPT-2, 3
VCT-4
DWG-7C
DWG-7D
CONTROL
ROOM
34B
EP-7
RB-2
CPT-2, 3
F04
F02
COMMUNICATION
STUDIO
34
EP-8
RB-2
CPT-2, 3
ALIGN EDGES OF
EFC-3 w/ M.O.
8'-4"
3'-4"
EP-6
EP-3
EFC-2
MANUFACTURE
STUDIO
37
EP-10
RB-2
EFC-1
F04
DWG-4E
F04
DWG-4D
VCT-4
DWG-7A
VCT-2
CORRIDOR
58
EP-5
RB-2
VCT-1
VCT-2
ALIGN
5'-4"
M.O.
EP-6
DWG-4A
VCT-4
VCT-2
F04
DWG-4C
VCT-4
DWG-8
VCT-4
CUSTODIAL
33
CORRIDOR
VCT-1
59
ETR
RB-2
VCT-1
TLT
VCT-4
32
SOUND
RECORDING
34A
EP-8*
TLT
RB-2
31C
CPT-2,3
EP-7
EP-6
F04
DWG-4B
VCT-2
EP-7
VCT-4
VCT-4
CHILD DEVELOPMENT
CLASSROOM
31
CPT-2
VCT
CPT-3
ACCENT
VCT *
CPT-3
CPT-4
ACCENT
VCT *
NO HATCH IS INDICATED FOR CPT-1 AS IT IS INSTALLED
WITHOUT ACCENTS OR PATTERN. REFER TO SHEET A211B,
THE PROJECT MANUAL, AND THE 90000 SCHEDULE OF
FINISHES FOR ANY ADD'L INSTALLATION INFORMATION.
* REFER TO FINISH PLAN ANNOTATIONS FOR ACTUAL
ACCENT DESIGNATION
FINISH KEY NOTES - PLAN
F01 PATCH IN VCT-5 AS REQ'D; ALIGN SEAMS w/ EXISTING
F02 REFER TO ENLARGED FLOOR PATTERN PLANS FOR MORE
INFORMATION ABOUT COMPLEX FLOORING INSTALLATION
F03 BID ALTERNATE: NEW FLOORING; BASE BID: PATCH / REPAIR
ETR FLOORING AS REQUIRED
F04 BID ALTERNATE: WINDOW WALL GRAPHICS; BASE BID: ACCENT
EPOXY PAINT EP-7
2
A211C
CHILD CARE
31B
STO'G
31D
VESTIBULE
31E
1 1st FLOOR FINISH PLAN - PART C
1/8" = 1'-0"
Project Title:
Additions and Alterations:
Jonathan Law High School Career Technology Education
20 LANSDALE AVENUE
MILFORD, CONNECTICUT 06460
Revision:
SILVER PETRUCELLI + ASSOCIATES
1
3190 WHITNEY AVENUE HAMDEN CT 06518
311 STATE STREET NEW LONDON CT 06320
203 230 9007
silverpetrucelli.com
Description:
ADDENDUM #2
CB
Date:
06/09/2026
Revised By:
PART C
Drawing Title:
1st FLOOR FINISH PLAN - PART C
Project Phase:
ISSUED FOR BID - 05/29/2026
State Project Number:
#084-0217 EA
Phase 1 of 2
Date:
10/31/2025
Scale:
As indicated
Drawn By:
J. Lipset
Project Number:
24.161
KEY PLAN
Drawing Number:
PROJECT
NORTH
A211C
Commodity Codes
  • NAICS 236220Commercial and Institutional Building Construction
  • NAICS 611430Professional and Management Development Training
  • NAICS 611710Educational Support Services
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.

Government Bids

Empower Your Bidding Strategy

Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.

  • Access an extensive database of bids, including comprehensive local and state opportunities.
  • Receive customized alerts for the bids that matter most to your business.
  • Explore detailed specifications to ensure precise and competitive submissions.
  • Gain a competitive edge with up-to-date information and exclusive opportunities.

See Also

Phased Array Ultrasonic Testi...

Follow Phased Array Ultrasonic Testing (PAUT) Level III Certification Pathway Active Contract Opportunity

Federal Agency

Bid Due: 7/13/2026

Hamden Adult Education Brochure

Hamden Adult Education Brochure BId 2960 Hamden Adult Education Brochure Start Date :

State Government of Connecticut

Bid Due: 7/16/2026