Addendum 2 - Jonathan Law High School Career Technology Education Additions and Alterations
Project Information
- Bid Title
- Addendum 2 - Jonathan Law High School Career Technology Education Additions and Alterations
- Issuing Agency
- City of Milford
- Location
- Connecticut
- Published Date
- Jun 10, 2026
- Closing Date
- Jun 29, 2026
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- 1848
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
- 1848 - Addendum 2 - Jonathan Law High School Career Technology Education Additions and Alterations
- Attachment Preview
-
ADDENDUM #2CAREER TECHNOLOGY EDUCATION ADDITIONS & ALTERATIONSJONATHAN LAW HIGH SCHOOL20 LANSDALE AVENUEMILFORD, CT 06460STATE PROJECT #084-0217 EAS/P+A PROJECT #24.161DATE: June 9, 2026The following changes to the Drawings and Project Specifications shall become a part of the Drawingsand Project Specifications; superseding previously issued Drawings and Project Specifications to theextent modified by Addendum #2.General Information:• The deadline for RFIs is Thursday, June 18, 2026.• See attached RFI log. Questions unanswered will be responded to in a future addendum. (2)Changes to the Specifications:• SUPPLEMENTARY INSTRUCTIONS TO BIDDERS, Page 1, Article 1.2.A., revise“fbialka@ci.milford.ct.us” to read “fbialka@milfordct.gov”. (Per Owner)Changes to the Drawings:• The following ARCHTIECTURAL drawings have been deleted in their entirety. New drawings havebeen added and are attached as part of this addendum*:o A211Bo A211C1ST FLOOR FINISH PLAN – PART ‘B’ (Per RFI #009)1ST FLOOR FINISH PLAN – PART ‘C’ (Per RFI #009)The bid date remains June 29, 2026 at 3:00pm by this addendum.The addendum consists of three (3) pages of 8½” x 11” text and two (2) 30” x 42” drawings*.End of Addendum #2Jonathan Law High School Career Technology Education Additions & Alterations – MilfordState Project #084-0217 EAAddendum #2-1SILVER PETRUCELLI + ASSOCIATES3190 Whitney Avenue | Hamden CT 06518311 State Street | New London CT 06320BID RFI LOGProject: Jonathan Law HS CTE Additions & AlterationsState Project #: 084-0217 EAS/P+A Project #: 24.1616/11/2026RFI Deadline: 06/18/202606/18/26, 3:00pBids Due: 06/29/26, 3:00pRFI #001002003004005006007008009010011012013014015016017018019020QUESTIONDATERESPONSERECEIVEDBidder is to provide the # of days to substantiallyCould you please provide the substantial completion date? Iknow the abatement must be completed by August this year.06/02/26complete the entire project in their Bid Form. Apreliminary schedule for both the entire project &abatement portion is also required with the Bid.What is the expected substantial completion date for thisproject?06/05/26 Refer to RFI #001.Will the City waive the permit fees?06/05/26 Refer to SIB, 9.3.Are there ballistic steel doors on the project? The only ballisticdoor wihtout a blast rating on the prints is door 31B.3 and it isshown as wood.06/05/26No, ballistic doors are wood. Refer to Addendum #1 foradditional information.Many of my subcontractors are saying the bid date is toosoon. Can it be extended?Bid due date to be extended however substantial06/05/26 completion date for abatement does change. Refer toAddendum #1.PE is a polyethylene core that is not fire rated. Should wecarry this?06/05/26 Yes, per Section 074213.23.1/4" (6mm) thick panels aren't available; only 3mm and 4mmare available for PE and only 4mm for FR (fire-rated). Whichone should we choose for this scope?06/05/264mm. Refer to Addendum #1 for Section 074213.23revisions.Is the GC repsonsible for purchasing all of the equipmentlisted on the drawings?06/05/26Yes, unless otherwise indicated on the equipmentschedules.The specifications manual contains section 096523 - metalbase. And yet I could not this item on the finish schedule.Indicate the locations and extent of application of this item.06/08/26Metal base is in Vestibule 31E. Refer to Addendum #2for revised Drawings A211B & A211C.Confirm who will be paying for third party testing, we note thatIBC 2021 Section 1704.2 requires special inspections to beperformed by an approved agency retained by the Owner orOwner's agent, "other than contractor", in accordance with theindependence requirements of IBC 2021 Section 1703.1.1.Given that these services typically are to be performed by theOwner's retained agency, and that the scope and frequency ofrequired testing are not fully defined, please confirm whetherthe Owner will retain and pay for these services directly, or ifthe Contractor is to carry an allowance or other defined valuefor inclusion in the proposal.06/09/26Unless otherwise indicated in the project manual, Owneris responsible to retain and pay for third-party testing.Confirm the GC owns the cost of all temporary equipment,electric, water, heat etc. Will the GC be allowed to hook up tothe existing services for construction purposes?Confirm Builders Risk insurance is to be carried by theGeneral Contractor.Confirm OCP insurance is required to be carried by thegeneral contractorWill the General Contractor be required to provide snowplowing during the course of the constructionAre there any requirements for the contractor to provide forany clerk of the works.06/09/26 Refer to Section 015000.06/09/2606/09/2606/09/2606/09/26For all equipment shown on Sheets A451, A452, and A453, isthere are preferred/recommended vendor and/or supplieridentified for sourcing the equipment package. If so, is thisrequired to be a sole sourced supplier or is this open to othersuppliers in accordance with the specifications?06/09/26No preferred vendors as most items are readilysourced. Refer to attached list for available vendors ofManufacturing specialized equipment. Substitutions areallowed, following Section 012500.ADDENDUM #ISSUED111111112222The specifications and ITB do not state a specified questionsdeadline. When is the deadline for all Prebid questions.06/09/26 Refer to Addendum #1.2The specifications do not state a substantial completion datefor this project. When is the planned dare and or how many06/09/26 Refer to RFI #001.2days are planned for this project?Confirm the contractor is to provide Attachments 1-5 alongwith the bid from with submission of the bid. Bid bond,contractor pre qual statement, updated bid statement, prelim06/09/26 Confirmed.2Abatement schedule, prelim project schedule.Please confirm the extent of protection required by thecontractor to separate the occupied areas of the building fromthe construction area. As the contractor will be working in theexisting child development while the school is occupied.06/09/26Page 1 of 1RFI #016Manufacturing Specialized Equipment Vendor InformationM-01, M-02, M-09, M-10HaasLorraine PalmerTrident Machine Tools, LLC860-878-4835lpalmer@hfotrident.comM-03PrototrakTRAK Machine ToolsWalt Ostrom203-231-6221Wostrom@trakmt.comM-04ChevalierMorris GroupJoe Margaitis860-816-4433jmargaitis@morrisgroupinc.comM-05IAPRyan Looper931-372-0050 x225ryan@iap-airproducts.comM-06KalamazooAnderson Machinery CoCarl Anderson203-375-4481Andersonmach777@gmail.comM-08Hexagon Manufacturing IntelligenceShawn Grady401-932-5485Shawn.grady@hexagon.comCBMANUFACTURE STUDIO37COMPUTER LAB /PRECISION INSPECTION37ASTEM & ITSTUDIO38EP-10RB-1VCT-1VCT-4EP-6DESIGNSTUDIO39EP-10RB-1VCT-1VCT-4EP-6CLASSROOM40TYP. EP-2 F032RB-1A211AVCT-5CLASSROOM41F03EP-2RB-1VCT-5TYP.2A211ACUSTODIAL33TLT32STO'G31DEP-8RB-1CPT-1DWG-8VCT-4VCT-2VCT-4EP-6TLT31CEP-8 *CWB-2PFT-2PT-4EP-6CHILDDEVELOPMENTCLASSROOM31EP-8RB-1VCT-1VCT-4VCT-2DWG-3AVCT-4F04DWG-3CF04DWG-3BVCT-2VCT-4CORRIDOR58EP-5RB-2VCT-1VCT-4OFFICE31AEP-8RB-1VCT-1F04DWG-2BVCT-2VCT-4DWG-2AVCT-4VCT-4EP-9CHILD CARE31BEP-8RB-3CPT-1,4PT-4ALIGN SEAMSVESTIBULE31EEP-3*1WOM-1 RFI #009CPT-1CPT-4F01PT-5VESTIBULE58AEP-6RB-5VCT-2CORRIDOR57F01PT-5CHORUS42CBProject Title:Additions and Alterations:Jonathan Law High School Career Technology Education20 LANSDALE AVENUEMILFORD, CONNECTICUT 064601 1st FLOOR FINISH PLAN - PART B1/8" = 1'-0"Revision:SILVER PETRUCELLI + ASSOCIATES13190 WHITNEY AVENUE HAMDEN CT 06518311 STATE STREET NEW LONDON CT 06320203 230 9007silverpetrucelli.comDescription:ADDENDUM #2Date:06/09/2026Revised By:FINISH PLAN LEGENDROOM FINISH TAGRoom name101PT-1RB-1CPT-1ROOM NAMEROOM NUMBERWALL FINISHBASE FINISHFLOOR FINISH* REFER TO FINISH PLAN, PATTERN PLAN, OR RELATEDFINISH DRAWINGS FOR ADDITIONAL DETAILED FINISH INFORMATIONROOM ACCENT TAGPT-2WALL ACCENTRB-2BASE ACCENTFINISH TRANSITION TAGFINISH (1) LVT-1CPT-1LINE OF FINISHTRANSITIONFINISH (2)GENERAL FINISH NOTESA. REFER TO PROJECT MANUAL AND 90000 SCHEDULE OFFINISHES FOR FINISH TYPES AND ABBREVIATIONS.B. REFER TO FINISH SCHEDULE AND FINISH PLAN FOR GENERALFINISHES. REFER TO ALL INTERIOR FINISH NOTES, ANDINTERIOR DRAWINGS (INCLUDING PLANS, ELEVATIONS &DETAILS) FOR COMPLETE INTERIORS INFORMATION.C. REFER TO ANSI 117.1 FOR MOUNTING HEIGHTS & FLOORCLEARANCES.D. ALIGN TRANSITION OF FLOOR MATERIAL WITH CENTER OFHINGE IN DOORWAY, U.O.N;. IN A WRAPPED OPENING WITHOUTHINGES, REFERENCE FINISH PLANS FOR TRANSITIONLOCATIONS.E. PROVIDE MANUFACTURER'S RECOMMENDATIONS FORTRANSITION BETWEEN UNLIKE FLOORING MATERIALS, U.O.N.F. FLOOR FINISHES TO EXTEND BENEATH MILLWORK.G. CONTRACTOR TO INSTALL WALL BASE ON ALL WALLS UNLESSOTHERWISE NOTED.H. CONTRACTOR TO DETERMINE TAKE-OFF QUANTITIES ANDADHESIVE REQUIREMENTS FOR ALL FINISHES.I. CONTRACTOR TO INSTALL A SINGLE-PIECE, ADA-COMPLIANT,SOLID STONE THRESHOLD AT ALL FLOORING TRANSITIONS TOTOILET ROOMS.J. PROVIDE WALL PLATES AND RECEPTACLES TO BEST MATCHWALL FINISH AND LIGHT REFLECTIVE VALUE AND/OR FINISH TOMATCH WALL FINISH.K. REFER TO PROJECT MANUAL FOR FLOOR LEVELERRECOMMENDATIONS, TYPICAL.FINISH HATCH LEGENDCPT-2VCTCPT-3ACCENTVCT *CPT-3CPT-4ACCENTVCT *NO HATCH IS INDICATED FOR CPT-1 AS IT IS INSTALLEDWITHOUT ACCENTS OR PATTERN. REFER TO SHEET A211B,THE PROJECT MANUAL, AND THE 90000 SCHEDULE OFFINISHES FOR ANY ADD'L INSTALLATION INFORMATION.* REFER TO FINISH PLAN ANNOTATIONS FOR ACTUALACCENT DESIGNATIONFINISH KEY NOTES - PLANF01 PATCH IN VCT-5 AS REQ'D; ALIGN SEAMS w/ EXISTINGF02 REFER TO ENLARGED FLOOR PATTERN PLANS FOR MOREINFORMATION ABOUT COMPLEX FLOORING INSTALLATIONF03 BID ALTERNATE: NEW FLOORING; BASE BID: PATCH / REPAIRETR FLOORING AS REQUIREDF04 BID ALTERNATE: WINDOW WALL GRAPHICS; BASE BID: ACCENTEPOXY PAINT EP-7PART BDrawing Title:1st FLOOR FINISH PLAN - PART BProject Phase:ISSUED FOR BID - 05/29/2026State Project Number:#084-0217 EAPhase 1 of 2Date:10/31/2025Scale:As indicatedDrawn By:J. LipsetProject Number:24.161KEY PLANDrawing Number:PROJECTNORTHA211BCPT-3CONTROLROOM34BEP-7RB-2CPT-2, 3CPT-2CPT-3COMMUNICATIONSTUDIO34EP-8RB-2CPT-2, 3VCT-4BROADCASTRECORDING34CEP-8RB-2CPT-2, 3CPT-3CPT-2CPT-2VCT-42 ENLARGED FLOOR PATTERN PLAN1/4" = 1'-0"WOODSTORAGE35BEP-2RB-2SC-1MAINT.GARAGE35CEP-2RB-2SC-1WOOD STUDIO35EP-10RB-2EFC-1ALIGN EDGE OFEFC-2 w/ CORNER15'-2 1/2"EFC-25'-0"8" 3'-4" 1'-0"EP-6RB-54'-0"ALIGNTRANSPORTATIONSTUDIO36EP-10RB-2EFC-15'-0"EFC-3EP-6RB-5ALIGNALIGN EDGES OFEFC-3 w/ M.O.4'-0"EP-6RB-54'-0"ALIGN EDGES OFEFC-3 w/ M.O.VCT-1CPT-2CPT-3SOUNDRECORDING34AEP-8*RB-2CPT-2,3No.ROOM NAME31CHILD DEVELOPMENTCLASSROOM31A OFFICE31B CHILD CARE31C TLT31D STO'G31E VESTIBULE34COMMUNICATIONSTUDIO34A SOUNDRECORDING34B CONTROL ROOM34C BROADCASTRECORDING35WOOD STUDIO35A COMPRESSORROOM35B WOOD STORAGE35C MAINT. GARAGE36TRANSPORTATION STUDIO37MANUFACTURE STUDIO37A COMPUTER LAB /PRECISION INSPECTION37B ELEC37C IT38STEM & IT STUDIO39DESIGN STUDIO39A ELEC40CLASSROOM41CLASSROOM45CLASSROOM45A TLT45C VESTIBULE55CORRIDOR58CORRIDOR58A VESTIBULE59CORRIDORFLOOR FINISHBASE FINISHVCT-1RB-1VCT-1CPT-1,4PFT-2RB-1RB-3CWB-2CPT-1RB-1WOM-1*CPT-2, 3RB-2CPT-2,3RB-2CPT-2, 3RB-2CPT-2, 3RB-2EFC-1RB-2SC-1RB-2SC-1RB-2SC-1RB-2EFC-1RB-2EFC-1RB-2EFC-1RB-2SC-1SC-1VCT-1VCT-1ETRVCT-5VCT-5VCT-5PFT-1VCT-5ETR / VCT-5RB-2RB-2RB-1RB-1ETRRB-1RB-1RB-1CWB-1RB-1ETR*VCT-1RB-2VCT-2RB-5VCT-1RB-2FINISH SCHEDULEWALL FINISHCEILING FINISHCOMMENTSEP-8ACT-1TRIM PAINT, EP-3; DOOR PAINT, EP-4; ACCENT PAINT, EP-6EP-8EP-8EP-8 *EP-8EP-3EP-8EP-8*ACT-1ACT-1ACT-2ACT-1ACT-1ACT-1ACT-1TRIM PAINT, EP-3TRIM PAINT, EP-9; ACCENT PAINT, PT-4* DOOR TRIM PAINT, EP-9; INSTALL WALL TILE CWT-5, 6, 2, 7, 8 PER PATTERN SHOWN ON ELEVATIONS4-7/A450TRIM PAINT, EP-9* REFER TO DETAIL 4/A421 AND ELEVATION 9/A469 1 RFI #009BASE BID: AWP-4; BID ALTERNATE: AWP-2 APPLIED TO WALLS PER ELEVATIONSEP-7EP-8EP-10EP-10ACT-1SAS-1SAS-1PT-2AWP-1 APPLIED TO WALLS PER ELEVATIONS; COLOR MATCH SAS-1 TO PT-1EP-2EP-2EP-10EP-10EP-10EP-10EP-10EP-10EP-10ETREP-2EP-2EP-2CWT-1*EP-2ETR*EP-5EP-6ETRPT-2PT-2SAS-1SAS-1SAS-1PT-2PT-2ACT-1ACT-1ETRACT-1ACT-1ACT-1ACT-2ACT-1ETR*ACT-1ACT-1ACT-1COLOR MATCH SAS-1 TO PT-1COLOR MATCH SAS-1 TO PT-1COLOR MATCH SAS-1 TO PT-1DOOR TRIM, EP-3; DOOR PAINT, EP-4; DECORATIVE PAINT PER ELEVATIONSDOOR TRIM, EP-3; DOOR PAINT, EP-4; DECORATIVE PAINT PER ELEVATIONSDOORS AND TRIM, EP-1DOORS AND TRIM, EP-1DOORS AND TRIM, EP-1* DOOR TRIM PAINT, EP-1; INSTALL WALL TILE CWT-1, 2, 3, 4 PER PATTERN SHOWN ON ELEVATIONS* MATCH ADJACENT EXISTING WHEREVER NEW WORK NECESSITATES TOUCH UP OF EXISTINGFINISHESDWG-X (VARIES) AS INDICATED ON DWGS; DOOR TRIM, EP-3; DOOR PAINT, EP-4; SOFFIT PAINT, EP-6DOORS AND TRIM, EP-1EXISTING TO REMAIN GLAZED BLOCKCBFINISH PLAN LEGENDROOM FINISH TAGRoom name101PT-1RB-1CPT-1ROOM NAMEROOM NUMBERWALL FINISHBASE FINISHFLOOR FINISH* REFER TO FINISH PLAN, PATTERN PLAN, OR RELATEDFINISH DRAWINGS FOR ADDITIONAL DETAILED FINISH INFORMATIONROOM ACCENT TAGPT-2WALL ACCENTRB-2BASE ACCENTFINISH TRANSITION TAGFINISH (1) LVT-1CPT-1LINE OF FINISHTRANSITIONFINISH (2)GENERAL FINISH NOTESA. REFER TO PROJECT MANUAL AND 90000 SCHEDULE OFFINISHES FOR FINISH TYPES AND ABBREVIATIONS.B. REFER TO FINISH SCHEDULE AND FINISH PLAN FOR GENERALFINISHES. REFER TO ALL INTERIOR FINISH NOTES, ANDINTERIOR DRAWINGS (INCLUDING PLANS, ELEVATIONS &DETAILS) FOR COMPLETE INTERIORS INFORMATION.C. REFER TO ANSI 117.1 FOR MOUNTING HEIGHTS & FLOORCLEARANCES.D. ALIGN TRANSITION OF FLOOR MATERIAL WITH CENTER OFHINGE IN DOORWAY, U.O.N;. IN A WRAPPED OPENING WITHOUTHINGES, REFERENCE FINISH PLANS FOR TRANSITIONLOCATIONS.E. PROVIDE MANUFACTURER'S RECOMMENDATIONS FORTRANSITION BETWEEN UNLIKE FLOORING MATERIALS, U.O.N.F. FLOOR FINISHES TO EXTEND BENEATH MILLWORK.G. CONTRACTOR TO INSTALL WALL BASE ON ALL WALLS UNLESSOTHERWISE NOTED.H. CONTRACTOR TO DETERMINE TAKE-OFF QUANTITIES ANDADHESIVE REQUIREMENTS FOR ALL FINISHES.I. CONTRACTOR TO INSTALL A SINGLE-PIECE, ADA-COMPLIANT,SOLID STONE THRESHOLD AT ALL FLOORING TRANSITIONS TOTOILET ROOMS.J. PROVIDE WALL PLATES AND RECEPTACLES TO BEST MATCHWALL FINISH AND LIGHT REFLECTIVE VALUE AND/OR FINISH TOMATCH WALL FINISH.K. REFER TO PROJECT MANUAL FOR FLOOR LEVELERRECOMMENDATIONS, TYPICAL.FINISH HATCH LEGENDCOMPRESSORROOM35AEP-10RB-2SC-1COMPUTERLAB /PRECISIONINSPECTION37AEP-10RB-2EFC-1ALIGNIT37CEP-10RB-2SC-15'-0"EP-6RB-5DWG-5VCT-4ELEC37BEP-10RB-2SC-1VCT-2F04DWG-4FVCT-4VCT-2DWG-7BF04BROADCASTRECORDING34CEP-8RB-2CPT-2, 3VCT-4DWG-7CDWG-7DCONTROLROOM34BEP-7RB-2CPT-2, 3F04F02COMMUNICATIONSTUDIO34EP-8RB-2CPT-2, 3ALIGN EDGES OFEFC-3 w/ M.O.8'-4"3'-4"EP-6EP-3EFC-2MANUFACTURESTUDIO37EP-10RB-2EFC-1F04DWG-4EF04DWG-4DVCT-4DWG-7AVCT-2CORRIDOR58EP-5RB-2VCT-1VCT-2ALIGN5'-4"℄ M.O.EP-6DWG-4AVCT-4VCT-2F04DWG-4CVCT-4DWG-8VCT-4CUSTODIAL33CORRIDORVCT-159ETRRB-2VCT-1TLTVCT-432SOUNDRECORDING34AEP-8*TLTRB-231CCPT-2,3EP-7EP-6F04DWG-4BVCT-2EP-7VCT-4VCT-4CHILD DEVELOPMENTCLASSROOM31CPT-2VCTCPT-3ACCENTVCT *CPT-3CPT-4ACCENTVCT *NO HATCH IS INDICATED FOR CPT-1 AS IT IS INSTALLEDWITHOUT ACCENTS OR PATTERN. REFER TO SHEET A211B,THE PROJECT MANUAL, AND THE 90000 SCHEDULE OFFINISHES FOR ANY ADD'L INSTALLATION INFORMATION.* REFER TO FINISH PLAN ANNOTATIONS FOR ACTUALACCENT DESIGNATIONFINISH KEY NOTES - PLANF01 PATCH IN VCT-5 AS REQ'D; ALIGN SEAMS w/ EXISTINGF02 REFER TO ENLARGED FLOOR PATTERN PLANS FOR MOREINFORMATION ABOUT COMPLEX FLOORING INSTALLATIONF03 BID ALTERNATE: NEW FLOORING; BASE BID: PATCH / REPAIRETR FLOORING AS REQUIREDF04 BID ALTERNATE: WINDOW WALL GRAPHICS; BASE BID: ACCENTEPOXY PAINT EP-72A211CCHILD CARE31BSTO'G31DVESTIBULE31E1 1st FLOOR FINISH PLAN - PART C1/8" = 1'-0"Project Title:Additions and Alterations:Jonathan Law High School Career Technology Education20 LANSDALE AVENUEMILFORD, CONNECTICUT 06460Revision:SILVER PETRUCELLI + ASSOCIATES13190 WHITNEY AVENUE HAMDEN CT 06518311 STATE STREET NEW LONDON CT 06320203 230 9007silverpetrucelli.comDescription:ADDENDUM #2CBDate:06/09/2026Revised By:PART CDrawing Title:1st FLOOR FINISH PLAN - PART CProject Phase:ISSUED FOR BID - 05/29/2026State Project Number:#084-0217 EAPhase 1 of 2Date:10/31/2025Scale:As indicatedDrawn By:J. LipsetProject Number:24.161KEY PLANDrawing Number:PROJECTNORTHA211C
- Commodity Codes
-
- NAICS 236220Commercial and Institutional Building Construction
- NAICS 611430Professional and Management Development Training
- NAICS 611710Educational Support Services
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Phased Array Ultrasonic Testi...
Follow Phased Array Ultrasonic Testing (PAUT) Level III Certification Pathway Active Contract Opportunity
Federal Agency
Bid Due: 7/13/2026
Hamden Adult Education Brochure
Hamden Adult Education Brochure BId 2960 Hamden Adult Education Brochure Start Date :
State Government of Connecticut
Bid Due: 7/16/2026