Lancaster Way Drainage Improvements
Project Information
- Bid Title
- Lancaster Way Drainage Improvements
- Issuing Agency
- City of Daphne
- Location
- Alabama
- Published Date
- May 22, 2026
- Closing Date
- Jun 17, 2026
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- 2026-I-
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Bid Number: 2026-I-
Bid Title: Lancaster Way Drainage Improvements
Category: Construction: Drainage Projects Status: Open Bid Recipient: City of Daphne - Suzanne Henson Description: One hundred and eighty (180) calendar days will be allowed for the completion of the Project.
The Work will consist of: Removal and replacement of damaged concrete ditch and repair of existing concrete ditch where applicable.
Publication Date/Time: 5/22/2026 4:00 PM Publication Information: See Adv Closing Date/Time: 6/17/2026 11:30 AM Submittal Information: Submit to City of Daphne, City Hall, Attention: Suzanne Henson Bid Opening Information: 6/17/26 at 11:30 A.M. Pre-bid Meeting: June 3, 2026 at 10:00 A.M Contact Person: The Engineer for the Project is Larry Smith - lsmith@secivileng.com (S.E. Civil Engineering & Surveying). Ph: (251) 990-6566. Download Available: Yes from Engineer-see Adv Fee: Digital Download is no charge Plan & Spec Available: Potential Bidders may procure Specifications materials from the Engineer digitally at no charge. Contact Larry Smith at lsmith@secivileng.com to request a set. No Specifications will be issued to potential Bidders later than twenty-four (24) hours prior to the scheduled bid opening. Business Hours: Monday - Friday - 8a.m. - 5p.m Related Documents: - Attachment Preview
-
ADVERTISEMENT FOR BIDSSealed proposals will be received by City personnel at City of Daphne at Daphne City Hall (1705Main Street, P. O. Box 400, Daphne, AL 36526) at 11:30 A.M. on June 17, 2026 and thenpublicly opened for furnishing all labor and materials, and performing all work required by Cityof Daphne for the following project:BID DOCUMENT NO: 2026-I-LANCASTER WAY DRAINAGE IMPROVEMENTSBids received after the designated deadline will not be considered.One hundred and eighty (180) calendar days will be allowed for the completion of the Project.The Work will consist of: Removal and replacement of damaged concrete ditch and repair ofexisting concrete ditch where applicable.All Bids must be on blank forms provided in the Specifications and submitted in its entirety.A Bid Bond executed and signed by a surety company duly authorized and qualified to makebonds in the State of Alabama or a cashier’s check drawn on an Alabama bank, payable toCity of Daphne, Alabama, for an amount of five percent (5%) of the amount bid, but in noevent more than ten thousand dollars ($10,000), shall be filed with the Bid.The response must be sealed and labeled on the outside of envelope including the contractor’scompany name and address as follows:BID DOCUMENT NO: 2026-I-LANCASTER WAY DRAINAGE IMPROVEMENTSGC LICENSE # __________________A performance bond in the form and terms approved by the City in an amount not less than thecontract price will be required at the signing of the Agreement. A labor and materials bond in theform and terms approved by the City in an amount not less than the Contract Price insuringpayment for all labor and materials shall also be required at the signing of the Agreement. Inaddition, the Contractor must furnish to the City at the time of the signing of the Agreement acertificate of insurance coverage as provided in the Contract Documents. The City reserves theright to reject any and/or all Bids and to waive informalities and to furnish any item of material orwork to change the amount of the Contract Price.Liquidated damages for non-completion of the Work within the Contract Times will be assessedin accordance with the terms of the Contract.Bidders shall not include speculative or anticipated tariffs in their bid price. Only tariffs announcedor imposed as of the bid submission deadline may be considered in calculating bid amounts. Ifapplicable tariffs are imposed after the bid submission deadline, the awarded contractor mayrequest a change order pursuant to the contract’s price-escalation provision.The Engineer for the Project is Larry Smith (S.E. Civil Engineering & Surveying). The IssuingOffice for the Bidding Documents is 9969 Windmill Rd. Fairhope, AL 36532 Ph: (251) 990-6566. Prospective Bidders may examine the Bidding Documents at the Issuing Office on Mondaysthrough Fridays between the hours of 8:00 a.m. – 5:00 p.m. and may obtain copies of the BiddingDocuments from the Issuing Office as described below.Potential Bidders may procure Specifications materials from the Engineer digitally at no charge.Contact Larry Smith at lsmith@secivileng.com to request a set. No Specifications will be issuedto potential Bidders later than twenty-four (24) hours prior to the scheduled bid opening. Noquestions from potential Bidders will be answered through addendum later than forty-eight (48)hours prior to the scheduled bid opening.Bids are invited from all qualified respondents. The City is an Equal Opportunity Employer. Allminority business enterprises (MBE) and disadvantaged business enterprises (DBE) will be takeninto consideration.No Bids will be considered unless the Bidder, whether resident or non-resident of Alabama, isproperly qualified to submit a Bid for this Project in accordance with all applicable laws of theState of Alabama. This shall include evidence of holding a current license from the State LicensingBoard for General Contractors, as required by Chapter 8, Title 34 of the Code of Alabama (1975).In addition, non-residents of the State, if a corporation, shall show evidence of having qualifiedwith the Secretary of State to do business in the State of Alabama. A copy of required State ofAlabama license shall be included in the bid submittal and listed on the outside of the submittalenvelope.In evaluating Bidders, the City will consider the qualifications of Bidders and may consider thequalifications and experience of Subcontractors, Suppliers, and other individuals or entitiesproposed for those portions of the Work for which the identity of Subcontractors, Suppliers, andother individuals or entities must be submitted as may be provided in the SupplementaryConditions.The City may conduct such investigations as the City deems necessary to establish theresponsibility, qualifications, and financial ability of Bidders, proposed Subcontractors, Suppliers,individuals, or entities proposed for those portions of the Work in accordance with the ContractDocuments.The City may disqualify Bidders that have had prior demands placed on a bid bond, payment bond,or performance bond within the last five (5) years prior to the date of this Bid submission.If the Contract is to be awarded, the City will award the Contract to the lowest responsive andresponsible Bidder. No Bid shall be withdrawn for a period of sixty (60) days subsequent to theopening of Bids without the consent of the City Council of City of Daphne, Alabama.A mandatory pre-bid conference will be held on June 3, 2026 at 10:00A.M., at the City ofDaphne City Hall at 1705 Main Street, Daphne, AL 36526. All prospective Bidders must have arepresentative present at the pre-bid conference.Robin LeJeune, Mayor
- Commodity Codes
-
- NAICS 237110Water and Sewer Line and Related Structures Construction
- NAICS 237310Highway, Street, and Bridge Construction
- NAICS 237990Other Heavy and Civil Engineering Construction
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Troubleshoot/Repairs to Rollu...
Sourcing Project Number: SRC0000034386 Solicitation Label: Troubleshoot/Repairs to Rollup Door at Gadsden MAS/Ira
State Government of Alabama
Bid Due: 7/15/2026
Housing Implementation & Inve...
Project ID: Title: Housing Implementation & Investment Proposal Addenda: 0 Release Date: 6/3/2026
City of Montgomery
Bid Due: 7/15/2026