RFQ No. 26-14 - Design-Connecting Communities Trails Project - Addendum No. 3 - Q&A's
Project Information
- Bid Title
- RFQ No. 26-14 - Design-Connecting Communities Trails Project - Addendum No. 3 - Q&A's
- Issuing Agency
- Pueblo County
- Location
- Colorado
- Published Date
- May 22, 2026
- Closing Date
- May 28, 2026
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- RFQ No. 26-14
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
- RFQ No. 26-14 - Design-Connecting Communities Trails Project - Addendum No. 3 - Q&A's 432.06 KB
- Attachment Preview
-
PUEBLO COUNTY PURCHASING215 WEST 10TH STREET, ROOM 14PUEBLO, CO 81003Telephone: (719) 583-6097purchasing@pueblocounty.usADDENDUM NO. 3COUNTY OF PUEBLO, COLORADORFQ No 26-14 - Design-Connecting Communities Trails ProjectDate: May 22, 2025What thse Change is being done to the current RFQ:1. Questions & ResponsesThe proposer shall permanently affix this Addendum No. 3 to the RFQ packet so it will besubmitted with the RFQ.The undersigned proposer acknowledges receipt of this Addendum No. 3.Received by: _________________________________________Firm Name: ___________________________________________Address: _____________________________________________Date: ________________________________________________Page 1 of 11. Does the County anticipate the need for any easements, or right-of-way? The RFPreferences right-of-way plans, but it appears that the corridor allows adequatespace for the trail without obtaining easements. To what extent are the right-of-wayplans needed?Response: Yes, ROW plans will be required to develop an easement for Countymaintenance of the trail.2. Does the County anticipate any environmental analysis or research needed alongthe corridor?Response: Yes.3. Can the County confirm what is required for the submittal? Section 4.1 indicatesthat email of the proposal is a separate option from hardcopy, but in Section 4.3, fivehardcopy and a pdf on a cd/usb is required.Response: Please submit RFQ’s via hardcopy PDF or USB.4. Is geotechnical engineering required for this project? Have geotechnicalinvestigations been conducted along Medal of Honor Blvd that can be used for themulti-use trail portion of the project? Is there any geotechnical information frompast projects along the west side of Pueblo Blvd. that can be used?Response: Yes, geotechnical engineering will be required for the SH-45 portion ofthe trail. Geotechnical reports were completed for the Medal of Honor Project andwill be uploaded via Addendum #2. The County does not possess any geotechnicalinformation for past projects in CDOT ROW.5. Can the County provide the figures from the planning document that show theproposed trailhead and mobility hub locations as indicated in Section 2.1, 2ndparagraph?Response: The figure will be posted under Addendum #2.6. The RFQ for the connecting communities project references a dropbox containingrelevant information. Would you be able to share that with me? The RFQ mentions aplanning document with Figures outlining the adjacent transit stops. Is this availableto share?Response: Response: The figure will be posted under Addendum #2.7. Section 4.0 SOQ Submittal Requirements - Section 4.1 (page 11) Due Date, Timeand Location indicate a “Via email: purchasing@pueblocounty.us” option fordelivery of the SOQ. Is this in lieu of the Four (4) bound copies and one CD or USBdrive from Section 4.3 (page 12) Submittal Quantities? Please Clarify.Please submit RFQ’s via hardcopy PDF or USB.8. Section 4.2 (page 12) Format indicates 30 single-sided pages and one page for aProject Timeline-Gantt Chart. Can the Gantt Chart be an 11x17 page size. And is theGantt Chart part of the 30 single-sided page limit? Also, can an additional 11 x 17page be used as part of the 30 single-sided page limit? Please clarify.Response: Yes, an 11 x 17-page size can be used for the Gantt Chart and the 30single-sided pages. The Gantt Chart is not included in the page limit.
- Commodity Codes
-
- NAICS 236220Commercial and Institutional Building Construction
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Wastewater Reclamation Facili...
Project ID: 26-005 (WWAN04) Title: Wastewater Reclamation Facility Primary Scum Flushing Loop Addenda:
City of pueblo
Bid Due: 7/15/2026
City of Fort Morgan Wastewate...
Bid Title: City of Fort Morgan Wastewater Treatment Facility Expansion Project Category: Construction
Fort Morgan
Bid Due: 7/09/2026