IFB: Multiple Secure Vestibules Project - Addendum 1
Project Information
- Bid Title
- IFB: Multiple Secure Vestibules Project - Addendum 1
- Issuing Agency
- Gaston County Public Schools
- Location
- North Carolina
- Published Date
- Nov 19, 2025
- Closing Date
- Dec 4, 2025
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
- Attachment Preview
-
Addendum No. 1To:Project Name:Project #:Date:Owner:Architect:All Prospective BiddersGaston County Schools – Multiple Secure Vestibules025353.0011/18/2025Gaston County Schools943 Osceola StreetGastonia, NC 28053McMillan Pazdan Smith Architecture1422 South Tryon Street / Suite 700Charlotte, NC 28203This addendum forms part of the Bidding and Contract Documents and modifies the original bidding documents: theDrawings dated 04 November 2025 and the Project Manual dated 04 November 2025. Acknowledge receipt of thisaddendum in the space provided on the Bid Form. FAILURE TO ACKNOWLEDGE RECEIPT OF THE ADDENDA ONTHE BID FORM MAY DISQUALIFY THE BID.This Addendum may include revised Project Manual pages and/or Drawings to be inserted in the correct sequence in theBidding Documents.Text deleted from the Project Manual by this Addendum is indicated by overstrike. Example: overstrikeBold lettering indicates lines in which text has been modified or added by the Addendum.Revisions to the Drawings are identified by the Addendum number.Cross-check all revised documents with the following:Pre-Bid MeetingPlease see attached copy of pre-bid agenda and sign-in sheet.Project Manual:Section No. Section Name001113Advertisement for BidsRevision/Change:REPLACE this specification section in its entirety with the attachedrevised specification section, showing the bid due date time modifiedto 3:00 p.m.Drawings:Drawing No.A050AA110AA115AA050BA110BA115BA050CA110CDrawing TitleVestibule DemolitionPlanEGHS Vestibule Plans &ElevationsEGHS Finish & SignagePlansBPES VestibuleDemolition PlanBPES Vestibule Plans &ElevationsBPES Finish & SignagePlansSES Vestibule DemolitionPlanSES Vestibule Plans andElevationsRevision/Change:1. Detail A1/A050A: In the lower right-hand corner of VestibuleA100, there is a demo tag missing a number. The missingnumber is, “1”.2. Demo Legend, Note 4: ADD to the end of this note, “Installnew ceiling trim (to match existing) along perimeter ofexisting remaining ceiling at new/existing walls as requiredfor a finished ceiling system.”1. Detail A1/A110A: MODIFY the dimension of the overall widthof the window from 8’-7” to 8’-8”. The 13’-4” dimensionshown is to be maintained.2. Detail C1/A110A: MODIFY the dimension of the overall widthof the window from 8’-7” to 8’-8”. The 2’-8” dimension forthe transaction window is to be maintained. Modify the 2’-8”dimension on either side of the transaction window to be 2’-8 ½”.3. Detail C1/A110A: DELETE the waterfall on the solid surfaceshelf on the side closest to the transaction window only.4. Detail C4/A110A: for clarification purposes, the cmu wallshown below the new transaction window is existingconstruction.1. Finish Notes – Flooring: REPLACE note A to read, “A.Reference Finishes and Materials Schedule for WOMlocations identified under base and alternate bids, inconjunction with Alternate #3 description per Section012300. Description also identifies components to only beincluded in the alternate in addition to WOM.”REPLACE this sheet in its entirety with the attached revised sheet.REPLACE this sheet in its entirety with the attached revised sheet.REPLACE this sheet in its entirety with the attached revised sheet.REPLACE this sheet in its entirety with the attached revised sheet.1. Detail B5/A110C: For clarification, the dimension for theheight of the transaction window is 4’-6 ½”.2. Detail D3/A110C: DELETE the waterfall on the solid surfaceshelf on the side closest to the transaction window.3. Detail A1/A110C: Modify the 9’-6” dimension locating DoorC102 to read, “Existing door jamb location.”4. Detail B5/A110C: for clarification purposes, the cmu wallshown below the new transaction window is existingconstruction.A115CA050DA110DA115DA800S1.00BE001E101A1. Finish Notes – Flooring: ADD the following note, “J.Reference Finishes and Materials Schedule for WOMlocations identified under base and alternate bids, inconjunction with Alternate #3 description per SectionSES Finish & Signage012300. Description also identifies components to only bePlansincluded in the alternate in addition to WOM.”2. Finish Notes – Flooring: MODIFY note A to read, “Applyprimer to existing substrate as part of preparation to receivenew flooring finish in SRO C103 and Office C102. Seespecification section 099123 – Interior Painting.”1. Demo Legend – Key Value #1: MODIFY referenced detail toB4/A110D.AHS Vestibule2. Demo Legend – Key Value #4: ADD to the end of this note,Demolition Plan“Install new ceiling trim (to match existing) along perimeterof existing remaining ceiling at new/existing walls as requiredfor a finished ceiling system.”ASH Vestibule Plans & REPLACE this sheet in its entirety with the attached revised sheet.Elevations1. Detail A3/A115D: RELOCATE Sign “D” in Waiting D102 toexisting wall south of door frame.2. Detail A3/A115D: RELOCATE Sign “B1” in Vestibule D100 toexisting wall south of door frame.3. Finish Notes - Flooring: MODIFY note A to read, “Applyprimer to existing substrate as part of preparation to receivenew flooring finish in Waiting D102. See specification section099123 – Interior Painting.”AHS Finish & Signage4. Finish Notes – Flooring: ADD note “I” to read, “Unless notedPlansotherwise, all areas receiving resilient flooring (tile) and/orcarpet shall receive RB-1. See Finish Plans for notedexceptions.5. Finish Notes – Flooring: ADD the following note, “J.Reference Finishes and Materials Schedule for WOMlocations identified under base and alternate bids, inconjunction with Alternate #3 description per Section012300. Description also identifies components to only beincluded in the alternate in addition to WOM.”Door, Frame TypeREPLACE this sheet in its entirety with the attached revised sheet.Schedule & DetailsDetail 1 – Sheet Note Schedule: DELETE Mark 1.04 and itsFraming Plan and Details description. In addition, DELETE reference and frame shown on theframing plan.Electrical Notes &REPLACE this sheet in its entirety with the attached revised sheet,Legendsshowing:1. Added PB symbol to symbol legend.2. Added UL924 relay to symbol legend.First Floor Lighting Plan – REPLACE this sheet in its entirety with the attached revised sheet,East Gaston HSshowing added new exit sign and keynote #6.E101BE101CE101DE201AE201BE201CE201DE601T001T101AT101BT101CT101DM101AM101BM101CM501First Floor Lighting Plan – REPLACE this sheet in its entirety with the attached revised sheet,Bessemer Primaryshowing:1. (1) light fixture is now existing to remain.2. (1) new light fixture changed fixture type.First Floor Lighting Plan – REPLACE this sheet in its entirety with the attached revised sheet,Sherwood E.S.showing added new exit signFirst Floor Lighting Plan – REPLACE this sheet in its entirety with the attached revised sheet,Ashbrook HSshowing:1. Added existing exit sign/emergency fixture to plans.2. Added new emergency light fixture location.3. Added keynote #5.First Floor Power Plan – REPLACE this sheet in its entirety with the attached revised sheet,East Gaston HSshowing PB location and conduit requirements added.First Floor Power Plan – REPLACE this sheet in its entirety with the attached revised sheet,Bessemer Primaryshowing PB location and conduit requirements added.First Floor Power Plan – REPLACE this sheet in its entirety with the attached revised sheet,Sherwood ESshowing PB location and conduit requirements added.First Floor Power Plan – REPLACE this sheet in its entirety with the attached revised sheet,Ashbrook HSshowing PB location and conduit requirements added.Electrical DetailsREPLACE this sheet in its entirety with the attached revised sheet,showing fixture B30 added to lighting fixture schedule.Technology Notes &REPLACE this sheet in its entirety with the attached revised sheet,Legendsshowing added PB symbol to symbol legend.First FloorREPLACE this sheet in its entirety with the attached revised sheet,Network/Security – East showing added new panic button to new reception desk.Gaston HSFirst FloorREPLACE this sheet in its entirety with the attached revised sheet,Network/Security –showing added relocation of existing panic button to new receptionBessemer Primarydesk.First FloorREPLACE this sheet in its entirety with the attached revised sheet,Network/Security –showing added panic button to new reception desk.Sherwood E.S.First FloorREPLACE this sheet in its entirety with the attached revised sheet,Network/Security –showing added relocation of existing panic button to new receptionAshbrook HSdesk.First Floor Mechanical REPLACE this sheet in its entirety with the attached revised sheet,Plan – East Gaston HS showing an added note for patching existing roof.First Floor Mechanical REPLACE this sheet in its entirety with the attached revised sheet,Plan – Bessemer Primary showing an added note for patching existing roof.First Floor Mechanical REPLACE this sheet in its entirety with the attached revised sheet,Plan – Sherwood E.S. showing an added note for patching existing roof.Mechanical DetailsREPLACE this sheet in its entirety with the attached revised sheet,showing:1. An added note for new penetrations in existing roof todetails 4 and 5.2. Corrected details 4 and 5 to note existing roof.End of Addendum #1
- Commodity Codes
-
- NAICS 236220Commercial and Institutional Building Construction
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
RE-BID 3 IFB DS 26-01 Omega C...
RE-BID 3 IFB DS 26-01 ADVERTISEMENT FOR BIDS City of New Bern INVITATION
City of New Bern
Bid Due: 7/06/2026
Downing Creek Lift Station Im...
Bid Number: 26-1077 Bid Title: Downing Creek Lift Station Improvements Category: Construction Bids
City of Durham
Bid Due: 7/23/2026