RFQ: Deicer Trailer
Project Information
- Bid Title
- RFQ: Deicer Trailer
- Issuing Agency
- Birmingham Airport Authority
- Location
- Alabama
- Published Date
- Dec 3, 2025
- Closing Date
- Dec 29, 2025
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
RFQ: Deicer Trailer (12/03/2025)
- Attachment Preview
-
Request for QuotePull Behind Runway Deicer System06074845.1Birmingham Airport AuthorityDecember 2025I. The OpportunityPurpose:The Birmingham Airport Authority (the “Authority”) is requesting quotes for a new runway pullbehind deicer system.The purpose of this document (the “Request for Quotes” or “RFQ”) is to provide interestedvendors with the overview of the opportunity, as well as instructions on how to respond. Aprospective (“Proponent”) shall submit its quote (“Quote” or Quote Package”) in conformitywith the procedures and requirements set in this Request for Quotes.Scope:The vendor shall provide all equipment and services necessary to complete the following:Tank:• 1100 US gallons• Stainless steel• At least a 10-inch Quick fill lidPumping System:• 3-inch centrifugal pump• Remote starter switch (to allow system to be turned on from cab)• Allow load on and load off capability• Full 3-inch intake and 2-inch load sideLighting:• Amber LED strobe light at the highest possible mounting spot.• Each front corner of trailer must have an amber LED clearance light.• Each boom wing will have a dual-face (red/amber) clearance light mounted at end of theboom.• Each boom wing must have red LED marker lights• Back rack must have LED spotlights positioned to illuminate driver and passengerbooms.• Must have LED taillights including stop, tail, turn, and reverse lights.• Rear bumper must have red LED marker lights at each end of bumper• All lights MUST BE LED with no exceptions.06074845.12Boom System:• Manual rack option must be able to fold up and locked for transportation• Booms will be protected with a break-back clutch device that allows booms to breakback to prevent damage if they should hit an object.• Booms must return to normal position by their own weight when object is cleared.• Each boom to be equipped with an air-ride suspension system or equivalent system formanual boom rack option.• Casters must be installed at the end of each boom wing.• Boom swath shall be 50 ft.Spraying System:• Unit must have twin nozzle system, pencil stream and swirl-jet, in three sections -center, left boom, and right boom• Spray swath will be 50 feetRate Control System:• Control system senses ground speed, spray width (number of lanes), and material flowrate.• When a change in ground speed or spray width is detected, the control system changesthe material flow rate to maintain a constant, pre-selected application rate.• An increase in ground speed results in a proportional increase in the flow rate. Likewise,a decrease in ground speed results in a proportional decrease in the flow rate.• Must utilize GPS to monitor ground speed.• Control console must have a minimum of 25 ft. cable extension from trailer hitch toallow operation of control console from inside the tow vehicle.• Flow meter shall control the correct number of nozzles necessary to spray desired rate.Spray width:• Three sections• Operate individually or any combinationWarranty:• All parts are fully guaranteed for one year06074845.13Each quote submitted should include:1. Cost for freight to Birmingham Airport2. Specification per this RFQ3. Payment terms4. Availability and one year warranty5. Pricing must be valid for 90 daysII. Procedures and RequirementsPre-Submittal InquiresInquiries relative to this RFQ are only to be submitted in writing via e-mail tokhazelwood@flybhm.com no later than the date for “Written Inquiries Accepted Through” setforth in Exhibit 1 Request for quote schedule of the RFQ, which date is ten (10) business daysprior to the close of this RFQ (the “Quote Due Date”). Failure to follow this procedure mayresult in the Proponent being disqualified from participating in this RFQ process.The Authority representative(s) will attempt to answer all written questions received inadvance of the Written Inquiries Accepted Through date.The Authority will provide a summary of all questions and answers communicated in writingand any changes to the requirements of the Request for Quotes in an addendum to the RFQ.Any such addendum will be incorporated as part of the RFQ and will be posted online on theAirport website located at www.flybhm.com.Submittal Requirements:Each Proponent shall submit Quotation Package via email to Karen HazelwoodEmail: khazelwood@flybhm.com.06074845.14Selection Process/Criteria:Each Quote will be evaluated based on the following criteria:1. Cost delivered to Birmingham Airport2. Specifications per this RFQ3. One year Warranty4. AvailabilityGeneral Terms and Conditions1. The Authority reserves the right to:a. Add, delete and/or negotiate with a Proponent, an agreement containing differentand/or additional items or terms without reference to other Proponents or Quotes.b. Disqualify a Proponent in the event that, on the sole discretion of the Authority, itsQuote does not contain sufficient information to permit a thorough analysis.c. Verify the validity of the information supplied by a Proponent and reject any Quotewhere the contents appear to be incorrect or inaccurate in the Authority’s soledetermination.d. Accept Quotes in whole or in part.e. In its sole discretion, cancel this RFQ without award or compensation to anyProponent, its officers, directors, employees or agents.f. Reject any and all Quotes.g. Accept the Quote(s) which, the Authority, in its sole discretion, deems the mostadvantageous to the Authority; andh. Request any other information it requires to evaluate the submissions, and, in theevent of a Proponent’s failure to provide such information, reject such Proponent’sQuote.2. All financial information must be presented in U.S. dollars.3. The cost of preparing the Quote or providing additional information is the sole responsibilityof the Proponent. The Authority will not be responsible for or pay or reimburse any fees orexpenses to any Proponents or their agents.06074845.15
- Commodity Codes
-
- NAICS 336212Truck Trailer Manufacturing
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
VARIOUS TRAILERS, TILT BEDS, ...
BidsVARIOUS TRAILERS, TILT BEDS, ENCLOSED FLAT BED, AND 10-TON TILT TRAILER WITH AIR
City of Mobile
Bid Due: 7/10/2026
Purchase of One (1) New 2026 ...
Bid Number: WG26-37 Bid Title: Purchase of One (1) New 2026 Tahoe 2WD
Baldwin County
Bid Due: 7/13/2026