EBC Shipway and Pile Demolition
Project Information
- Bid Title
- EBC Shipway and Pile Demolition
- Issuing Agency
- Port of Tacoma
- Location
- Washington
- Published Date
- Feb 24, 2026
- Closing Date
- Mar 18, 2026
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- 012026-1016
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
EBC Shipway and Pile Demolition
Bid Number:
012026-1016
Procurement Summary:
The Port of Tacoma (Port) is soliciting Statements of Qualifications (SOQ) from firms interested in providing consultant services for the design, permitting and construction support associated with the demolition of the remaining shipway and piling at the EBC. This work will include the coastal engineering to ensure the stability of the resultant low gradient shoreline. The anticipated period of performance of the contract is approximately three (3) years from the execution of the contract.
Contact:
Notes:
No Site Visit
Bids Due:
Wed, 03/18/2026 - 02:00PM
Questions Due:
Wed, 03/11/2026 - 02:00PM - Attachment Preview
-
PORT OF TACOMA (PORT)REQUEST FOR QUALILFICATION (RFQ)PROCUREMENT NO. 102026-1016PROJECT NO. 102018EARLEY BUSINESS CENTER (EBC) SHIPWAYAND PILE DEMOLITIONIssued byPort of TacomaOne Sitcum PlazaP.O. Box 1837Tacoma, WA 98401-1837RFQ INFORMATIONContact:Michelle Walker, Procurement AnalystEmail Addresses:procurement@portoftacoma.comPhone:(253) 888-4744Submittal Date:March 18, 2026 @ 2:00 PMQuestions Due Date:March 11, 2026 @ 2:00 PMSite Visit Date:NoneSUBMIT ALL QUESTIONS AND SOQS VIA THE PROCUREMENT PORTAL.(LINK LOCATED ON THE LEFT SIDE OF THE PROCUREMENT WEB PAGE)RFQ102026-1016-EBC Shipway and Pile DemolitionPage 1 of 23PortRFQ 102026-1016A. PURPOSEEBC Shipway and Pile DemolitionThe Port of Tacoma (Port) is soliciting Statements of Qualifications (SOQ) from firmsinterested in providing consultant services for the design, permitting and constructionsupport associated with the demolition of the remaining shipway and piling at the EBC.This work will include the coastal engineering to ensure the stability of the resultant lowgradient shoreline. The anticipated period of performance of the contract is approximatelythree (3) years from the execution of the contract.B. INTERLOCAL COOPERATION ACTRCW 39.34 allows cooperative purchasing between public agencies, and other politicalsubdivisions. If a public agency files or has filed an Intergovernmental CooperativePurchasing Agreement with the Port, those agencies are eligible to purchase fromContracts established by the Port. Such agencies may ask Port Contractors to acceptorders from the agency, citing the Port contract as the basis for the order. The Contractormay accept or decline such orders. If the Contractor accepts an order from another publicagency using the Port contract as the basis, the Contractor agrees to sell additional itemsat the contract prices, terms, and conditions. The Port accepts no responsibility for thepayment of the purchase price by other governmental agencies.C. BACKGROUNDCreated by Pierce County citizens in 1918, the Port is a major center for container cargo,bulk, break-bulk, autos and heavy-lift cargo. To learn more about the Port, visitwww.portoftacoma.com.D. TERMS & CONDITIONSThe Port’s Standard Terms and Conditions are included with the SampleProfessional Services Agreement (Contract) (Attachment B) to this RFQ. Bysubmitting a SOQ, the Proposer represents that it has carefully read and agrees tobe bound by the Port’s Standard Terms and Conditions. Identify during thequestion submittal and response period, any sections you consider onerous,clarify why you consider these sections onerous, propose alternative language anddescribe why it is in the Port’s best interests to adopt the alternative language.SOQs submitted with altered or conditioned Terms and Conditions without priorwritten agreement from the Port will be considered non-responsive and notconsidered for evaluation.RFQ102026-1016-EBC Shipway and Pile DemolitionPage 2 of 23Proposers submitting SOQs understand all contract terms and conditions aremandatory and are an acceptance of the Contract without exception. The Portreserves the right to negotiate changes to submitted SOQs and to change thePort's otherwise mandatory Contract form during negotiations. If the Proposer isawarded a contract and refuses to sign the attached Contract form, the Port mayreject the Proposer from this and future solicitations for the same work. Under nocircumstances shall the Proposer submit its own terms and conditions.E. SCOPE OF SERVICESThe work may include, but is not limited to, the following tasks:1. Site assessment and review of existing information including geotechnicalinformation, drawings and other documents and available site information.2. Coastal Engineering Analysis and Reporting including:a. Wind and wave analysis and modeling to assess wave attenuationprovided by the existing pile field and potential impacts that may occur tothe shoreline from the removal of the pile field.b. Hydrodynamic analysis and modelingc. Sediment transport analysis and modeling3. Agency Coordination including City, State and Federal Agencies4. Site investigation including:a. Sediment analysis associated with characterization of shoreline soilcompositionb. Benthic habitat investigation and mapping5. Preparation of bid documents including plans and specifications for the removalof the shipway and ~ 13,000 wood pilinga. 50%, 90% and 100% document sets are anticipatedb. Associated reports and studies necessary for permitting, bidding anddisposal6. Permitting support7. Bidding and construction support8. Record drawing and completion reporting as may be required by the variouspermits9. Other tasks associated with standard civil and coastal engineering that may benecessary to complete the design and preparation of the documents.F. DELIVERABLESReports and Studies that are the product of the site assessment, analysis and modelingProject Documents including plans and specifications at 50%, 90%, Bid ready (100%)and Record DrawingsPermit packages as may be requiredRFQ102026-1016-EBC Shipway and Pile DemolitionPage 3 of 23G. QUALIFICATIONSSubmitting firms must be licensed in their respective fields in the State of Washington andhave a minimum of five (5) years of experience.H. SOQ ELEMENTS & EVALUATION CRITERIASOQs should present information in a straightforward and concise manner, whileensuring complete and detailed descriptions of the firm (to include the prime, key teammembers, and major sub-consultants) and the team’s ability to meet the requirementsand provide the requested services of this RFQ. Emphasis will be on completeness ofcontent. The written SOQs should be prepared in the same sequential order as outlinedbelow.SOQs are limited to 8 numbered pages (8 ½ by 11 inch) excluding the cover letter andall appendices. All pages shall be in portrait orientation with 1-inch (1”) margins. Font sizeshall be 10 point or larger. SOQs that do not follow this format may be rejected. Submittalsneed to be limited to 9 MB in total size.The cover letter shall include the RFQ Number & Title in the subject line, and the Name,Title, Email Address, Phone Number, and current Address of the submitting team. SOQ’sthat do not follow this format may be rejected. The cover letter shall include thefollowing information (even if the answer is None):• Describe any claim submitted by any client against the prime firm within thepast two (2) years related to the professional services provided by the firmor its key personnel. For purposes of this request, claim means a sum ofmoney in dispute in excess of 10% of the firm’s fee for the services provided.• Any real or perceived conflicts of interest for team members, inclusive of theprime, sub-consultants, and key team members.SOQs are to address criteria #1 (Qualifications and Experience) and criteria #2 (ProjectApproach Narrative) in the Initial Evaluation Phase. Format your SOQ in the orderpresented here with headings for each lettered item (a, b, c, etc.) outlined below:INITIAL EVALUATION PHASE1. Qualifications & Experience50 PTSa) Identify the proposed team (to include working titles, degrees, certificates andlicenses), demonstrate the team’s experience in performing the requested servicesand describe how the team meets or exceeds the required qualifications. (25 PTS)• Attach Certificates & Licenses for business.• Resumes of the key individuals may be included as an appendix and are notincluded in the total page count. Resumes are to be limited to one (1) single-sided, letter-size page. Resumes exceeding this limit will not be reviewed.• Provide an organizational chart demonstrating the relationships and hierarchyof the team described above and availability to support the Port project. Identifyindividuals by name, position, discipline and firm. Identify key back uppersonnel.RFQ102026-1016-EBC Shipway and Pile DemolitionPage 4 of 23b) Capacity to perform the work (including any specialized services) within the timeconstraints identified, considering the firm’s current and planned workload. (5 PTS)c) Include a list of three (3) recent non-Port contracts/projects in the last five (5) years,to include a point of contact, contact information (phone and email), and briefdescription, for services relevant to the items listed in the Scope of Services asperformed by the key personnel. Only projects completed by key members of theproject team will be considered. (20 PTS)2. Project Approach Narrative50 PTSSOQs should clearly outline the team’s recommended approach and methodology for:a) Accomplishing the Scope of Services. Clearly describe the approaches and methodsthat will be used to accomplish the tasks required in the Scope of Services. Include asummary of innovative ideas and suggestions for enhancing the scope of services.(25 PTS)• Project Management: Describe how the team will manage and coordinate thenecessary disciplines required to accomplish the services requested.• Describe the team’s experience responding to and overall management of theContract and describe the firm’s approach for responding to the Port’s request forservices.b) Provide approach for scheduling and sequencing of tasks and facilitating efficient andconsistent progress on each task. (10 PTS)• General information for supporting the Port with an overall approach to consultantservices at the Port.c) Coordination & Communication. Provide a plan for communications and coordinationbetween the Project Team, the Port’s Project Manager, and the various Stakeholders.(5 PTS)d) Quality Control (QC) and Quality Assurance (QA) program for the requested services.(5 PTS)e) What risks beyond your control do you see in providing this service, and how wouldyou mitigate them? (5 PTS)FINAL EVALUATION PHASE (if applicable)1. Oral Presentations (if requested) ............................................................... 100 PTSOral Presentations may be conducted with the top-ranked SOQs. Failure to participatein the process will result in the firm’s disqualification from further consideration. OralPresentations will be conducted by online video meeting.2. References (if requested)...........................................................................Pass/FailReference checks may be performed on the selected firm, if based directly on theSOQ’s received, or on shortlisted firms if Oral Presentations are being requested. ThePort may evaluate the reference checks to assess the proposed firm’s overallperformance and success of previous, similar work. Reference checks may also beutilized to validate information contained in the SOQ.RFQ102026-1016-EBC Shipway and Pile DemolitionPage 5 of 23
- Commodity Codes
-
- NAICS 237990Other Heavy and Civil Engineering Construction
- NAICS 238910Site Preparation Contractors
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Tumwater RHQ - Building Demol...
Contract Tumwater RHQ - Building Demolition - OR Contract summary Provides the improvements
State Government of Washington
Bid Due: 7/22/2026
Tumwater RHQ - Building Demol...
Solicitation Close Date: 07/22/26 Title: Tumwater RHQ - Building Demolition - OR Ref
State Government of Washington
Bid Due: 7/22/2026