Addendum 2: On-Call Stormwater Engineering Services
Project Information
- Bid Title
- Addendum 2: On-Call Stormwater Engineering Services
- Issuing Agency
- City of Monroe
- Location
- North Carolina
- Published Date
- Feb 25, 2026
- Closing Date
- Mar 10, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
- Addendum 2: On-Call Stormwater Engineering Services (PDF)
- Attachment Preview
-
Request for QualificationsRequest for Qualifications (RFQ)On-Call Stormwater Engineering ServicesAddendum No. 2Issued: February 25, 2026Responses Due March 10, 2026 by 4:00 P.M.1|PageRequest for QualificationsADDENDUM NO. 2The attention of each firm is called to the following clarifications, additions to, and/or changes inthe Request for Qualifications dated February 9, 2026. Responding Offerors are notified that thisAddendum is made part of and incorporated in the original RFQ document.QUESTIONS/ANSWERSBelow are questions received from potential firms responding to the RFQ, with the City’s responseshown in bold italics:1. Are attachments allowed? If so, do they count toward the 18-page limit? Attachments arenot allowed; please follow the qualification package outline described on page 6.2. If we do not use the allotted page limits outlined in the qualifications package, can thosepages be allocated to other sections? please follow the qualification package outlined onpage 6, which is preferred to maintain consistency along all submittals.3. Is the scope of “5. Regulatory Compliance & Permitting” specific to stormwaterinfrastructure projects only, or does it also include MS4 permit compliance (in addition to “2.Asset Management & Planning” and “7. Post-Construction & Maintenance Planning”)? Theintent of Item 5 is for permitting and regulatory compliance required as part of design andconstruction document development of infrastructure projects. See further clarificationsbelow.4. Are covers and tables of contents included in the page count? No; a front cover sheet, aback cover sheet, and a Table of Contents page may be excluded from the page count.5. Does 18 pages mean 9 sheets of paper, printed double-sided to yield 18 pages. Or, does itmean 18 sheets of paper, printed double-sided, yielding 36 pages? There should be nomore than 18 pages of content, meeting the outline described on page 6. Pages may besingle or double sided.6. For clarification, is the 12-point font requirement mandatory, or would a legible 10-point fontbe acceptable? To maintain consistency along all submittals, 12-point font is required.7. Does the City maintain a current stormwater database, and if so, can bidding consultantsreceive a copy of the stormwater database and/or the stormwater database shell? We’dlike to better understand the stormwater assets (inlets, manholes, pipes, SCM facilities) andthe asset attribution that must be collected and edited. The City manages a currentstormwater database within ESRI ArcGIS, and there are 604,356.78 feet of pipe, 9,221drainage structures, and 329 SCMs mapped (public and private). At this time the databaseis not available for distribution, but may be provided to a selected firm within a definedscope of work at a future date.8. Can the consultant edit the stormwater database offline and submit the database to theCity? The database may be provided to a selected firm within a defined scope of work.9. What is the GIS deliverable format for the stormwater inventory and condition assessment(file geodatabase)? Any data provided back in a file geodatabase projected into NC StatePlane.10. Does the City maintain an ArcGIS Online (AGOL) environment? What version of ArcGIS is theCity utilizing? The city’s current environment is an enterprise geodatabase, ArcMap version10.8, Portal version 10.8, and ArcGIS online environment. We also are utilizing ArcPro 3.52|PageRequest for Qualifications11. Can the City provide its CAD/GIS standards? The city can work with any data provided in afile geodatabase projected into NC State Plane.CLARIFICATIONS1) Item 5 (pg. 3) Regulatory Compliance & Permitting – The statement, “Support reportingrequirements for stormwater programs”, is intended to request general advisory support formanaging the stormwater program. All implementation and ongoing management of thestormwater MS4 permit will be performed by City staff.3|Page
- Commodity Codes
-
- NAICS 541330Engineering Services
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Operational Readiness & Susta...
Follow Operational Readiness & Sustainment Services Active Contract Opportunity Notice ID H92257-26-R-SW05 Related
Federal Agency
Bid Due: 7/10/2026
Solicitation Number: Doc2243352308 Project Title: Third-Party Software RFI Description: Request for information about
State Government of North Carolina
Bid Due: 7/24/2026