MALLORY SWAMP #2 TIMBER SALE
Project Information
- Bid Title
- MALLORY SWAMP #2 TIMBER SALE
- Issuing Agency
- Suwannee River Water Management District
- Location
- Florida
- Published Date
- Feb 25, 2026
- Closing Date
- Mar 11, 2026
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- 25/26-009 OPS
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Bid Number: 25/26-009 OPS
Bid Title: MALLORY SWAMP #2 TIMBER SALE
Category: Bids, Proposals and Qualifications Status: Open Description: 420 acres
Timber Type and Age:
75 acres – 1997 planted slash pine
345 acres – 2003 planted slash pine
Type of Harvest:
This sale is an unmarked seed tree harvest of 1997 and 2003 planted slash pine on the Mallory Swamp Tract in Lafayette County, Florida. The purchaser will leave 10 trees per acre of the largest, best formed pine trees in the residual stand. This equates to approximately 66 feet by 66 feet of spacing of the residual trees. The logging slash will be scattered back through the stand. Long skid distances may be necessary due to the area’s natural hydrologic conditions.
Publication Date/Time: 2/25/2026 9:00 AM Closing Date/Time: 3/11/2026 11:00 AM Submittal Information: SUBMIT ELECTRONICALLY THROUGH DEMANDSTAR Bid Opening Information: ELECTRONIC BID OPENING Contact Person: SHARON HINGSON Business Hours: MONDAY - FRIDAY 8:00 - 5:00 Related Documents: - Attachment Preview
-
DISTRICT ITB 25/26-009 OPSINVITATION TO BID 25/26-009 OPSMALLORY SWAMP #2 TIMBER SALESuwannee River Water Management District (District or Owner) invites you to participate in thebidding process for timber on the property as described below:Tract Name & Sale #:Owner:County/State:Section/Township/Range:Acreage (approximate):Timber Type and Age:Type of Harvest:Access and Boundaries:MALLORY SWAMP #2 TIMBER SALESuwannee River Water Management DistrictLafayette County, FloridaParts of Sections 21,22,27,28,33 & 34, T 7 South, R 12 East420 acres75 acres – 1997 planted slash pine345 acres – 2003 planted slash pineThis sale is an unmarked seed tree harvest of 1997 and2003 planted slash pine on the Mallory Swamp Tract inLafayette County, Florida. The purchaser will leave 10 treesper acre of the largest, best formed pine trees in theresidual stand. This equates to approximately 66 feet by 66feet of spacing of the residual trees. The logging slash willbe scattered back through the stand. Long skid distancesmay be necessary due to the area’s natural hydrologicconditions. The DISTRICT PROJECT MANAGER willroutinely make an assessment of the timber harvest toensure the objectives are being met.The timber sale area can be inspected at the bidder'sconvenience and can be accessed from Beehive, Tar Bucket,and Deserter’s Hammock roads in the southwest corner of theMallory Swamp Tract in Lafayette County, Florida. Theharvest boundaries utilize roads and natural stand breaks andare shown on the map.Gate Combinations are 1-0-0-1.Contract Information:PURCHASER will be responsible for roads and roadmaintenance during the harvest. This may requiregrading and filling holes with clean fill or limerock asapproved by the District. The secondary roads 55-112band 55-114b are in very poor condition and will requirework for harvesting. Bidders must submit a price per tonfor delivered and spread mined limerock base and chunkproducts needed to access timber and maintain roads forharvesting purposes. The Purchaser will be responsiblefor delivering and spreading the limerock products aspre-approved by the District Project Manager. THE COSTWILL BE DEDUCTED FROM THE WEEKLY TIMBERSETTLEMENT PAYMENTS. The District estimates 500tons of limerock chunk (3”-8” diameter) and 200 tons oflimerock base may be needed to complete the harvest.The District will not approve payment of more than 700tons of limerock products. Any additional road materialneeds will be the responsibility of the PURCHASER at thePURCHASER’S expense.Per Unit Rates pay as cut sale for pine timberPer Unit cost as spread for limerock based fill road fill materialContract Length – 12 monthsDISTRICT ITB 25/26-009 OPSNotice of Timber for Sale – Mallory Swamp #2Bid #:Bid Opening Date &Time:LOCATION:Advance Payment - $20,000Damage Deposit - $10,000ITB 25/26-009 OPS*March 11, 2026; 11:00 AM9225 CR 49Live Oak, Florida 32060*Denotes a public meeting. All times denote Eastern Daylight Time (EDT).Only bids made on the enclosed Timber Sale Bid Form will be accepted. The Form must be filledout completely to be considered.DELIVERY OF BID:Submit Bids Electronically through DemandStar.https://www.demandstar.com/app/agencies/florida/suwannee-river-water-management-district/procurementFor articles and videos to assist you through the DemandStar registry and uploading ofdocuments visit the DemandStar business support page at -https://network.demandstar.com/business-support/If you are unfamiliar with DemandStar, please submit your bid far enough in advance towork through any complications you may have with the system.Bids are to be uploaded to the platform prior to 11:00 a.m. on March 11, 2026. Bids receivedafter this time, for any reason, will be rejected.WINNING BIDDER: The District will not advertise estimated harvest volumes prior to the bidopening. All bidders should satisfy themselves as to the quantity and quality of timber offered inthis sale and roadwork necessary for access before bidding. Bid comparisons will be made usingthe total sale value as determined by the District’s estimated timber product volumes and estimatedroad material volumes during the bid opening. The bidder with the highest total sale value aftersubtracting the estimated road material costs from the timber revenue will be the recommendedbidder. The bidders will be notified of the bid calculations by March 11, 2026. At that time, arecommendation will be prepared for the Executive Director requesting authorization to enter into acontract. The winning bidder will be expected to enter into a firm contract within 10 days of awardof bid.RIGHT OF REFUSAL: The right to refuse any and all bids is reserved.PRE-BID ACCESS: The timber sale area can be inspected at the bidder's convenience and canbe accessed from Beehive, Tar Bucket, and Deserter’s Hammock roads in the southwest corner ofthe Mallory Swamp Tract in Lafayette County, Florida. The harvest boundaries utilize roads andnatural stand breaks and are shown on the map.Gate Combinations are 1-0-0-1.BUYER RESPONSIBILITIES: The Buyer will pay for any documentary stamps or surtax requiredfor the sale.TIMBER CONTRACT: Prospective bidders are advised that the District will provide the contractfor the purchase of this timber. The term of this Timber Contract shall be 12 months fromDISTRICT ITB 25/26-009 OPSNotice of Timber for Sale – Mallory Swamp #2contract execution. Draft contracts are available for review from the District.SUMMARIZED TERMS OF THE TIMBER CONTRACT ARE AS FOLLOWS:1. HARVEST PLAN: This sale is an unmarked seed tree harvest of 1997 and 2003 plantedslash pine on the Mallory Swamp Tract in Lafayette County, Florida. The purchaser willleave 10 trees per acre of the largest, best formed pine trees in the residual stand. Thisequates to approximately 66 feet by 66 feet of spacing of the residual trees. The loggingslash will be scattered back through the stand. Long skid distances may be necessarydue to the area’s natural hydrologic conditions. The DISTRICT PROJECT MANAGER willroutinely make an assessment of the timber harvest to ensure the objectives are beingmet.2. SPECIES OF TIMBER SOLD: Slash Pine.3. PRE-HARVEST MEETING: Prior to the harvest operation, a pre-harvest meeting withthe successful bidder and his logger will be held. This is a mandatory meeting, andlogging will not commence until this meeting takes place. This meeting will cover theHarvest Plan, “Come clean, Leave clean practices, BMP’s, logging decks, productutilization, ecological concerns, aesthetics, timber security, and other pertinent issues.4. TIMBER SALE OVERSIGHT: PURCHASER shall report the commencement, and anyinterruption, recommencement, or completion of harvest operations by telephone or e-mailto the DISTRICT PROJECT MANAGER at least twenty-four (24) hours prior to such. TheDISTRICT PROJECT MANAGER will routinely make an assessment of the timberharvest to ensure the objectives are being met. The District reserves the right to stopharvesting if the logging crew does not comply with harvest plans as interpreted by theDISTRICT PROJECT MANAGER. Failure to follow the Harvest Plan may result in theremoval of the logging crew by the District.5. PRODUCT UTILIZATION: PURCHASER shall harvest and fully use, to the extentpracticable, all trees conveyed in this offering. All timber shall be measured in tons (oneton equals 2,000 pounds).6. TITLE TO TIMBER: Title to the timber shall pass from OWNER to PURCHASER whenthe tree has been severed from the stump.7. PAYMENTS: Advance Payment of $20,000 from PURCHASER is required under thisContract at closing. Weekly settlements will be calculated in this manner: Credits will bemade against the Advance Payment at 100% of the weekly gross harvest. When theAdvance Payment is fully utilized, PURCHASER shall make payments to OWNER.8. DAMAGE/SECURITY DEPOSIT: PURCHASER shall deposit $10,000 with OWNER,which amount shall be held by OWNER in escrow without interest, as a damage andsecurity deposit to assure fulfillment by PURCHASER of PURCHASER'S obligations.9. ROAD RESPONSIBILITIES: PURCHASER will be responsible for roads and roadmaintenance during the harvest. This may require grading and filling holes withclean fill or limerock as approved by the District. The secondary roads 55-112band 55-114b are in very poor condition and will require work for harvesting.Bidders must submit a price per ton for delivered and spread mined limerock baseand chunk products needed to access timber and maintain roads for harvestingDISTRICT ITB 25/26-009 OPSNotice of Timber for Sale – Mallory Swamp #2purposes. The Purchaser will be responsible for delivering and spreading thelimerock products as pre-approved by the District Project Manager. THE COST WILLBE DEDUCTED FROM THE WEEKLY TIMBER SETTLEMENT PAYMENTS. TheDistrict estimates 500 tons of limerock chunk (3”-8” diameter) and 200 tons oflimerock base may be needed to complete the harvest. The District will not approvepayment of more than 700 tons of limerock products. Any additional road materialneeds will be the responsibility of the PURCHASER at the PURCHASER’S expense.Haul routes and road conditions can be inspected at the bidder's convenience. The salearea can be accessed directly as shown on the attached map. PURCHASER will returnthe roads to their pre-harvest condition or better upon completion of harvest atPURCHASER’S expense.10. MASTER LOGGER: The logger harvesting the timber must be a Master Logger withcurrent designation. The Master Logger must be routinely available on-site duringoperations.ADDITIONAL INFORMATIONBEST MANAGEMENT PRACTICES, LISTED SPECIES, AND OTHER ITEMS:a) PURCHASER hereby agrees to use good forestry practices and further agrees to abide byBest Management Practices (BMP's) as outlined in the Florida Forest Service publication,Silviculture Best Management Practices, as well as other requirements of the State ofFlorida. PURCHASER shall have up to thirty (30) days after the expiration of this Contract,but no more than forty-five (45) days, after the completion of all logging (whichever date isearlier) to bring the tract into full compliance with all the terms of this Contract, including thecompletion of necessary BMP work. OWNER may, at its discretion, extend this period oftime due to excessive wet weather conditions. Damages arising out of the failure to exerciseBMP's shall be limited to the expenses incurred by any party which carries out remedialmeasures reasonably required to bring the site in question into compliance with theapplicable BMP's as set out above.b) Come Clean, Leave Clean: Non-native, invasive plant infestations are found throughout theUnited States. PURCHASER may unknowingly import noxious plant material from outsideareas or take plant material off the OWNER’s property and infest other locales. All roadmaterials and equipment used on the OWNER’s property, including road maintenanceequipment, timber harvest equipment, site preparation equipment, ATVs, or trucks, must befree of invasive plant material before entering District lands. OWNER’s PROJECTMANAGERs are required to inspect each piece of equipment before or during operations onthe OWNER’s property. If PURCHASER is to perform work within 30 yards of a non-native,invasive-plant infestation, the OWNER’s representative is required to inspect the equipmentbefore it leaves the OWNER’s property. The District will designate cleaning areas on eachtract for PURCHASER to clean their equipment, if necessary; the OWNER is responsible formonitoring the cleaning areas for new infestations.c) Ecological Issues: OWNER has no knowledge of the presence of threatened, endangeredand protected species on the area on which the Timber is located, or over whichPURCHASER must transport the Timber, or OWNER has indicated to PURCHASER thepresence and location of said species to the best of OWNER’s knowledge as shown on the“Project Map”. OWNER does not warrant that such threatened, endangered, or protectedspecies are not present, and PURCHASER is advised that nothing in this Contract relievesDISTRICT ITB 25/26-009 OPSNotice of Timber for Sale – Mallory Swamp #2PURCHASER of its responsibility to act within the law should the presence of suchthreatened, endangered, or protected species become known to PURCHASER or to anyother party who advises PURCHASER of the presence of such species. (“…to theknowledge of OWNER…” shall only include to the knowledge of Steve Carpenter or aspecified DISTRICT PROJECT MANAGER). PURCHASER AND PURCHASER’s LOGGERshall use caution and shall avoid running over gopher tortoises or gopher tortoise burrowsencountered on the tract or as shown on the map. OWNER may flag out areas with rarespecies and remove the area(s) from the sale area if these species are found during harvestoperations.d) Equipment Fluids: PURCHASER must follow all local, state and federal regulations as theyrelate to fluids, chemicals, oils, lubrications, their containers, and other equipment wastes;wash and service equipment away from any area that may create a water quality hazardfollowing Florida Silviculture BMPs; clean up and contain fuel and oil spills immediately;comply with state and federal regulations when reporting spills (discharges); and report anyfuel, oil, chemical or hazardous waste discharge to the DISTRICT PROJECT MANAGERimmediately. Discharges must be reported by the PURCHASER in less than 24 hours to theFlorida Department of Environmental Protection (DEP) State Warning Point (800-320-0519).If the discharge threatens or enters waters of the State, the PURCHASER must notify theNational Response Center (800-424-8802) within 1 hour of the discharge. Within 7 days thePURCHASER must submit the required Discharge Report Form to DEP Bureau ofEmergency Response. Under Florida Law and Federal Law PURCHASER may be subjectto penalties because of the discharge itself and if the PURCHASER fails to report thedischarge. PURCHASER will be responsible for all requirements and costs associated withthe cleanup of discharged pollutants or other hazardous chemicals.e) Recreation Concerns: PURCHASER hereby acknowledges and understands that publicrecreation may occur during the harvest, and public safety will take precedence over allharvest operations. PURCHASER will maintain and secure equipment when not operating.During operations, PURCHASER will maintain a safe distance from the general public at alltimes. Harvest equipment, vehicles, and personnel will not damage or unnecessary blockaccess to roads, trails, or District facilities. Lands titled to the District are managed under amultiple-use policy that emphasizes water resource protection, maintenance, and restorationof the land’s natural state and condition, and provisions for public access and recreationwithin those lands. District lands will remain open to the general public during operationsunless otherwise indicated by the District in writing.KEY POINTSChallenge of Solicitation Process: If a potential Bidder protests any provisions of this ITB, anotice of intent to protest shall be filed with the District in writing within 72 hours after the postingof the invitation to bid on the District’s website. “Failure to file a protest within the timeprescribed in Section 120.57(3) Florida Statutes shall constitute a waiver of proceedingsunder Chapter 120 of Florida Statutes.”Challenge of District’s Intent to Award Contract: If a Bidder intends to protest District’s intent toaward a contract, the notice of intent to protest must be filed in writing within 72 hours afterposting of a notice of intent to award a contract and the Bidder shall file a formal written protestwithin ten (10) days after filing a notice of intent to protest. Any Bidder who files a formal writtenprotest pursuant to Chapter 28-110, Florida Administrative Code, and Section 120.57(3), Florida
- Commodity Codes
-
- NAICS 113310Logging
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
ITB; Hurricane Ivan Tree Removal
Description: ITB; Hurricane Ivan Tree Removal Bid Number: PD 04-05.33 Addendum: AD 04-05.33
Escambia County
Bid Due: 4/05/2033
Districtwide Contamination As...
Advertisement Detail Department of Transportation Informational Notice Districtwide Contamination Assessment and Remediation Advertisement
State Government of Florida
Bid Due: 10/11/2040