6567 Bid - THS PARKING EXPANSION AND CIRCULATION DESIGN PHASE 1
Project Information
- Bid Title
- 6567 Bid - THS PARKING EXPANSION AND CIRCULATION DESIGN PHASE 1
- Issuing Agency
- Trumbull town
- Location
- Connecticut
- Published Date
- Mar 26, 2026
- Closing Date
- Apr 15, 2026
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- 6567
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Bid Number: 6567
Bid Title: 6567 Bid - THS PARKING EXPANSION AND CIRCULATION DESIGN PHASE 1
Category: Bid Invitations Status: Open Publication Date/Time: 3/26/2026 12:00 AM Closing Date/Time: 4/15/2026 2:00 PM Related Documents: - Attachment Preview
-
TRUMBULL HIGH SCHOOLPARKING EXPANSION AND CIRCULATION DESIGN PHASE 1GENERAL SPECIFICATIONSTOWN OF TRUMBULL, CONNECTICUTGENERAL SPECIFICATIONS INDEXARTICLE1.2.3.4.5.6.7.8.9.10.11.12.13.14.15.16.17.18.19.20.21.22.23.24.25.26.27.28.29.30.31.32.33.34.35.TITLEIndexBidsObligations Of BiddersContract DocumentsDirector of Public WorksTown EngineerContractorSub-ContractorNoticeTime Is Of The EssenceCommencement Of WorkBlank Form For BidWorking Hours And HolidaysPerformance &Guarantee Maintenance BondAdditional Or Substitute BondPower Of AttorneyQualifications For EmploymentPayment Of EmployeesDeleteAccident PreventionInspectionPaymentsGeneral SpecificationsInspection And TestsCost And TestsProtection Of Work And PropertyPower Of Contractor To Act In An EmergencyCertificate Of CompletionFinal PaymentAcceptance Of Final Payment Constitutes ReleaseSub-Surface StructuresSub-Surface ConditionsContractor's Title To MaterialsSuperintendence By ContractorRepresentations Of ContractorsPatent RightPAGE1-23344444455566777778888991010101010101111111112Trumbull High School1Parking Expansion And Circulation Design Phase 1General SpecificationsGENERAL SPECIFICATIONS INDEXARTICLE36.37.38.39.40.41.42.43.44.45.46.47.48.49.50.51.52.53.54.55.56.57.58.59.60.61.62.63.64.65.66.67.68.69.70.71.72.73.TITLEPAGEPermits And Regulations12Correction Of Work12Statement Showing Amount Due For Wages, Material and Supplies 13Town Right to Withhold Payments13Town Right To Stop Work Or Terminate Contract13Uses Of Premises And Removal Of Debris15All Work Subject To Control Of The Engineer16Town Engineer, Control Not Limited16Provisions Required By Law Deemed Inserted16Subletting, Successor And Assigns17Definitions17Abbreviations17Handling And Distribution18Materials18Watchman19Maintenance Of Traffic19Driveways And Property Entrances20Dust20Preservation Of Trees20Inspection Of Work Away From The Site20Contractor's Shop And Working Drawings20Occupying Private Land22Interference With And Protection of Streets22Storage Of Materials And Equipment22Insufficiency Of Safety Precautions22Sanitary Regulations23Delete23Dimensions Of Existing Structures23Work To Conform23Computations of Quantities23Planning and Progress Schedules24Precautions During Adverse Weather24As-Built Drawings24Scope of Work24Field Office26Coordination Plans/Specifications26No Payment26Noise27Trumbull High School2Parking Expansion And Circulation Design Phase 1General SpecificationsTOWN OF TRUMBULL, CONNECTICUTGENERAL SPECIFICATIONS1. BIDS:Bids, as stated in the "Bid Sheet", will be compared on the basis of the sum of thequantities multiplied by respective unit prices, added to lump-sum prices.In the event that there is a discrepancy in the bid sheet between the lump-sum or unitprices written in words and figures, the prices written in words shall govern.The Town agrees to examine and consider each bid submitted in consideration of theBidder`s Agreements, as hereinabove set forth in the Bid Sheet.NOTE: Any/all reference to "he/him" shall be taken to mean "his/her/its".2. OBLIGATION OF BIDDERS:At the time of opening of bids, each bidder shall be presumed to have inspected the sites,and to have read and made himself thoroughly familiar with the Plans and ContractDocuments including all addenda. The failure or omission of any bidder to receive orexamine any form, instrument or document shall in no way relieve any bidder from anyobligation in respect to his bid.Each bidder must fully inform himself of the construction and labor conditions relating tothe work which is now or will be performed. Failure to do so will not relieve thesuccessful bidder of his obligation to furnish all labor and materials necessary to carry outthe provisions of the contract documents and to complete the contemplated work.Inasmuch as possible, the contractor must, in carrying out his work, employ suchmethods or means as will not cause any interruptions or interference with the work of anyother contractor.The successful bidder must furnish a field and office organization chart and equipmentlist to be used on the job to demonstrate that he has the capability to perform the workprescribed for this project and shall furnish the Town all other information and datarequested on the form provided for this purpose; such submission to be made prior toconstruction startup.The Contractor shall supply a foreman full time on the job. Such foreman must besatisfactory to the Town of Trumbull. Failure to comply shall be cause for breach ofcontract.The Contractor's normal sequence of operation in performing the work under the terms ofthis contract shall be varied at the direction of the Town of Trumbull, so that prioritiescan be given in critical areas such as schedule, right-of-way, clearance and other Towncommitments, either present or future.The Contractor shall file an appeal to the Public Works Director if the sequence ofoperation in performing the work is varied by the Town in a manner that is unacceptableto him. The Contractor shall have no claim against the Town for damages or extraTrumbull High School3Parking Expansion And Circulation Design Phase 1General Specificationscompensation on account of delays in execution of the work or delays in making theconstruction site available to the Contractor.3. CONTRACT DOCUMENTS:Whenever the term "Contract Documents" is used herein, it shall include the Agreement,Information to Bidders, General Specifications, Bid Documents, TechnicalSpecifications, Special Notes, Addenda, and Project Plans, including all modificationsthereof incorporated in the documents before their execution.4. DIRECTOR OF PUBLIC WORKS:The Director Public Works, of the Town of Trumbull, Connecticut, under whoseauthority all public works are performed. Hereinafter when the word "Engineer" is used,it is hereby interpreted to include the authority of the Director of Public Works, as well asthe Town Engineer.5. TOWN ENGINEER:The Town Engineer will represent the Town of Trumbull, Connecticut, and shall havecomplete charge of all work involved. Hereinafter where the word "Engineer" appears itshall mean the Town Engineer or his duly authorized representatives performing theirusual duties, i.e. clerk of the works, etc.6. CONTRACTOR:Party of the second part to the contract, acting directly or through his agent or employees.7. SUB-CONTRACTOR:Any individual, firm, partnership or corporation to whom the Contractor sub-lets orassigns any part or parts of this project covered by this contract.8. NOTICE:The term "notice" as used herein shall mean and include written notices.Written notice shall be deemed to have been served, when deposited in a United StatesMail Box to or at last known business address of the person, firm or corporation forwhom intended, or to his or their or its duly authorized agent, representative or office, orenclosed in a postage prepaid wrapper or envelope addressed to such person or firm orcorporation at his or their or its last known business address.Trumbull High School4Parking Expansion And Circulation Design Phase 1General Specifications
- Commodity Codes
-
- NAICS 236220Commercial and Institutional Building Construction
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Elevator Projects at Driggs a...
Number 8799 Title Elevator Projects at Driggs and Woodrow Wilson Elementary Schools Available
City of Waterbury
Bid Due: 7/09/2026
Norwalk High School State Pro...
Norwalk High School State Project 103-0263N-Site Concrete This solicitation is being posted to
State Government of Connecticut
Bid Due: 7/09/2026