Overlay (Spring, FY 24-25)
Project Information
- Bid Title
- Overlay (Spring, FY 24-25)
- Issuing Agency
- Yavapai County
- Location
- Arizona
- Published Date
- Mar 26, 2025
- Closing Date
- Apr 10, 2025
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- Project #2502380
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Overlay (Spring, FY 24-25)
Closing date
April 10, 2025, 01:30 PMLast modified date March 25, 2025, 03:39 PM
- Reference number Project #2502380
- Status Open
- Summary No specholder list available.
The scope of work includes furnishing of all labor, materials, equipment, fixtures and services required for a two-inch asphaltic concrete overlay on 1,060 linear feet of Sunlit Drive and 997 linear feet of Cherokee Road in Mountain Club, and 1,903 linear feet of Sapphire Drive and 1,753 linear feet of Julie Drive in Diamond Valley. The project has approximately 1,648 tons of asphaltic concrete with PG 64-22 binder. Other associated work includes adjusting two water valve frames and five manhole frames, 8,014 linear feet of shoulder build-up and grading and thickened edge preparation. All work is to be done in accordance with the plans, specifications, and contract documents .
There has been a MANDATORY pre-bid meeting scheduled for 10:00 a.m., Tuesday, April 1, 2025, hosted by Yavapai County Public Works through an online virtual meeting portal. Detailed meeting instructions will be included in the contract documents. Any questions or concerns about the project will be addressed at that time.
ENGINEER'S ESTIMATE $572,906.00
Project FilesPart A - Project Documents
Instructions for Bidding 2502380 (PDF, 128KB)
Instructions for Mandatory Pre-Bid Meeting 2502380 (PDF, 187KB)
Project Provisions and Specifications 2502380 (PDF, 2MB)
Part B - Project Plan Set
Overlay (Spring, FY 24-25) Plan Set 2502380 (PDF, 4MB)
Part C - Bidding Documents
Envelope #1 - This sealed envelope shall contain the following items: Completed and signed Proposal, Surety Bid Bond, Affidavit of Non-collusion, Subcontracting Certification, Addenda (if any), and sealed Envelope #2.
C.1 - Contract Documents
Required documents to be completed and signed.
Surety Bid Bond 2502380 (PDF, 121KB)
Affidavit of No Collusion 2502380 (PDF, 87KB)
Subcontracting Certification 2502380 (PDF, 92KB)
C.2 - Addenda
C.3 - Envelope #2
Required document to be completed and signed.
Bid Schedule 2502380 (PDF, 109KB)
- Commodity Codes
-
- NAICS 237310Highway, Street, and Bridge Construction
- NAICS 332613Spring Manufacturing
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Pioneer Parkway Rubberized Ch...
Pioneer Parkway Rubberized Chip Seal in Yavapai County, AZ - Project #1619226 See
Yavapai County
Bid Due: 7/20/2030