B026027 Fiber Connectivity for Agri Ed Bldg

Project Information

Bid Title
B026027 Fiber Connectivity for Agri Ed Bldg
Issuing Agency
Arkansas Tech University
Location
Arkansas
Published Date
May 27, 2026
Closing Date
Jun 16, 2026
Government Level
State & Local
Status
Closed
Original Source
Join to Access Full Details
Project Description
Open Date Job Description Status

June 16, 2026 2 p.m.

B026027 Fiber Connectivity for Agri Ed Bldg

Open
Attachment Preview
INVITATION FOR BID – BID NO. B026027
New Agriculture Education Building Fiber Connectivity Project
AlU"
ARKANSAS TECH UNIVERSITY
Procurement Services
514 West M Street
Russellville, AR 72801-2222
479-968-0269
purchasing@atu.edu
All responses must be submitted using this form.
Responses must be received in Procurement Services
Bid Response: at the address above by the date and time shown
Formal Sealed Bid below. In a sealed envelope with the bid number
clearly marked on the front. Faxed or email responses
are not acceptable.
RESPONSE DUE BY:
June 16, 2026
TIME: 2 p.m.
Mandatory site visit: June 8, 2026 at 10 a.m. Attendees meet at ATU
Agriculture Education Building Site located at 417 N Phoenix Avenue
Russellville, AR 72801.
Company Name and Address:
For additional information,
__________________________________________
contact:
Jennifer Warren
__________________________________________ Tel: 479-968-0269
E-mail: jwarren2@atu.edu
__________________________________________ Web Site:
http://www.atu.edu/purchasing
AWARD:
Award will be made in the best interest of the University, and the
University’s decision is final. Contract and Grant Disclosure,
Combined Boycott and Illegal Immigrant Certification Form, and EEO
Policy forms must be completed before purchase order can be
released. Forms can be accessed via the web -here.
INTERGOVERNMENTAL/COOPERATIVE USE OF PROPOSAL AND CONTRACT: In
accordance with Arkansas Code §19-11-249, this proposal and resulting contract is
available to any college or university in Arkansas that wishes to utilize the services of the
selected proposer, and the proposer agrees, they may enter into an agreement as provided
in this RFP.
ATU is soliciting sealed bids from all qualified contractors to provide all labor,
materials, equipment, and supervision to complete the project described herein.
Project: Fiber Connectivity for Agricultural Education Building. Preferred project
start date on or near August 7, 2026 but not required. Alternatively, the university
seeks for the project to begin late August or early September 2026.
Scope of Work: Option A see attachment 1
Scope of Work: Option B see attachment 2
Page 1 of 28
Bid bond of 5% of total bid is required and must be included in bid response for all
responses over $50,000.
List any subcontractors to be used. An additional page may be added to response if needed.
Trade
Name
Address
Phone Number
AR Contractor License Number
Trade
Name
Address
Phone Number
AR Contractor License Number
Trade
Name
Address
Phone Number
AR Contractor License Number
Trade
Name
Address
Phone Number
AR Contractor License Number
Name:
Email:
Phone Number:
Description of Project:
Name:
Email:
Phone Number:
Description of Project:
Name:
Email:
Phone Number:
Description of Project:
References
Page 2 of 28
Cost Response
Option A
Lump Sum Cost Response: $_______________________
Option B
Lump Sum Cost Response: $_______________________
Addendum Acknowledgement
Addendum Number(s): __________________
Signature Block
Company Name: ____________________________________________________________________
Signature & Title: ____________________________________________________________________
Name (printed or typed): _______________________________________________________________
Tel No: __________________________
Fax No: _____________________________
E-Mail: ___________________________
Web Site: ___________________________
Submission Checklist:
Attend Mandatory Site Visit
Complete Company Name and Address field
Complete response form fields
Complete all signature block fields and sign
Bid Bond (5%)
Acknowledge Addendum (if any)
Certificate of Commercial Liability Insurance
Copy of Arkansas Contractor License
Completed Contract and Grant Disclosure Form for your company and all subcontractors.
Completed Combined Restriction and Illegal Immigrant Certification Form
EEOC policy form and backup documentation
Seal entire response in an envelope and deliver to ATU Procurement 514 West M Street
Russellville, AR 72802 by date and time listed on page 1. Late responses will not be accepted.
Page 3 of 28
Attachment 1
Option A
New Agri Building Basic Fiber Connectivity Scope of Work
Introduction
The following is a scope of work for the installation of infrastructure and fiber for the new Agri building
and classroom at the Arkansas Tech University Russellville Campus. This project will involve:
Installation of new underground conduit
Installation of new ground vaults
Where new ground vaults are to be installed intersecting existing conduit, cut open the existing
conduit to provide access while being careful not to damage existing active fiber.
Installation, labeling, termination, and certification of new singlemode fiber between designated
locations. Certification documentation must be provided to ATU at project completion.
Installation of Tracesafe wiring to be run in any conduit that does not already have Tracesafe.
Termination of Tracesafe should be done in each ground vault/handhold.
Creation of as-built documentation and maps of the new conduit routes, spliceboxes, and ground
vaults/handholds. Documentation and maps must be provided to ATU at project completion.
Materials
All materials are to be provided by the contractor, unless otherwise noted. Contractor is responsible for
all parts, tools, and labor needed to complete the project.
In addition to the model of parts specified necessary for the project, the contractor shall also provide:
Parts, tools, labor, and materials to install new 1 x 4” conduit paths
Parts, tools, labor, and materials to install new ground vaults/handholds
Tools and labor to run 12-strand fiber through conduit and into splice box
Parts, tools, labor, and materials to add Tracesafe cable to any conduit part of this project that does
not already have a Tracesafe cable present along the run
Tools and labor to fusion splice, certify, and label single mode fiber
Parts, labor, and materials to add pull tape to leave in conduit with new pulls for future use
The following are the materials needed for installation. If a vendor and part number is provided below, no
substitutions will be accepted without approval by ATU unless otherwise noted:
Multilink Part # CT-X-PS-CL-12-SCU-P CTX Patch and Splice Cassettes - Each splice cassette
comes with a 12-strand Singlemode pigtail which can be fusion spliced to the fiber bundle run.
Connectors should be Singlemode SC. Each cassette is for 12 connections. These cassettes can be
mounted in the rack shelves specified below as well as the Multilink Splice boxes specified above.
Multilink Part # 045-665-00 1RU Fiber Shelf – Rack-mounted fiber shelf that can hold two CTX
splice cassettes. Suitable to terminate up to 24-strand fibers. Also requires Multilink Part # 072-
208-50 which should be the bulkhead for the 2 cassette 1RU shelf.
All materials to provide orange 19-awg Trace-Safe RT1800W wires and locating connector
terminations with any fiber run in this project running through a conduit that does not already have
a Trace-Safe cable installed. Trace-Safe should be cut and terminated at each splice box and
ground vault. See attached cutsheet.
Materials to label new fiber runs. Labeling needs to be done in the box, both on the door label and
as a tag on each fiber coming up from the splice box, to indicate what cassettes go to which
location and engraved waterproof tags need to be added to the fiber in each ground vault/handhold
to indicate what runs they belong to.
Page 4 of 28
All labor and materials run, fusion terminate, test/certify, and label all required Single mode fiber runs.
The fiber should be OCC Part # DX012DSLA9KAA2 fiber – 12-strand armored tight-buffer singlemode fiber
to run between the building and the Multilink splice box. See attached cutsheet. (If this part is not
available, substitutions would be accepted as long as the new fiber meets or exceeds the specs listed in
this cutsheet).
Conduit installed between existing and/or new ground vaults should be a single 4-inch
New ground vaults should be at least 2-foot x 4-foot in size with split lids and open bottom
o Proper drainage with a drainage layer should be installed at the bottom of each new ground
vault
If there are any questions on part numbers or materials that the contractor is responsible for, please
contact the ATU Office of Information Systems before purchase.
Project
The project consists of installation of two new ground vaults, one of which to be installed over existing
conduit and then to open those conduits up for future fiber runs, the installation of TraceSafe cable in all
sections of the conduit, and the installation, termination, labeling, and certification of singlemode fiber to
run from inside the new Agri building, through the new vaults and conduits, until it meets the existing
vault just South of the ATU Facilities Management building. From there, the fiber will turn South and
use existing conduit and vault infrastructure until it reaches Paine Hall at the intersection of West Q Street
and North Glenwood Avenue. It will then be pulled into the existing Multilink splicebox pedestal and
terminated. For cassette placement in the Multilink box, box-to-box cassettes should be at the top and
added going downward while building-to-box cassettes should start on the bottom and added going up.
The Agri building does not currently have a data closet or conduit entry point for fiber. These will be
constructed during the time of this project. Conduit work and the vault installations can and should occur
while building construction is happening so that the construction can include a conduit tie-in to the
ground vault being installed near the building as part of this scope of work. This means that there will
need to be a delay in running the fiber into the building and terminating until the entry conduit and data
closet exist and are ready.
Inside the Agri building, the fiber should be terminated into a Multilink CTX cassette and then mounted
in to the compatible Multilink shelf. On the end connecting to the splice box, it will need to be terminated
into a Multilink CTX cassette which the splice box is designed to accommodate.
Required Work
The fiber run will require new conduit and ground vault installs between the new Agri building and the
existing ground vault to the South of the Facilities Management office building. You can see in the image
below, the Agri building is built in the area indicated by the red square, the existing vault is indicated by a
blue square, and the splice box the fiber must be run to is indicated by the green square. The existing
conduit is shown in orange.
Page 5 of 28
Commodity Codes
  • NAICS 238210Electrical Contractors and Other Wiring Installation Contractors
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.

Government Bids

Empower Your Bidding Strategy

Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.

  • Access an extensive database of bids, including comprehensive local and state opportunities.
  • Receive customized alerts for the bids that matter most to your business.
  • Explore detailed specifications to ensure precise and competitive submissions.
  • Gain a competitive edge with up-to-date information and exclusive opportunities.

See Also

RWU SCADA Systems

NOTICE TO BIDDERS Notice is hereby given that Rogers Water Utilities is soliciting

Arkansas Democrat-Gazette

Bid Due: 7/14/2026

Separate sealed Bids for the ...

ADVERTISEMENT FOR BIDS City of Delight, Arkansas Mayor Lee Gatliff 200 School Lane

Arkansas Democrat-Gazette

Bid Due: 7/21/2026