CSP 26.11 - Stadium Scoreboard Project Addendum No. 2
Project Information
- Bid Title
- CSP 26.11 - Stadium Scoreboard Project Addendum No. 2
- Issuing Agency
- Beaumont Independent School District
- Location
- Texas
- Published Date
- Feb 2, 2026
- Closing Date
- Feb 10, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
- Attachment Preview
-
ADDENDUM NO. 1February 2, 2026Project:Beaumont ISD Stadium Score BoardPrepared by:Salas O’Brien Engineers10930 W. Sam Houston Parkway N., Suite 900Houston, Texas 77064SOBE Project No.: 2550-02337Prepared For: Prospective Proposers02/02/2026PART A:NOTICE TO PROPOSERS1.Receipt of this Addendum shall be acknowledged on the Proposal Form. Failureto do so may subject Proposers to disqualification. Each Proposer shall makenecessary adjustments and submit his proposal with full knowledge of allmodifications, clarifications, and supplemental data included therein.2.This Addendum forms part of the Contract Documents and shall be incorporatedintegrally therewith. Where provisions of the following supplemental data differfrom those of previously issued documents, this Addendum shall govern.3.The following Contract Documents have been issued to date delineating theWork (Project). Contract Documents dated: January 6, 20264.This Addendum consists of 3 typewritten pages and no page of attachments for atotal of 3 pages.PART BPART CPART DPART EPART FCHANGES TO PRIOR ADDENDUM1.NoneCHANGES TO THE PROJECT MANUAL1.NoneCHANGES TO THE DRAWINGS1.NoneRE-ISSUED DRAWING SHEET (30”X42”)1.NoneNEW DRAWINGS SHEETS (30”X42”)1.NonePART GQUESTIONS/CLARIFICATIONSComments from preproposal Meeting:1.Procurement MethodIs this project being administered through a cooperative purchasing agreement(CO-OP)? If so, please specify which cooperative applies.RESPONSE: CSP only2.Clock SystemsShould the existing locker-room clocks be reallocated as part of this project, orshould new clocks be included in our proposal?RESPONSE: Yes, new clocks installed at existing locations four total.Page 1 of 3Are delay-of-game clocks required as part of the project scope?RESPONSE: Yes, replace clocks at existing location.3.Video and Replay SystemsShould our proposal include any cameras and/or a four-channel replaycapability?RESPONSE: Yes, include at least 3 cameras and 4 channel replay system.4.Audio SystemIs a new audio system included within the project scope, or should it be excludedfrom our proposal?RESPONSE: Yes, a new audio system is to be included.5.Audible Signaling, should a horn be included as part of the proposed system?RESPONSE: Yes, horn should be provided6.Are bids to include all necessary electrical and fiber upgrades? The CSP doc onpage 11 says “Removal/replacement of current scoreboard and electricalupgrades to support new board” but Project specs on page 115 say “All powerdistribution from the disconnect to the sign to be provided by the owner. TheContractor is responsible for all power distribution inside the LED” and on page108 “Any necessary signal/control conduit and cable raceways for cable runs toand from display components will be provided by others. All fiber to be providedby the Contractor.RESPONSE: All electrical work is shown in the contract documents and tobe provided. Reference Sheets: E01, E1.0, E2.0, All power distribution is tobe provided in this contract. Electrical. All power distribution from thedisconnect to the sign to be provided by THIS CONTRACTOR. TheContractor is responsible for all power distribution inside the LED displayas required.7.Our original bid, prior to the release of the CSP, included: Delay of Game Clocks,Sound System, Backlit Truss above the display with speaker mesh, (4) cameras(3 wireless and 1 wired). I did not see those items listed in any of the documents.Are any of those listed items to be provided in the bid?RESPONSE: Yes, all video and audio equipment, and game clocks are to beprovided as per original proposal.8.We originally provided a bid on the Natatorium LED display. I just want to confirmthat is not part of the scope. If it is not, is there a plan to release another CSP forthat project?RESPONSE: The Natatorium is not part of this CSP scope.CLARIFICATIONS1.Game Clocks TO BE RELACED AT EXISTING LOCATIONA.Clocks1.4” red digit – 8”x1’-3”x3.25” or similar (Qty: 5)Page 2 of 3PART H.ATTACHMENTS1.NoneEND OF ADDENDUM 1Page 3 of 3
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Advanced Metering Infrastruct...
Project: Advanced Metering Infrastructure (AMI) Proof of Concept Program Ref. #: BCZ26-00030328 Type:
City of Dallas
Bid Due: 7/24/2026
Acceleration and Deceleration...
Bid Information Type Invitation To Bid Status Issued Number ITB 2026-008 Paseo De
Webb County
Bid Due: 7/09/2026