Statewide Cabin Improvements

Project Information

Bid Title
Statewide Cabin Improvements
Issuing Agency
Ohio Facility Construction Commission
Location
Ohio
Published Date
Jun 18, 2026
Closing Date
Jul 1, 2026
Government Level
State & Local
Status
Closed
Ref. #
DNR-270080
Original Source
Join to Access Full Details
Project Description
Publish Date Due Date Number Owner Contractring Authority Project Name Primary Service Estimated Project Cost Q&A Short List Notes
2026/06/12 7/1/2026 DNR-270080 Ohio Department of Natural Resources Local Agency Statewide Cabin Improvements A/E $4,334,000 TBD
Attachment Preview
Request for Qualifications (Registered Design Professional*)
State of Ohio Standard Forms and Documents
Administration of Project: Local Agency
Project Name Statewide Cabin Improvements
Project Location Various
City / County various / various
Owner
Ohio Department of Natural Resources
Delivery Method General Contracting
Publish Date Entered By Procurement
Response Deadline 07/01/2026
Project Number
DNR-270080
Project Manager
Mary Lynn Happ
Contracting Authority Local Agency
Prevailing Wages State
4:00 PM local time
No. of paper copies requested (stapled, not bound)
0
No. of electronic copies requested (PDF)
1
* “Registered Design Professional includes any architect holding a certificate issued under section 4703.10 of the Revised
Code, any landscape architect holding a certificate issued under section 4703.36 of the Revised Code, or any engineer
holding a certificate issued under section 4733.14 of the Revised Code.” (Ohio Building Code section 4101:1-2-01 Definitions)
Submit the requested number of Statements of Qualifications (Form F110-330) directly to Division of Engineering at
engineering@dnr.ohio.gov. See Section J of this RFQ for additional submittal instructions.
Submit all questions regarding this RFQ in writing to Division of Engineering at engineering@dnr.ohio.gov with the project
number included in the subject line (no phone calls please). Questions will be answered and posted to the Opportunities page
on the OFCC website at http://ofcc.ohio.gov on a regular basis until one week before the response deadline. The name of the
party submitting a question will not be included on the Q&A document.
Project Overview
A. Project Description
The Ohio Department of Natural Resources (ODNR), through the Division of Parks and Watercraft is responsible for the
management of Ohio’s State Parks, 16 of which offer overnight rental opportunities for individual, one, two, and three-
bedroom cabins. Cabins were constructed in the parks between 1940 and 2026 with many undergoing minor renovations
to date. ODNR has previously conducted assessments with several rounds of improvements completed to the cabins at
multiple Park locations. This project serves as a continuation of those efforts with renovations to cabins at both Lake
Hope State Park in Vinton County and Maumee State Park in Lucas County (managed by concessionaires in partnership
with ODNR).
Through this selection process, ODNR will engage an Architectural firm to provide design documents for complete,
exterior and structural improvements to 36 cabins at Lake Hope the Furnace and Forest cabins, in additional to full,
interior renovations in 24 cabins at Maumee State Park.
As scope and associated costs are solidified, projects of similar types, scope and budget may be added or removed as
ODNR initiatives and funding allow.
While ODNR anticipates centralized services from the selected Consultant at the ODNR Fountain Square complex at
2045 Morse Road, Columbus, Ohio 43229, travel will be necessary to complete the services. For the purposes of scoring
proximity to project site, the ODNR Fountain Square complex will be considered the project site.
B. Scope of Services
The selected team will develop site-specific plans and reconcile any existing master plans for selected locations,
beginning with the confirmation of facility and site assessments. These reconciliations will address the site utilization
needs of various user groups, and utility infrastructure needs versus constraints. They will also include recommended
scopes of construction projects and appropriate phasing.
The selected firm shall apply for and obtain all necessary regulatory permits, maintain current estimates of probable
construction costs through the design phase, and provide construction administration services. Permitting and/or
coordination with United States Army Corps of Engineers (USACE), United States Fish and Wildlife Service (USFWS),
ODNR Dam Safety Program, ODNR Division of Wildlife, Ohio Environmental Protection Agency (OEPA), State Historic
Preservation Office (SHPO), and the local floodplain administrators will be required. The selected firm will provide the
F110-02-2026-JAN
Publish Date: 6/12/26
Page 1 of 5
Request for Qualifications (Registered Design Professional) continued
engineering analysis and calculations needed to advance the design, including structural, geotechnical, and hydraulics
engineering.
All design and construction shall comply with the current editions of all applicable national, state, and local codes, as wel l
as accessibility standards, including ADA, ICC A117.1, and the ABA Outdoor Developed Areas Guidelines. The Ohio
Department of Natural Resources Division of Engineering has developed a set of design guidelines for construction
projects. It is expected that all architects, engineers, consultants, and contractors will be familiar with these design
guidelines which will serve as the preference for all construction projects when developing final project specifications. A
complete set of current guidelines is available at https://ohiodnr.gov/business-and-industry/services-to-business-
industry/design-guidelines-all.
The selected A/E, as a portion of its required Scope of Services and prior to submitting its proposals, will discuss and
clarify with the Owner and/or the Contracting Authority, the cost breakdown of the Architect/Engineer Agreement detailed
cost components to address the Owner’s project requirements. Participate in the Encouraging Growth, Diversity & Equity
(EDGE) Program as required by statute and the Agreement.
As required by the Agreement, and as properly authorized, provide the following categories of services: Program
Verification, Schematic Design, Design Development, Construction Document Preparation, Bid and Award Support,
Conformed Documents, Construction Administration, Post-Construction, and Additional Services of all types.
As scope and associated costs are solidified, projects of similar types, scope, and budget may be added or removed as
ODNR initiatives and funding allow. Accordingly, the contract with the selected firm may be extended and amended to
meet the goals of ODNR’s Capital Improvements Program.
Refer to the Ohio Facilities Construction Manual for additional information about the type and extent of services required
for each. A copy of the standard Agreement can be obtained at the OFCC website at https://ofcc.ohio.gov.
During the construction period, provide not less than 16 hours (excluding travel time) on-site construction administration
services each week, including (1) attendance at progress meetings, (2) a written field report of each site visit, (3) on -site
representation comprised of the A/E and its consultant staff involved in the primary design of the project, all having
relevant and appropriate types of construction administration experience.
For purposes of completing the Relevant Project Experience Matrix in Section F of the Statement of Qualifications (Form
F110-330), below is a list of relevant scope of work requirements for this RFQ:
1. Experience designing work of similar scope (renovation of vacation rental facilities, i.e. Cabins).
2. Experience with space planning, furniture selection and administration of interior packages.
3. Ability to manage design and phased construction projects with multiple sites under single contract.
4. Agility to manage design and construction projects in an occupied State Park setting.
5. Ability to manage design and construction projects under the GC delivery model.
6. Experience with Public Construction.
7. Experience with accurate Project Estimating.
8. Experience with Schedule Management.
9. Experience with Construction Administration.
10. Experience with Conducting full assessments of existing facility conditions.
C. Estimated Budget / Funding
State Funding:
$4,334,000.00
Other Funding:
$0
Construction Cost: $3,640,000.00
Total Project Cost: $4,334,000.00
D. Anticipated Schedule
Professional Services Start:
Construction Notice to Proceed:
Substantial Completion of all Work:
Professional Services Completed:
10 / 26
08 / 27
11 / 28
11 / 29
E. Estimated Basic Fee Range (see note below)
F. EDGE Participation Goal
7% to 8%
Percent of initial Total A/E Fee:
5.0%
NOTE: Basic Services include: (1) Program Verification, (2) Schematic Design, (3) Design Development, (4) Construction Documents,
(5) Bidding and Award OR GMP Proposal and Amendment (as applicable), (6) Construction Administration, and (7) Closeout services. The
Basic Fee includes all registered design professional services and consultant services necessary for proper completion of the Basic Services,
including validation of existing conditions (but not subsurface or hidden conditions) and preparation of cost estimates and design schedules for
F110-02-2026-JAN
Publish Date: 6/12/26
Page 2 of 5
Request for Qualifications (Registered Design Professional) continued
the project. The Estimated Basic Fee Range is calculated as a percentage of the Estimated Budget for Construction Cost above,
including the Owner’s contingency. The Basic Fee excludes any Additional Services required for the project.
G. Basic Service Providers Required (see note below)
Lead A/E Discipline: Architecture
Secondary
Engineering
Disciplines:
Structural Engineering
Civil Engineering
Electrical Engineering
Mechanical Engineering
Plumbing Engineering
H. Additional Service Providers Required
Construction Administration
Hazardous Material Assessment/Design/Removal
Specialty Inspections
QA/QC Testing
Interior Design Services
Furniture and Fixture selection
Enter Secondary Discipline
Enter Secondary Discipline
NOTE: The lead A/E shall be (1) any architect holding a certificate issued under section 4703.10 of the Revised Code, (2) any landscape
architect holding a certificate issued under section 4703.36 of the Revised Code, or (3) any engineer holding a certificate issued under section
4733.14 of the Revised Code.
I. Evaluation Criteria for Selection
Demonstrated ability to meet Owner’s programmed project vision, scope, budget, and schedule on previous
projects.
Previous experience compatible with the proposed project (e.g., type, size).
Relevant past work of prospective firm’s proposed consultants.
Past performance of prospective firm and its proposed consultants.
Qualifications and experience of individuals directly involved with the project.
Proposer’s previous experience (numbers of projects, sizes of projects) when working with its proposed
consultants.
Specification writing credentials and experience.
Experience and capabilities of creating or using Critical Path Method (CPM) schedules and of using CPM
schedules as a project management resource.
Approach to and success of using partnering and Alternative Dispute Resolution.
Proximity of prospective firms to the project sites.
Proposer’s apparent resources and capacity to meet the needs of this project.
Interested A/E firms are required to address how they will implement Building Information Modeling (“BIM”) on the project,
experience and level of training of staff related to BIM, incorporation of team partners that have previous BIM experience,
and an understanding of collaborative BIM processes, including but not limited to the State of Ohio BIM Protocol available
at the OFCC website at https://ofcc.ohio.gov.
Interested A/E firms are required to submit the Commitment to Participate in the EDGE Business Assistance Program
form in its Statement of Qualifications (Form F110-330) submitted in response to the RFQ, to indicate its intent to contract
with and use EDGE-certified Business(es), as a part of the A/E’s team. The Intent to Contract and to Perform and / or
waiver request letter and Demonstration of Good Faith Effort form(s) with complete documentation must be attached to
the A/E’s Technical Proposal. Both forms can be accessed via the OFCC website at https://ofcc.ohio.gov. The Intent to
Contract and to Perform form is again required at the Fee Proposal stage.
If the A/E firm intends to receive points for exceeding the EDGE Participation Goal, it must provide BOTH a
completed Commitment to Participate form AND a completed Statement of Intent to Contract and to Perform form
signed by both parties with its Statement of Qualifications.
For all Statements of Qualifications, please identify the EDGE-certified Business(es), by name, which will participate in the
delivery of the proposed professional services solicited in the RFQ.
Interested A/E firms must indicate on their Statement of Qualifications, the locations where their services will be
performed in the spaces provided or by attachment in accordance with the requirements of Executive Order 2019-12D
related to providing services only within the United States and the requirements of Executive Order 2022-02D prohibiting
F110-02-2026-JAN
Publish Date: 6/12/26
Page 3 of 5
Request for Qualifications (Registered Design Professional) continued
purchases from or investment in any Russian institution or company. Failure to do so may cause their Statement of
Qualifications to be rejected.
J. Submittal Instructions
Firms are required to submit the current version of Statement of Qualifications (Form F110-330) available via the OFCC
website at https://ofcc.ohio.gov.
Electronic submittals, if requested, should be combined into one PDF file named with the project number listed on the
RFQ and your firm’s name, followed by “SOQ”. Use the “print” feature of Adobe Acrobat or similar software for creating a
PDF rather than using a scanner. If possible, please reduce the file size of the PDF. In Acrobat, go to Advanced, then
PDF Optimizer. Electronic submittals are limited to a maximum file size of 25 MB.
Paper copies of the Statement of Qualifications, if requested, should be stapled only. Do not use special bindings or
coverings of any type. Cover letters and transmittals are not necessary.
CD/DVD copies of the Statement of Qualifications, if requested, should have the sleeve labeled with the project number
and firm name, followed by “SOQ”.
Facsimile copies of the Statement of Qualifications will not be accepted.
Firms are requested to identify professional registrations, memberships and credentials including: LEED GA, LEED AP,
LEED AP+, CCCA, CCM, CCS, CDT, CPE, DBIA, and any other appropriate design and construction industry credentials.
Identify that information on the resume page for individual in Block 22, Section E of the F110-330 form.
F110-02-2026-JAN
Publish Date: 6/12/26
Page 4 of 5
Registered Design Professional Selection Rating Form
State of Ohio Standard Forms and Documents
Project Name SW Cabin Improvements
Project Number DNR270080
Proposer Firm
City, State, Zip
Selection Criteria
1. Primary Firm Location, Workload and Size (Maximum 10 points)
a. Proximity of firm to project site
b. Amount of fees awarded by Contracting Authority in
previous 24 months
c. Number of licensed professionals
Less than 100 miles
100 miles to 150 miles
More than 150 miles
Less than $1,000,000
$1,000,000 to $2,000,000
More than $2,000,000
Less than 10 professionals
10 to 20 professionals
More than 20 professionals
2. Primary Firm Qualifications (Maximum 30 points)
a. Project management lead
b. Project design lead
c. Technical staff
d. Construction administration staff
Experience / ability of project manager to
manage scope / budget / schedule / quality
Experience / creativity of project designer to
achieve owner’s vision and requirements
Experience / ability of technical staff to create
fully coordinated construction documents
Experience / ability of field representative to
identify and solve issues during construction
3. Key Consultant Qualifications (Maximum 20 points)
a. Key discipline leads
Experience / ability of key consultants to
perform effectively and collaboratively
b. Proposed EDGE-certified Consultant participation*
One point for every 2 percent increase in
professional services over the EDGE
participation goal
4. Overall Team Qualifications (Maximum 10 points)
a. Previous team collaboration
b. LEED** Registered / Certified project experience
c. BIM project experience
d. Team organization
Less than 4 sample projects
4 to 6 sample projects
More than 6 sample projects
Registered LEED v4.0 or v4.1 projects
Certified LEED v4.0 or v4.1 projects
Training and knowledge
Direct project experience
Clarity of responsibility / communication
demonstrated by table of organization
5. Overall Team Experience (Maximum 30 points)
a. Previous team performance
b. Experience with similar projects / delivery methods
c. Budget and schedule management
d. Knowledge of Ohio Capital Improvements process
Past performance as indicated by
evaluations and letters of reference
Less than 6 projects
6 to 8 projects
More than 8 projects
Performance in completing projects within
original construction budget and schedule
Less than 6 projects
6 to 8 projects
More than 8 projects
Value
5
2
0
2
1
0
3
2
1
Max
=3
0 - 10
0 - 10
0-5
Max
= 20
0-5
0 - 15
0-5
1
2
3
Max
=3
1
Max
2
=2
1
Max
3
=3
0-2
0 - 10
0-3
4-6
7 - 10
0-5
0-1
2-3
4-5
Score
* Must be comprised of registered professional design consulting firms and NOT the lead firm - For more
information on scoring this and other criteria refer to Document F199-01 - PS Selection Rating Rubric.
** Leadership in Energy & Environmental Design administered by Green Business Certification Inc.
Notes:
Evaluator:
Name
Subtotal
Signature
Date
F110-02-2026-JAN
Publish Date: 6/12/26
Page 5 of 5
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.

Government Bids

Empower Your Bidding Strategy

Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.

  • Access an extensive database of bids, including comprehensive local and state opportunities.
  • Receive customized alerts for the bids that matter most to your business.
  • Explore detailed specifications to ensure precise and competitive submissions.
  • Gain a competitive edge with up-to-date information and exclusive opportunities.

See Also

MH-139 Lithium-Ion Battery Re...

Follow MH-139 Lithium-Ion Battery Replacement Active Contract Opportunity Notice ID MH139-CR04 Related Notice

DEPT OF DEFENSE

Bid Due: 7/10/2026

MH-139 Color Weather Radar

Follow MH-139 Color Weather Radar Active Contract Opportunity Notice ID MH139-CR03 Related Notice

DEPT OF DEFENSE

Bid Due: 7/24/2026