St. Marys Road Western Intersection Improvements (Intersection at Still Waters Rd)
Project Information
- Bid Title
- St. Marys Road Western Intersection Improvements (Intersection at Still Waters Rd)
- Issuing Agency
- St. Marys city
- Location
- Georgia
- Published Date
- Apr 10, 2026
- Closing Date
- May 20, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Description Opening Date/Time Closing Date/Time Invitation to Bid
St. Marys Road Western Intersection Improvements (Intersection at Still Waters Rd)
April 10, 2026
4:00
PM
May 20, 2026
2:00
PM
- Attachment Preview
-
9/12/2025PfeilC$PRF8$GDOT_ETM.tblLOCATION SKETCHTHIS PROJECT HAS BEEN PREPAREDUSING THE HORIZONTAL GEORGIACOORDINATE SYSTEM OF 1984 (NAD1983)/94 WEST ZONE, AND THE NORTHAMERICAN VERTICAL DATUM (NAVD)OF 1988.A 14G.8S318A 14G.5S357A 14G.5S3261A4B.B68241A7T.B2275A 41.4F0.N-6FC4TA. 1HIGH HOG_WIRE1A4F.N2C3A21A4G.S258BACK FLOW1A5G.0S3631A4G.8S3741A4G.7S345A 14B.B87251AA 151A B3B.5B T3.B2.B 7288262678A 16T.B72771A7T.B2266A 14B.B4430A 19T.B2353APP454.38A 14B.B5029A 18T.B5382A 13F.N2C8A81A51AT.5PF3.N D93C33A9* SERVICE_BOX (OWNER: ATT)A 17T.B5A 13221A3B 142X .B 1A 8I.N D 6572T418.BR 1121C9P1A6T.B6390A 16G.1S4091A4G.9S4881A6T.B9A010A 15G.3S407A 15B.B9A59A 17T.B0A391A5B.B9A68A 17T.B4A681A7E.P7A181A4F.N5C6A71A5G.0S486A 15G.7S435A 15B.B2A37A 17T.B2A17A 17E.P7A171A7T.B1106A 13B.B54231A4G.3S2171A7T.B5117A 15B.B1922A 17T.B2168A 13B.B4321APP2 A 15G1A.1S4G30.Y281AA34G5.Y71AA35G6.Y0A7717.471A7T.B0159AGYA3A *13A 14TP64M .EPI8.N 7HD D 53C1ELASITD TVA1L*1A(2TO R.P7IW SD9EN2RER(O: 1AA W3BT.NB7TE82) R 0 : ATT)A115G5.Y.03A744A 17T.B1290A 17E.P697A 16T.B996A 17E.P91301A7T.B7120A 16S.S2S56* WARNING_SIA 1G4BN.B187SPEED LIMIT 551A *7TF.7O 95UNDA 17T5.B /4819-I1N. I.R. W/ PLASTIC1A4BC.B2A99P STAMPED LB3624 IN GOOD CONDITIONA 15G.0S232A 17T.B3192A 14B.B87101A5G.2S234A 15G.1S283A 15F.N0C71021A1A42X3BI..N D 8B07171R23CP1A7T.B3103A 13B.B55111A5G.2S206A 16F.N0C3121A5G.2S2651A6F.N0C6111A2B.B7212A 17T.B51941A6T.B9195A 15F.N8C9A61A5G.6S494A 16F.N1C1A5A 15G.8S433A 14B.B8A661A7T.B0A16A 17E.P5A561A7E.P5881A7T.B181ASSS516.43* WARNING_SIGN DIVIDED HIGHWAY AHEADA 14B.B971A 15G.4S291A 15G.6S220APP115.181GA5YG.AYA15A5G6.2Y1A81A 15F.N6C49* WOOD POWER POLE NO. 41834A 15G.5S4421A5G.9S411A 14B.B6A65A 16T.B8A75A 17E.P1A95A 15F.N3C2A41A5G.4S4601A5F.N2C5A3A 15G.1S103A 15G.5S142A 15G.6S359A 14B.B3A44ASSS716.30* WARNING_SIGN SIGNAL AHEADA 16T.B6A44A 16E.P9A641A4B.B3A831A6T.B6A53A 16E.P9A63A 14G.0S171A 14G.7S100A 14B.B4A721A4B.B2A4111A83X11AI.83D N 3XI.54D N 4R25C RPCP1A6T.B4A31A 17E.P0A311A6T.B3A92AT4ASSS116.62* FOUND5/A 186-EI.N P9A.9I2.R.W/PLASTICCAPSTAMPEDLB3624INGOODCONDITION16.47* WARNING_SIGN SPEED LIMIT 451AA 1A 161A 11A C1A6C1A5611A 1A A 1.8511A C63CB X31A 7.X685B 1A .3I65C 85.3X .CB CX BB864.67D 7N 50C.ID 6.1I1..9C.B5BD 87B N 152.1557D 96N 1763B.672B97126R 62781667361R 240RCCCPPPA 16E.P9311A6T.B530A 17E.P1471A3B.B821A 1882X11AI.82D N 9XI.01D N 8R38C RPCPH216.741A6T.B8*42FOUND 5/8-IN. I.R. W/ PLASTIC CAP STAMPED LB3624 IN GOOD CONDITIONA 17E.P3631A7E.P5791A7T.B174ASSS416.56* WARNING_SIGN CLICKET OR TICKETA 15B.B2641A6S.S4S1A 126T.B762* COMMERCIAL_SIGN TOURIST INFOA 14B.B6581A5G.6S1971A5G.6S158A 15G.7S106A 15F.N7C27A 17E.P1561A6T.B854A 14B.B740A 15G.0S154A 15G.2S1151A5F.N1C26ASSS316.06* WARNING_SIGNYIELDA 14B.B134A 14G.S185A 14G.S1981A4F.N7C951A3G.S675A 13G.S2691A3F.N4C341A5G.3S199A 15F.N4C981A4G.1S298A 14G.4S279A 12B.B81151A 1A 1252BX.I.B7D N 62189R 4 CPA 17T.B1284A 14G.3S311A 13B.B82191A1A4G4.GY3.YA21A899A 14G.2S360A 17T.B1231A1AM3B.HB6S11281365I.N 60LID1A6M.4H5S136IN LID1A7P.P4A 1313B.B39171A3B.B25161A6T.B8242A 17T.B1293A 17D.7IR011A6E.P9251A6T.B229A 13G.S046A 13G.S1351A3F.N6C5311A51XI.N D 861R0 CPAMHS116.4536IN LID1A7E.P0151A6T.B5151A3B.B8101AA 133G T41A ..OS36.3F0W 117.N -31FC3T1. HIGH HOG_WIRE1A3G.S627A 13F.N4C92BEGIN PROJECTSTA. 5+74.16ST MARYS ROADSCALE IN FEET050010002000THE DATA, TOGETHER WITH ALL OTHER INFORMATION SHOWN ON THESE PLANS OR IN ANYWAYINDICATED THEREBY, WHETHER BY DRAWINGS OR NOTES, OR IN ANY OTHER MANNER, ARE BASEDUPON FIELD INVESTIGATIONS AND ARE BELIEVED TO BE INDICATIVE OF ACTUAL CONDITIONS.HOWEVER, THE SAME ARE SHOWN AS INFORMATION ONLY, ARE NOT GUARANTEED, AND DO NOTBIND THE DEPARTMENT OF TRANSPORTATION AND THE CITY OF ST. MARYS IN ANY WAY. THEATTENTION OF BIDDER IS SPECIFICALLY DIRECTED TO SUBSECTIONS 102.04, 102.05, AND 104.03OF THE SPECIFICATIONS.11/05/2020CONCOV-CECover01.dgn0001CITY OF ST. MARYSP.I. No.ST. MARYS INTERSECTIONIMPROVEMENTSBID SET9/12/2025NOTE :ALL REFERENCES IN THIS DOCUMENT, WHICH INCLUDES ALL PAPERS,WRITINGS, DOCUMENTS, DRAWINGS, OR PHOTOGRAPHS USED, OR TO BEUSED IN CONNECTION WITH THIS DOCUMENT, TO " STATE HIGHWAYDEPARTMENT OF GEORGIA ", " STATE HIGHWAY DEPARTMENT ", " GEORGIASTATE HIGHWAY DEPARTMENT ", " HIGHWAY DEPARTMENT ", OR" DEPARTMENT " WHEN THE CONTEXT THEREOF MEANS THE STATEHIGHWAY DEPARTMENT OF GEORGIA, AND SHALL BE DEEMED TO MEANTHE DEPARTMENT OF TRANSPORTATION.THESE PLANS HAVE BEEN PREPARED IN ACCORDANCE WITH THE CONSTRUCTIONSTANDARDS AND DETAILS BOOK AND ATTACHED APPLICABLE REVISIONS. THECONSTRUCTION STANDARDS AND DETAILS BOOK IS AVAILABLE AT:http://mydocs.dot.ga.gov/info/gdotpubs/ConstructionStandardsAndDetails/Forms/AllItems.aspxANY REVISIONS CONTAINED WITHIN THIS PLAN SET SUPERSEDE THE CONSTRUCTIONSTANDARDS AND DETAILS BOOK WHICH THEY REVISE OR IN WHICH THERE IS A CONFLICT.LENGTH OF PROJECTNET LENGTH OF ROADWAYNET LENGTH OF BRIDGESNET LENGTH OF PROJECTNET LENGTH OF EXCEPTIONSGROSS LENGTH OF PROJECTCOUNTYNo.P.I. No.MILES1.6990.001.6990.0001.699END PROJECTSTA. 95+45.80PLANS PREPAREDBY:ENGLAND-THIMS & MILLER, INC.14775 Old St. Augustine RoadJacksonville, FL 32258TEL: (904) 642-8990DESIGNRECOMMENDED FORSUBMISSION BY:DESIGNRECOMMENDED FORACCEPTANCE BY:STATE DESIGN ENGINEERDATECHIEF ENGINEERPLANS COMPLETEDREVISIONSDRAWING No.01-0001DATE$$$PfeilCGPLN-CE11/05/2020TIME$$$ $PRF8$$$PENTABLE$$$DGN$DRAWING NO.DESCRIPTION01-0001Cover Drawing02-0001Index Drawing04-0001General Notes/Project Notes05-0001 - 05-0003Typical Sections13-0001 - 13-0015Mainline Roadway, Crossroad, Side Street, and Frontage Road Plan Drawings23-0001 - 23-0018Cross Sections26-0001 - 26-0015Signing and Marking Plans and Details - Plan DrawingsREVISION DATE DRAWING NO.Georgia Standards1001B1019A1030D11030D21030D31033g1034g11201122-3112514019031S9031T9031U91009106Pipe Culvert Concrete Headwall8/1/1999Drop Inlets8/1/1999Concrete and Metal Pipe Culverts Sheet 1 of 39/1/2001Concrete and Metal Pipe Culverts Sheet 2 of 39/26/2001Concrete and Metal Pipe Culverts Sheet 3 of 39/26/2001Catch Basins (For use with 6'' mountable curb and gutter.)12/1/1985Catch Basins - For use with Curb (6'' mountable) and Gutter (In sags or low points)12/1/1985Flared End Sections for Pipes.6/9/2006Safety End Section (Concrete) (for Side Drain pipe-or Storm Drain Pipe Parallel toMainline) (Sheet 3 of 3)Inlet Headwall - Outlet Headwall.Pavement Patching Details (Storm Drain or Utility Installations by Open Cut AcrossExisting Pavement)Median Drop Inlet (Precast or Built-in-Place) and Concrete Apron1/28/200510/1/19998/1/19994/17/1996Isometric Views of Side Road or Drive Flare Detail at Bridge ends8/18/1995Junction Boxes (Precast or Built-in-Place) Pipe Collars, Pipe Elbow and Pipe Curved Alignment 7/1/1985Traffic Control General Notes, Standard Legend, and Miscellaneous Details3/30/2006Traffic Control Detail for Lane Closure on Six-Lane Divided Highway9/4/2007ConstructionDetailsD-1D-3M-3AM-3BT11aT12aT12bT-13AT13bT13cT14T15cMedian Drain Drop InletMedian Drop Inlet Special DesignMedian CrossoversType B, 32' Median CrossoverDETAILS OF PAVEMENT MARKING PLACEMENT ON NON-LIMITED ACCESS ROADWAYDETAILS OF PAVEMENT MARKING ARROW LOCATIONDETAILS OF PAVEMENT MARKINGS - ARROWSDETAILS OF PAVEMENT MARKING WORDS (SHEET 1 OF 2)DETAILS OF PAVEMENT MARKING WORDS (SHEET 2 OF 2)DETAILS OF PAVEMENT MARKING WORDS PLACEMENT (SHEET 3 OF 3)DETAILS OF PAVEMENT MARKING HATCHINGDETAILS OF RAISED PAVEMENT MARKERS2/11/19882/12/19744/2/20104/2/20109/15/20161/1/200011/4/202011/4/20209/15/20169/13/201911/21/20089/22/2011DESCRIPTIONREVISION DATESGeorgia Department ofTransportationOFFICEIDCHECKED:BACKCHECKED:CORRECTED:VERIFIED:P.I. No.REVISION DATEINDEX DRAWINGST. MARY'S ROADDATE:DATE:DATE:DATE:DRAWING No.02-0001DATE$$$PfeilCTIME$$$ $PRF8$$$PENTABLE$$$DGN$GENERAL NOTESP.I. No.1. ANY DRIVEWAYS THAT ARE TO BE RECONSTRUCTED WILL BE PAVED BACK TO THE TIE IN POINT OR REQUIRED RIGHT OF WAY, WHICHEVER IS GREATER.ALL DRIVEWAYS OVER 11%. IN GRADE SHALL BE PAVED WITH CONCRETE. ALL OTHER DRIVEWAYS SHALL BE REPLACED AS FOLLOWS: ASPHALT FORASPHALT,CONCRETE FOR CONCRETE, AND ASPHALT FOR EARTH/GRAVEL DRIVES. RESIDENTIAL DRIVES SHALL BE 14 FEET WIDE AT THE THROATUNLESS NOTED OTHERWISE IN THE PLANS. COMMERCIAL DRIVES SHALL BE 24 FEET WIDE UNLESS NOTED OTHERWISE IN THE PLANS. EXISTINGDRIVEWAY LOCATIONS ARE SHOWN FROM THE BEST AVAILABLE DATA: THE CONTRACTOR SHALL CONSTRUCT DRIVEWAYS TO MATCH THE LOCATIONOF EXISTING DRIVEWAYS AT THE TIE IN POINT, IF APPLICABLE. THE CONTRACTOR SHALL OBTAIN THE APPROVAL FROM THE ENGINEER PRIOR TOMAKING ANY REVISIONS TO LOCATION, WIDTH, AND/OR NUMBER OF DRIVES TO BE CONSTRUCTED. DRIVES SHALL BE CONSTRUCTED USING:ASPHALT DRIVES:RESIDENTIAL: RECYCLED ASPH CONC. 9.5 MM SUPERPAVE, TYPE II, GP 2 ONLY. INCL. BITUM MATL & H LIME (135 LB/SY)GRADED AGGR BASE, 6 INCHCOMMERCIAL: RECYCLED ASPH. CONC. 9.5 MM SUPERPAVE, TYPE II, GP 2 ONLY. INCL. BITUM MATL & H LIME (135 LB/SY)220 LB/SY RECYCLED ASP CONC. 19 MM SUPERPAVE, GP 1 OR 2GRADED AGGR BASE, 6 INCH2. ALL EXISTING PIPE AND END TREATMENTS SHALL REMAIN UNLESS OTHERWISE NOTED ON THE PLANS OR AS DIRECTED BY THE ENGINEER. PIPE REMOVALSHALL BE INCLUDED IN THE OVERALL BID PRICE FOR THE PROJECT. ALL EXISTING CONCRETE OR STEEL PIPES THAT ARE TO BE ABANDONED AND LEFTIN PLACE SHALL BE FILLED WITH FLOWABLE FILL. THE COST OF THE FLOWABLE FILL FOR THIS PURPOSE SHALL BE INCLUDED IN THE BID PRICE FOROTHER ITEMS.3. NO SEPARATE PAYMENT SHALL BE MADE FOR THE INSTALLATION AND REMOVAL (OR FILLED WITH FLOWABLE FILL) OF REQUIRED TEMPORARY PIPE ORTEMPORARY DRAINAGE STRUCTURES. ALL COSTS ASSOCIATED WITH SUCH INSTALLATIONS, REMOVALS, AND FLOWABLE FILL SHALL BE INCLUDED INTHE COST OF GRADING COMPLETE.4. INSTALL ORANGE BARRIER FENCE (OBF) PRIOR TO CLEARING AND GRUBBING AND PRIOR TO THE INSTALLATION OF ANY PERIMETER EROSION CONTROL.5. A NOTICE OF INTENT (NOI) FOR STORM WATER DISCHARGE WILL BE REQUIRED FOR THIS PROJECT. THE DISTURBED AREA IS 14.10 ACRES.6. AT LOCATIONS WHERE NEW PAVEMENT IS TO BE PLACED ADJACENT TO EXISTING PAVEMENT, A SAWED JOINT SHALL BE PLACED TO PROVIDE A NEATLINE FOR THE CONSTRUCTION JOINT. THE COST OF ASPHALT SAWED JOINTS, WHEN REQUIRED, SHALL BE INCLUDED IN OVERALL BID PRICE OF PROJECT.7. ALL BORROW AND WASTE SITES FOR THIS PROJECT SHALL BE ENVIRONMENTALLY APPROVED PRIOR TO CONSTRUCTION ACTIVITIES OCCURRING INTHEM. ALL COMMON FILL OR EXCESS MATERIAL DISPOSED OF OUTSIDE THE PROJECT RIGHT OF WAY SHALL BE PLACED IN EITHER A PERMITTED SOLIDWASTE FACILITY, A PERMITTED INERT WASTE LANDFILL OR IN AN ENGINEERED FILL. SEE SECTION 201 OF THE STANDARD SPECIFICATIONS ANDSUPPLEMENTS THERETO FOR ADDITIONAL INFORMATION.8. THERE IS NO KNOWN SUITABLE PLACE TO BURY EXISTING BRIDGE/CONSTRUCTION DEBRIS WITHIN THE PROJECT LIMITS. THE CONTRACTOR SHALLPROVIDE AN ENVIRONMENTALLY APPROVED SITE AS SHOWN IN GA. SPECIFICATION 201 TO DISPOSE OF EXISTING BRIDGE/CONSTRUCTION DEBRIS ATNO ADDITIONAL COST.9. THE COST FOR ANY REQUIRED SHORING SHALL BE INCLUDED IN THE OVERALL BID PRICE FOR GRADING COMPLETE.10. UTILITY LOCATION WAS PERFORMED BY SUE, LEVEL B, AND SUPPLEMENTED BY UTILITY OWNER MARK-UPS.11. THE CONTRACTOR WILL BE REQUIRED TO ATTEND A PRE-CONSTRUCTION CONFERENCE WITH THE GOVERNMENTAL AGENCY IN CHARGE OFTHE PROJECT.12. THE CONTRACTOR WILL BE RESPONSIBLE FOR OBTAINING ALL REQUIRED PERMITS AND INSPECTIONS AS REQUIRED FOR APPROVAL OF THE WORKWITH THE GOVERNMENTAL AGENCY WITH JURISDICTION.13. THE CONTRACTOR WILL BE RESPONSIBLE FOR COST AND COORDINATION WITH LOCAL UTILITY COMPANIES OR AGENCIES FOR RELOCATING OF, ORCONNECTION TO, ALL EXISTING UTILITIES INCLUDING POWER AND TELEPHONE POLES AND WIRES.14. ALL ELEVATIONS ARE BASED ON DATUM, NAVD 88.15. REMOVAL AND REPLACEMENT OF UNSUITABLE SUB-GRADE MATERIAL WILL BE PAID FOR ON A CUBIC YARD BASIS IN PLACE MEASUREMENT, AT SUCHAUTHORIZED PRICE PER CUBIC YARD, AS AUTHORIZED BY THE ENGINEER.16. THE CONTRACTOR SHALL KEEP ACCURATE RECORDS FOR "AS-BUILTS" PURPOSES AND PROVIDE THIS INFORMATION TO THE ENGINEER AT THECOMPLETION OF THE PROJECT. IF THE CONTRACTOR FAILS TO FURNISH A COMPLETE ACCURATE RECORD, THE ENGINEER WILL OBTAIN THENECESSARY INFORMATION AND CHARGE THE CONTRACTOR FOR THE SERVICES. THE ENGINEER WILL REVIEW AS-BUILTS PROVIDED BY THECONTRACTOR FOR ACCURACY. "AS BUILT" INFORMATION WILL INCLUDE, BUT IS NOT LIMITED TO THE FOLLOWING: ALL UTILITIES INCLUDING INVERTS,TOP ELEVATIONS, PIPE ELEVATIONS, PIPE LENGTHS AND TYPE OF MATERIAL; SPOT ELEVATIONS ON FORCE MAINS AND WATER LINES. THE DISTANCEOF THE CENTERLINE OF UTILITIES FROM A PERMANENT STRUCTURE. ALL VALVE MANHOLES AND VALVE BOXES SHALL BE LOCATED WITH RESPECT TOA PERMANENT STRUCTURE. GRADES SHALL BE CONFIRMED ON ALL PROPOSED ROADS, PARKING AREAS AND SWALES TO SHOW DIRECTION OF STORMWATER FLOW.17. ALL NEW DISTURBED AREAS WILL BE GRASSED BY SODDING IN ACCORDANCE WITH GEORGIA D.O.T. STANDARDS SPECIFICATIONS, ANDAS DIRECTED BY THE ENGINEER. SOD TYPE SHALL BE BAHIA.18. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING AND MAINTAINING ALL EROSION CONTROL MEASURES/BMPS (BEST MANAGEMENT PRACTICES)IN ACCORDANCE WITH STATE AND LOCAL REQUIREMENTS/LIA(LOCAL ISSUING AUTHORITY).19. CONTRACTOR SHALL PROVIDE DUST CONTROL OF ALL DISTURBED AREAS BY USE OF WATER AND FASTGROWING, TEMPORARY VEGETATIVE GRASSESON ALL STOCKPILED SOILS.20. CONTRACTOR WILL PROVIDE A CONSTRUCTION SCHEDULE TO INCLUDE ALL EROSION AND SEDIMENT CONTROL MEASURES/BMPS.21. CONTRACTOR SHALL PROVIDE AND MAINTAIN CRUSHED STONE 6" THICK, 20' WIDE AND 50' DEEP AT ALL CONSTRUCTION EXITS TO MINIMIZE THESPREAD OF SOIL FROM EXITING THE SITE BY VEHICULAR WHEELS.22. ALL EXISTING DITCHES AND INLETS SUBJECT TO STORM WATER RUN-OFF FROM THE SITE AND ALL NEW INLETS SHALL BE PROTECTED WITH INLETPROTECTION BARRIERS TO MINIMIZE SOIL TRANSPORT OFF SITE BY STORM WATERS.23. ALL MATERIAL AND INSTALLATION PRACTICES ASSOCIATED WITH THE CONSTRUCTION OF THIS PROJECT SHALL MEET THE CURRENT REQUIREMENTSOF GDOT SPECIFICATIONS AND THE CITY OF ST. MARY'S.24. TESTING - THE CONTRACTOR IS TO PROVIDE ALL DOCUMENTATION ON ALL TESTING (INCLUDING BUT NOT LIMITED TO THE TESTING LAB) AS REQUIREDIN THE SPECIFICATIONS TO THE ENGINEER.25. THE CONTRACTOR SHALL DAILY INSPECT SITE TO PROVIDE POSITIVE DRAINAGE. THE CONTRACTOR, AT HIS/HER OWN COST, SHALL GRADE SITE ANDPROVIDE NECESSARY TEMPORARY DRAINAGE SWALES TO INSURE THAT STORM WATER DOES NOT POND ON SITE.26. ALL WATER USED FOR CONSTRUCTION SHALL BE METERED THROUGH AN APPROVED BACK-FLOW PREVENTION DEVICE AND FIRE HYDRANT METEREDOBTAINED FROM THE CITY OF ST. MARYS CONVEYANCE AND DISTRIBUTION DEPARTMENT.27. ANY AND ALL UTILITY CROSSINGS FOR WATER MAINS BETWEEN STORM OR SEWER PIPING SHOULD BEDOWN AND UP AND RESTRAINED.ACCOMPLISHED BY USE OF 45° BENDS BOTH28. ALL KNOWN UTILITY FACILITIES ARE SHOWN SCHEMATICALLY ON THE PLANS AND ARE NOT NECESSARILY ACCURATE AS TO PLAN OR ELEVATION.UTILITY FACILITIES SUCH AS SERVICE LINES OR UNKNOWN FACILITIES NOT SHOWN ON THE PLANS WILL NOT RELIEVE THE CONTRACTOR OF HIS/HERRESPONSIBILITIES EXCEPT AS NOTED BELOW. THE CONTRACTOR WILL NOT BE RESPONSIBLE FOR THE COST OF REPAIRS TO DAMAGED UTILITYFACILITIES OTHER THAN SERVICE LINES FROM STREET MAINS TO ABUTTING PROPERTY WHEN SUCH FACILITIES ARE NOT SHOWN ON THE PLANS ANDTHEIR EXISTENCE IS UNKNOWN TO THE CONTRACTOR PRIOR TO THE DAMAGES OCCURRING PROVIDING THE ENGINEER DETERMINES THE CONTRACTORHAS OTHERWISE FULLY COMPLIED WITH THE SPECIFICATIONS.29. CONTRACTOR(S) SHALL VERIFY THE LOCATION OF ALL UNDERGROUND UTILITIES. CONTRACTOR(S) ARE RESPONSIBLE FOR LOCATING, PROTECTING,REPAIRING AND REPLACING ANY AND ALL UNDERGROUND UTILITIES DURING ALL PHASES OF CONSTRUCTION. A DILIGENT EFFORT HAS BEEN MADETO LOCATE ALL ABOVEGROUND AND BELOW GROUND UTILITIES BUT CANNOT GUARANTEE THAT ALL PRESENT UTILITIES HAVE BEEN IDENTIFIED.CONTRACTOR SHALL CALL UTILITY PROTECTION CENTER (1-800-282-7411) AT LEAST 3 DAYS PRIOR TO DIGGING UNTIL ALL UNDERGROUND UTILITYLOCATIONS ARE COMPLETE.30. ALL DEMOLITION DEBRIS SHALL BE PROPERLY DISPOSED OFFSITE AT THE CONTRACTOR'S EXPENSE.31. A CONTINUOUS RUN OF PLASTICIZED METALLIC TAPE SHALL BE INSTALLED ABOVE THE TOP OF PVC PIPE USED FOR GRAVITY SEWER AND FORCEMAINS AT APPROXIMATELY 30" BELOW FINISHED GRADE. THE TAPE SHALL BE SUITABLE FOR DETECTION WITH METAL PIPE LOCATION EQUIPMENT,COLOR CODED AND LABELED TO IDENTIFY CONTENTS OF THE PIPE AND CONNECTED TO MANHOLE RINGS. ON PIPE RUNS GREATER THAN 500'. THETRACER WIRE SHALL BE ATTACHED TO A 2" GALVANIZED PIPE WITH A 180 DEGREE BEND AT THE TOP EXTENDING 36" ABOVE GRADE FORCONNECTION TO LOCATION EQUIPMENT. THE MAXIMUM DISTANCE BETWEEN 2" PIPE STUBS SHALL BE 500'.32. A CONTINUOUS RUN OF PLASTICIZED METALLIC TAPE SHALL BE INSTALLED ABOVE THE TOP OF PVC PIPE USED FOR WATER MAINS AT APPROXIMATELY18" TO 24" BELOW FINISHED GRADE. THE TAPE SHALL BE SUITABLE FOR DETECTION WITH METAL PIPE LOCATION EQUIPMENT, COLOR CODED ANDLABELED TO IDENTIFY CONTENTS OF THE PIPE AND BRIGHTLY COLORED TO CONTRAST WITH THE SOIL. IN ADDITION TO THE TAPE, A CONTINUOUSRUN OF TRACER WIRE SHALL BE ATTACHED TO THE PIPE AND CONNECTED TO CURB STOPS AND BROUGHT TO TOP OF VALVE. ON PIPE RUNS GREATERTHAN 500', THE TRACER WIRE SHALL BE ATTACHED TO A 2" GALVANIZED PIPE WITH A 180 DEGREE BEND AT THE TOP, EXTENDING 36" ABOVE GRADE FORCONNECTION TO LOCATOR EQUIPMENT. THE MAXIMUM DISTANCE BETWEEN 2" PIPE STUBS SHALL BE 500'.33. TRACER WIRE SHALL BE REQUIRED ON ALL STORM PIPE.34. THE CONTRACTOR SHALL HAVE APPROVED PLANS ON SITE AT ALL TIMES DURING LAND DISTURBING ACTIVITIES.35. THE CONTRACTOR SHALL HAVE A CERTIFIED EROSION AND SEDIMENTATION CONTROL INSPECTOR ON SITE AT ALL TIMES DURING LAND DISTURBINGACTIVITIES.36. AN APPROVED WATER SUPPLY FOR FIRE PROTECTION, EITHER TEMPORARY OR PERMANENT, SHALL BE MADE AVAILABLE AS SOON ASCOMBUSTIBLE MATERIAL ARRIVES ON SITE.37. SUB-GRADE WILL BE COMPACTED FOR A DEPTH OF 24" EXTENDING 24" BEYOND PAVEMENT EDGES, TO A MINIMUM OF 100% STANDARD PROCTORDENSITY AS MEASURED A.A.S.H.D. METHOD T-99.38. FOR CITY WATER AND SANITARY SEWER LINE LOCATIONS, CONTRACT THE UTILITIES PROTECTION CENTER (1-800-282-7411) A MINIMUM OFSEVENTY-TWO (72) HOURS PRIOR TO DIGGING.39. ALL SIGNS, MAILBOXES, SHRUBBERY, FENCES, LANDSCAPING OR EXISTING STRUCTURES INTERFERING WITH CONSTRUCTION SHALL BE REMOVEDAND REPLACED BY THE CONTRACTOR AT THE CONTRACTOR'S EXPENSE.40. FIRE DEPARTMENT NOTE: IF CLEARING AND GRADING LEADS TO ON SITE BURNING, A COMMERCIAL BURN PERMIT ISSUED BY THE CITY OFST. MARYS FIRE MARSHALL'S OFFICE IS REQUIRED.GPLN-CE11/05/2020Georgia Department ofTransportationOFFICEIDREVISION DATESCHECKED:BACKCHECKED:CORRECTED:VERIFIED:GENERAL NOTESST. MARY'S ROADDATE:DATE:DATE:DATE:DRAWING No.04-0001DATE$$$PfeilCGPLN-CE11/05/2020TIME$$$ $PRF8$$$PENTABLE$$$DGN$Typical Section1 [Sheet]Mill & Overlay12'Travel Lane24'12'Travel Lane6'Shoulder2'BLVariesVariesWidening6'Shoulder12'Turn LaneVariesGore2'OverbuildMill & Overlay24'12'Travel Lane12'Travel Lane2%2%GADOTLOWNDES2%GADOTLOWNDES2%AFFULL DEPTH PAVEMENT SECTIONA RECYCLED ASPHALT/C CONCRETE. 9.5 mm SUPERPAVE,GP 2 ONLY, INCL BITUM MATL & H-LIME 135 LBS/SY (1.25")B RECYCLED ASPHALT/C CONCRETE, 19 mm SUPERPAVE,GROUP I OR 2, INCL BITUM MATL & H-LIME 220 LBS/SY (2")C RECYCLED ASPHALT/C CONCRETE, 25 mm SUPERPAVE,GROUP I OR 2, INCL BITUM MATL & H-LIME 550 LBS/SY (5")D GRADED AGGR. BASE 10"E RECYCLED ASPHALT CONCRETE OVERBUILD,INCL BITUM MATL & H-LIME, AS REQUIREDF MILLING (1.25")AABBCCDDAAEFTANGENT SECTION 1MILL & OVERLAY / WIDEN(D.S. 55mph)STA. 5+74.16 TO STA. 17+50.00BLWidening6'Shoulder2'12'Turn LaneMill & Overlay12'Travel Lane24'12'Travel LaneVariesWideningVaries12'Turn LaneMill & Overlay6'Shoulder2'6'Shoulder24'12'Travel Lane12'Travel LaneVariesWidening6'Shoulder2'2%2%2%GADOTLOWNDES2%2%2%AAABBFCCDDAAFBCDTANGENT SECTION 2MILL & OVERLAY / WIDEN(D.S. 55mph)STA. 17+50.00 TO STA. 27+06.91P.I. No.Georgia Department ofTransportationDISTURBED AREAS TO BE SODDED PER GDOT REQUIREMENTSREVISION DATESCHECKED:BACKCHECKED:CORRECTED:VERIFIED:TYPICAL SECTIONST. MARY'S ROADDATE:DATE:DATE:DATE:DRAWING No.05-0001DATE$$$PfeilCGPLN-CE11/05/2020TIME$$$ $PRF8$$$PENTABLE$$$DGN$Typical Section3 [Sheet]Mill & Overlay12'Travel Lane24'12'Travel Lane6'Shoulder2'BLVaries6'Shoulder2'12'Turn LaneVariesWideningVariesGoreOverbuildMill & Overlay12'Travel Lane24'12'Travel LaneWidening12'Turn Lane6'Shoulder2'P.I. No.AFFULL DEPTH PAVEMENT SECTIONA RECYCLED ASPHALT/C CONCRETE. 9.5 mm SUPERPAVE,GP 2 ONLY, INCL BITUM MATL & H-LIME 135 LBS/SY (1.25")B RECYCLED ASPHALT/C CONCRETE, 19 mm SUPERPAVE,GROUP I OR 2, INCL BITUM MATL & H-LIME 220 LBS/SY (2")C RECYCLED ASPHALT/C CONCRETE, 25 mm SUPERPAVE,GROUP I OR 2, INCL BITUM MATL & H-LIME 550 LBS/SY (5")D GRADED AGGR. BASE 10"E RECYCLED ASPHALT CONCRETE OVERBUILD,INCL BITUM MATL & H-LIME, AS REQUIREDF MILLING (1.25")2%ABCD2%2%GADOTLOWNDES2%ABCDTANGENT SECTION 5MILL & OVERLAY / WIDEN(D.S. 55mph)STA. 73+82.96 TO STA. 85+00.002%AEGADOTLOWNDES2%AF2%GADOTLOWNDESABCDVariesWidening6'Shoulder2'12'Turn LaneVariesMill & Overlay24'12'Travel Lane12'Travel LaneBLVariesVariesWideningVariesGore12'Turn Lane6'Shoulder2'6'ShoulderMill & Overlay24'12'Travel Lane12'Travel Lane6'Shoulder2'6%4:14:16%ABCD2%2%AF2%2%ABCDTANGENT SECTION 6MILL & OVERLAY / WIDEN(D.S. 55mph)STA. 85+00.00 TO STA. 95+45.80Georgia Department ofTransportationGADOTLOWNDESAF2%ABCD6%4:1DISTURBED AREAS TO BE SODDED PER GDOT REQUIREMENTSREVISION DATESCHECKED:BACKCHECKED:CORRECTED:VERIFIED:TYPICAL SECTIONST. MARY'S ROADDATE:DATE:DATE:DATE:DRAWING No.05-0003
- Commodity Codes
-
- NAICS 237310Highway, Street, and Bridge Construction
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Insulation - Installation at ...
Event ID Event Title Government Entity Start Date (ET) End Date (ET) PE-66203-NONST-2026-000000019
State Government of Georgia
Bid Due: 7/09/2026
26-055-LH JEFFERSONVILLE ROAD...
Event ID Event Title Government Entity Start Date (ET) End Date (ET) PE-61100-NONST-2026-000000128
State Government of Georgia
Bid Due: 7/16/2026