Request for Prequalification of Electrical Contractors and Subcontractors for Selected EBMUD Projects

Project Information

Bid Title
Request for Prequalification of Electrical Contractors and Subcontractors for Selected EBMUD Projects
Issuing Agency
East Bay Municipal Utility District
Location
California
Published Date
Dec 18, 2024
Closing Date
Dec 31, 2025
Government Level
State & Local
Status
Closed
Original Source
Join to Access Full Details
Project Description

Request for Prequalification of Electrical Contractors and Subcontractors for Selected EBMUD Projects

[Sign In] Current Construction Bid Opportunities
Title: Request for Prequalification of Electrical Contractors and Subcontractors for Selected EBMUD Projects
Specification Number: 0B
Bid Walk:
Project Engineer:
Bid Opening Date: Wednesday, December 31, 2025, 4:00 PM
Estimated Cost:
Description: *For those renewing prequalification, the existing PDF package on the webpage may be downloaded and completed for submittal.*

Notice is hereby given that all electrical contractors and subcontractors that intend to submit a bid for performance of the identified electrical work listed below on East Bay Municipal Utility District (EBMUD) projects are required to complete the prequalification questionnaire, provide all requested materials, and be approved by EBMUD to be on the final qualified bidders list.

Bids that include an electrical contractor or subcontractor (hereinafter referred to as "Contractor") of any tier that has failed to comply with these requirements will be rejected as nonresponsive. If two or more business entities expect to perform the identified electrical work as part of a Joint Venture, each entity within the Joint Venture must be prequalified in order to qualify for bidding.

Contractors on the final qualified electrical bidders list will be eligible to bid on the selected projects identified in Appendix A. Projects identified in Appendix A are anticipated to be awarded in the near future, and are provided as examples of the types of projects that will use the list. Not all EBMUD projects will require the usage of this list. Electrical Contractor prequalification, if required for a specific project, will be identified in the Instructions to Bidders of the specifications for the project.

To view the full details, please see the "Download the Prequal Document HERE" link on the left. Please note the "Request a Bid Set" link is not available and hard copies of the document will not be provided.
Request a Bid Set
Download the Prequal Document HERE
Plan Holders List
Questions and Answers
Bid Walk Sign-In Sheet
Bid Walk Location Map
Bid Results
Construction Documents
Specifications
Plans - PDF

For more
information, please contact the Specifications Section .
Attachment Preview
Request for Prequalification
of
Electrical Contractors and
<BSubcontractors
for
SELECTED
EBMUD PROJECTS
EBMUD
November 16, 2020
TABLE OF CONTENTS
Page No.
NOTICE TO CONTRACTORS ...................................................................................................... i
SECTION 1 INSTRUCTIONS FOR PREQUALIFICATION SUBMITTALS ............................ 1
1.1 DELIVERY OF SUBMITTAL ........................................................................................ 1
1.2 PREPARATION OF SUBMITTAL ................................................................................ 1
1.3 WITHDRAWAL OF SUBMITTAL ................................................................................ 2
1.4 LATE SUBMITTAL........................................................................................................ 2
1.5 PROJECT INFORMATION ............................................................................................ 2
1.6 INTERPRETATION OF INFORMATION ..................................................................... 2
1.7 DETERMINATION......................................................................................................... 3
1.8 EXCLUSION OF COST QUOTATIONS........................................................................ 3
SECTION 2 SCOPE OF PREQUALIFICATION .............................................................................4
2.1 INTENT ........................................................................................................................... 4
2.2 EXPERIENCE REQUIREMENT .................................................................................... 4
SECTION 3 SUBMITTAL INFORMATION....................................................................................5
3.1 GENERAL ....................................................................................................................... 5
PREQUALIFICATION SUBMITTAL FORM ...................................................................... 6
PART I. ESSENTIAL REQUIREMENTS FOR QUALIFICATION.............................. 7
PART II. ORGANIZATION, HISTORY, ORGANIZATIONAL PERFORMANCE,
COMPLIANCE WITH CIVIL AND CRIMINAL LAWS................................ 9
PART III. RECENT CONSTRUCTION PROJECTS COMPLETED ............................. 19
CONTRACTOR EXPERIENCE AND REFERENCES FORM .......................................... 20
SECTION 4 BASIS OF DETERMINATION.............................................................................. 21
4.1 GENERAL ..................................................................................................................... 21
4.2 RESPONSIVENESS ...................................................................................................... 21
4.3 CAPABILITY ................................................................................................................ 21
APPENDIX A – PROJECT DESCRIPTIONS
APPENDIX B – CONTRACTOR PREQUALIFICATION SCORING
NOTICE TO CONTRACTORS
Notice is hereby given that all electrical contractors and subcontractors that intend to submit a bid
for performance of the identified electrical work listed below on East Bay Municipal Utility
District (EBMUD) projects are required to complete the prequalification questionnaire, provide all
requested materials, and be approved by EBMUD to be on the final qualified bidders list.
Bids that include an electrical contractor or subcontractor (hereinafter referred to as “Contractor”)
of any tier that has failed to comply with these requirements will be rejected as nonresponsive. If
two or more business entities expect to perform the identified electrical work as part of a Joint
Venture, each entity within the Joint Venture must be prequalified in order to qualify for bidding.
Contractors on the final qualified electrical bidders list will be eligible to bid on the selected
projects identified in Appendix A. Projects identified in Appendix A are anticipated to be awarded
in the near future, and are provided as examples of the types of projects that will use the list. Not
all EBMUD projects will require the usage of this list. Electrical Contractor prequalification, if
required for a specific project, will be identified in the Instructions to Bidders of the specifications
for the project.
Bidding Period
If a contractor wishes to submit during the initial prequalification period, applications must be
received by the time and date listed in the Submission of Prequalification Package section below.
After the initial prequalification period, applications may be submitted during the continuously
open period.
Identified Electrical Project Work
Identified projects are those projects in which electrical Contractors will perform construction of
industrial electrical power distribution and control systems at water and wastewater facilities, and
the delivery, storage, handling, installation, and testing and commissioning of equipment which
include, but are not limited to, any of the following:
Anchors, fasteners, hangers and supports for the electrical equipment
Outlet boxes, junction and pull boxes
Wiring devices (including wall switches, receptacles, device plates)
Low and medium voltage fused and non-fused disconnect switches
Exposed and concealed raceways (including rigid steel conduit, PVC coated rigid steel conduit,
liquid-tight flexible steel conduit, PVC schedule 40 conduit, wireways, cable trays)
Low voltage and medium voltage shielded power cable, shielded instrumentation cable
Permanent and temporary electric power and communication services
Low and medium voltage electric motors and motor controllers
Fiber optic cables and accessories (terminations, splices, patch panels)
Fire alarm systems
Grounding systems
Low voltage switchboards
Low and medium voltage motor control centers
Electrical Contractors and Subcontractors
Request for Prequalification
i
11/16/2020
Low and medium voltage generator sets and auxiliaries (including starting batteries, load
banks, fuel monitoring systems)
Low voltage panelboards
Busways
Low voltage dry-type and medium voltage dry-type and liquid-filled transformers
Low voltage uninterruptible power supplies
Photovoltaic power systems (including PV panels, combiner boxes, and inverters)
Low voltage and medium-voltage metal-clad switchgear
Indoor and exterior LED based lighting systems and controls
Emergency lighting and exit signs
Underground nonmetallic concrete encased duct banks and direct buried raceways
Protective devices (including low and medium voltage fuse and circuit breakers, protective
relays)
Local control panels (including remote telemetry units, programmable logic controllers, human
machine interfaces, Ethernet switches, DC power supplies, control relays, selector switches,
indicating lights, pushbuttons)
Security system components (including interior and exterior pan-tilt-zoom closed circuit
television cameras and controllers , card readers, infrared beam transmitters and receivers,
intercoms, motorized gate operators, door alarm switches)
Wireless 900 MHz spread spectrum radio telemetry systems
Low and medium voltage variable frequency drives (VFD)
Low and medium voltage reduced voltage solid state motor starters
Direct current battery systems (including battery chargers and monitoring equipment
Capacitors and line reactors
Underground manholes and pullboxes
Overhead power distribution and communications cables and poles
Automatic and manual transfer switches
Perform harmonic testing
Perform international electrical testing association (NETA) Acceptance Testing Standards,
including testing for all electrical equipment
Process control and instrumentation (including pressure, level, flow, and vibration sensors,
transmitters, and switches; and water quality analyzers)
Pipeline cathodic protection systems and corrosion monitoring systems
A copy of the Request for Prequalification of Electrical Contractors and Subcontractors, along
with any addenda to this document, and questions and answers, will be posted on the EBMUD
Current Construction Bids Opportunities webpage, under “Request for Prequalification of
Electrical Contractors and Subcontractors for Selected EBMUD Projects”
https://www.ebmud.com/business-center/construction-bids/current-construction-bids. It is the
responsibility of the bidder to frequently check the website for updated information.
The current Prequalified Electrical Contractors List will be included as part of the Contract
Documents of the project requiring usage of the list.
Basis of Rating
Electrical Contractors and Subcontractors
Request for Prequalification
ii
11/16/2020
EBMUD will provide a pass/fail score for each contractor based on responses to questions
contained in the attached questionnaire. EBMUD reserves the right to check other sources
available and contact listed references. EBMUD’s decision will be based on objective evaluation
criteria.
Contractor must demonstrate ability to perform installation work in accordance with the
California Electrical Code (CEC) and in a neat and workmanlike manner in accordance with
National Electrical Contractors Association (NECA) Standards.
See Section 4 – Basis of Determination and Appendix B – Contractor Prequalification Scoring for
additional information on scoring criteria.
Prequalification Approval
Prequalification approval will be valid for one calendar year after the date of Contractor
notification. However, EBMUD reserves the right to adjust, limit, suspend or rescind the
prequalification rating based on subsequently learned information. Prequalified Contractors whose
rating changes sufficiently to disqualify them will be notified and given an opportunity to appeal a
prequalification rating consistent with the appeal procedures described below.
The intent of the prequalification questionnaire and documents is to allow the District to identify
qualified contractors prior to contract award to aid EBMUD in selecting the lowest responsive,
responsible bidder. Neither the fact of prequalification nor any prequalification rating will
preclude EBMUD from a post-bid consideration and determination of whether a bidder or its
subcontractors have the quality, fitness, capacity and experience to satisfactorily perform the
proposed work.
Submission of Prequalification Package
If submitting during the initial prequalification period, the submittal must be received by Wednesday
4:00PM, December 30, 2020.
Contractors may submit an application at any time after the initial prequalification period. However,
if submitting for a specific EBMUD project, the submittal must be received at least 21 calendar
days before the initial bid opening date. EBMUD will make its best efforts to review the
completed submittal upon receipt, but makes no guarantee a determination will be made in time for
bid submittal on the specified project. See the Instructions to Bidders of the specific project for more
information.
See Section 1 – Instructions for Prequalification Submittals for detailed submission instructions.
Each questionnaire must be signed under penalty of perjury by an individual who has the legal
authority to bind the contractor on whose behalf that person is signing. If any information
provided by a contractor becomes inaccurate, the contractor must immediately notify EBMUD
and provide updated accurate information in writing, under penalty of perjury.
EBMUD reserves the right to waive minor irregularities and omissions in the information
contained in the prequalification application submitted, to determine at any time that the
prequalification procedures will not be applied to a specific future public works project, and to
make all final determinations.
Electrical Contractors and Subcontractors
Request for Prequalification
iii
11/16/2020
Commodity Codes
  • NAICS 236220Commercial and Institutional Building Construction
  • NAICS 238210Electrical Contractors and Other Wiring Installation Contractors
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.

Government Bids

Empower Your Bidding Strategy

Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.

  • Access an extensive database of bids, including comprehensive local and state opportunities.
  • Receive customized alerts for the bids that matter most to your business.
  • Explore detailed specifications to ensure precise and competitive submissions.
  • Gain a competitive edge with up-to-date information and exclusive opportunities.

See Also

Southeast Water Pollution Con...

Bid Details RFP for DB-140 Southeast Water Pollution Control Plant - Secondary Clarifiers

San Francisco Public Utilities Commission

Bid Due: 8/05/2026

TEC Modernization Addition

Project: TEC Modernization Addition Ref. #: 2026-1683 Type: ITB Status: Open Open Date:

Alameda-Contra Costa Transit District

Bid Due: 7/21/2026