Request for Prequalification of Electrical Contractors and Subcontractors for Selected EBMUD Projects
Project Information
- Bid Title
- Request for Prequalification of Electrical Contractors and Subcontractors for Selected EBMUD Projects
- Issuing Agency
- East Bay Municipal Utility District
- Location
- California
- Published Date
- Dec 18, 2024
- Closing Date
- Dec 31, 2025
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Request for Prequalification of Electrical Contractors and Subcontractors for Selected EBMUD Projects
[Sign In] Current Construction Bid OpportunitiesTitle: Request for Prequalification of Electrical Contractors and Subcontractors for Selected EBMUD Projects Specification Number: 0B Bid Walk: Project Engineer: Bid Opening Date: Wednesday, December 31, 2025, 4:00 PM Estimated Cost: Description: *For those renewing prequalification, the existing PDF package on the webpage may be downloaded and completed for submittal.*
Notice is hereby given that all electrical contractors and subcontractors that intend to submit a bid for performance of the identified electrical work listed below on East Bay Municipal Utility District (EBMUD) projects are required to complete the prequalification questionnaire, provide all requested materials, and be approved by EBMUD to be on the final qualified bidders list.
Bids that include an electrical contractor or subcontractor (hereinafter referred to as "Contractor") of any tier that has failed to comply with these requirements will be rejected as nonresponsive. If two or more business entities expect to perform the identified electrical work as part of a Joint Venture, each entity within the Joint Venture must be prequalified in order to qualify for bidding.
Contractors on the final qualified electrical bidders list will be eligible to bid on the selected projects identified in Appendix A. Projects identified in Appendix A are anticipated to be awarded in the near future, and are provided as examples of the types of projects that will use the list. Not all EBMUD projects will require the usage of this list. Electrical Contractor prequalification, if required for a specific project, will be identified in the Instructions to Bidders of the specifications for the project.
To view the full details, please see the "Download the Prequal Document HERE" link on the left. Please note the "Request a Bid Set" link is not available and hard copies of the document will not be provided.Request a Bid Set
Download the Prequal Document HERE
Plan Holders List
Questions and Answers
Bid Walk Sign-In Sheet
Bid Walk Location Map
Bid Results
Construction Documents
Specifications
Plans - PDF
- Attachment Preview
-
Request for PrequalificationofElectrical Contractors and<BSubcontractorsforSELECTEDEBMUD PROJECTSEBMUDNovember 16, 2020TABLE OF CONTENTSPage No.NOTICE TO CONTRACTORS ...................................................................................................... iSECTION 1 INSTRUCTIONS FOR PREQUALIFICATION SUBMITTALS ............................ 11.1 DELIVERY OF SUBMITTAL ........................................................................................ 11.2 PREPARATION OF SUBMITTAL ................................................................................ 11.3 WITHDRAWAL OF SUBMITTAL ................................................................................ 21.4 LATE SUBMITTAL........................................................................................................ 21.5 PROJECT INFORMATION ............................................................................................ 21.6 INTERPRETATION OF INFORMATION ..................................................................... 21.7 DETERMINATION......................................................................................................... 31.8 EXCLUSION OF COST QUOTATIONS........................................................................ 3SECTION 2 SCOPE OF PREQUALIFICATION .............................................................................42.1 INTENT ........................................................................................................................... 42.2 EXPERIENCE REQUIREMENT .................................................................................... 4SECTION 3 SUBMITTAL INFORMATION....................................................................................53.1 GENERAL ....................................................................................................................... 5PREQUALIFICATION SUBMITTAL FORM ...................................................................... 6PART I. ESSENTIAL REQUIREMENTS FOR QUALIFICATION.............................. 7PART II. ORGANIZATION, HISTORY, ORGANIZATIONAL PERFORMANCE,COMPLIANCE WITH CIVIL AND CRIMINAL LAWS................................ 9PART III. RECENT CONSTRUCTION PROJECTS COMPLETED ............................. 19CONTRACTOR EXPERIENCE AND REFERENCES FORM .......................................... 20SECTION 4 BASIS OF DETERMINATION.............................................................................. 214.1 GENERAL ..................................................................................................................... 214.2 RESPONSIVENESS ...................................................................................................... 214.3 CAPABILITY ................................................................................................................ 21APPENDIX A – PROJECT DESCRIPTIONSAPPENDIX B – CONTRACTOR PREQUALIFICATION SCORINGNOTICE TO CONTRACTORSNotice is hereby given that all electrical contractors and subcontractors that intend to submit a bidfor performance of the identified electrical work listed below on East Bay Municipal UtilityDistrict (EBMUD) projects are required to complete the prequalification questionnaire, provide allrequested materials, and be approved by EBMUD to be on the final qualified bidders list.Bids that include an electrical contractor or subcontractor (hereinafter referred to as “Contractor”)of any tier that has failed to comply with these requirements will be rejected as nonresponsive. Iftwo or more business entities expect to perform the identified electrical work as part of a JointVenture, each entity within the Joint Venture must be prequalified in order to qualify for bidding.Contractors on the final qualified electrical bidders list will be eligible to bid on the selectedprojects identified in Appendix A. Projects identified in Appendix A are anticipated to be awardedin the near future, and are provided as examples of the types of projects that will use the list. Notall EBMUD projects will require the usage of this list. Electrical Contractor prequalification, ifrequired for a specific project, will be identified in the Instructions to Bidders of the specificationsfor the project.Bidding PeriodIf a contractor wishes to submit during the initial prequalification period, applications must bereceived by the time and date listed in the Submission of Prequalification Package section below.After the initial prequalification period, applications may be submitted during the continuouslyopen period.Identified Electrical Project WorkIdentified projects are those projects in which electrical Contractors will perform construction ofindustrial electrical power distribution and control systems at water and wastewater facilities, andthe delivery, storage, handling, installation, and testing and commissioning of equipment whichinclude, but are not limited to, any of the following:• Anchors, fasteners, hangers and supports for the electrical equipment• Outlet boxes, junction and pull boxes• Wiring devices (including wall switches, receptacles, device plates)• Low and medium voltage fused and non-fused disconnect switches• Exposed and concealed raceways (including rigid steel conduit, PVC coated rigid steel conduit,liquid-tight flexible steel conduit, PVC schedule 40 conduit, wireways, cable trays)• Low voltage and medium voltage shielded power cable, shielded instrumentation cable• Permanent and temporary electric power and communication services• Low and medium voltage electric motors and motor controllers• Fiber optic cables and accessories (terminations, splices, patch panels)• Fire alarm systems• Grounding systems• Low voltage switchboards• Low and medium voltage motor control centersElectrical Contractors and SubcontractorsRequest for Prequalificationi11/16/2020• Low and medium voltage generator sets and auxiliaries (including starting batteries, loadbanks, fuel monitoring systems)• Low voltage panelboards• Busways• Low voltage dry-type and medium voltage dry-type and liquid-filled transformers• Low voltage uninterruptible power supplies• Photovoltaic power systems (including PV panels, combiner boxes, and inverters)• Low voltage and medium-voltage metal-clad switchgear• Indoor and exterior LED based lighting systems and controls• Emergency lighting and exit signs• Underground nonmetallic concrete encased duct banks and direct buried raceways• Protective devices (including low and medium voltage fuse and circuit breakers, protectiverelays)• Local control panels (including remote telemetry units, programmable logic controllers, humanmachine interfaces, Ethernet switches, DC power supplies, control relays, selector switches,indicating lights, pushbuttons)• Security system components (including interior and exterior pan-tilt-zoom closed circuittelevision cameras and controllers , card readers, infrared beam transmitters and receivers,intercoms, motorized gate operators, door alarm switches)• Wireless 900 MHz spread spectrum radio telemetry systems• Low and medium voltage variable frequency drives (VFD)• Low and medium voltage reduced voltage solid state motor starters• Direct current battery systems (including battery chargers and monitoring equipment• Capacitors and line reactors• Underground manholes and pullboxes• Overhead power distribution and communications cables and poles• Automatic and manual transfer switches• Perform harmonic testing• Perform international electrical testing association (NETA) Acceptance Testing Standards,including testing for all electrical equipment• Process control and instrumentation (including pressure, level, flow, and vibration sensors,transmitters, and switches; and water quality analyzers)• Pipeline cathodic protection systems and corrosion monitoring systemsA copy of the Request for Prequalification of Electrical Contractors and Subcontractors, alongwith any addenda to this document, and questions and answers, will be posted on the EBMUDCurrent Construction Bids Opportunities webpage, under “Request for Prequalification ofElectrical Contractors and Subcontractors for Selected EBMUD Projects”https://www.ebmud.com/business-center/construction-bids/current-construction-bids. It is theresponsibility of the bidder to frequently check the website for updated information.The current Prequalified Electrical Contractors List will be included as part of the ContractDocuments of the project requiring usage of the list.Basis of RatingElectrical Contractors and SubcontractorsRequest for Prequalificationii11/16/2020EBMUD will provide a pass/fail score for each contractor based on responses to questionscontained in the attached questionnaire. EBMUD reserves the right to check other sourcesavailable and contact listed references. EBMUD’s decision will be based on objective evaluationcriteria.Contractor must demonstrate ability to perform installation work in accordance with theCalifornia Electrical Code (CEC) and in a neat and workmanlike manner in accordance withNational Electrical Contractors Association (NECA) Standards.See Section 4 – Basis of Determination and Appendix B – Contractor Prequalification Scoring foradditional information on scoring criteria.Prequalification ApprovalPrequalification approval will be valid for one calendar year after the date of Contractornotification. However, EBMUD reserves the right to adjust, limit, suspend or rescind theprequalification rating based on subsequently learned information. Prequalified Contractors whoserating changes sufficiently to disqualify them will be notified and given an opportunity to appeal aprequalification rating consistent with the appeal procedures described below.The intent of the prequalification questionnaire and documents is to allow the District to identifyqualified contractors prior to contract award to aid EBMUD in selecting the lowest responsive,responsible bidder. Neither the fact of prequalification nor any prequalification rating willpreclude EBMUD from a post-bid consideration and determination of whether a bidder or itssubcontractors have the quality, fitness, capacity and experience to satisfactorily perform theproposed work.Submission of Prequalification PackageIf submitting during the initial prequalification period, the submittal must be received by Wednesday4:00PM, December 30, 2020.Contractors may submit an application at any time after the initial prequalification period. However,if submitting for a specific EBMUD project, the submittal must be received at least 21 calendardays before the initial bid opening date. EBMUD will make its best efforts to review thecompleted submittal upon receipt, but makes no guarantee a determination will be made in time forbid submittal on the specified project. See the Instructions to Bidders of the specific project for moreinformation.See Section 1 – Instructions for Prequalification Submittals for detailed submission instructions.Each questionnaire must be signed under penalty of perjury by an individual who has the legalauthority to bind the contractor on whose behalf that person is signing. If any informationprovided by a contractor becomes inaccurate, the contractor must immediately notify EBMUDand provide updated accurate information in writing, under penalty of perjury.EBMUD reserves the right to waive minor irregularities and omissions in the informationcontained in the prequalification application submitted, to determine at any time that theprequalification procedures will not be applied to a specific future public works project, and tomake all final determinations.Electrical Contractors and SubcontractorsRequest for Prequalificationiii11/16/2020
- Commodity Codes
-
- NAICS 236220Commercial and Institutional Building Construction
- NAICS 238210Electrical Contractors and Other Wiring Installation Contractors
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Southeast Water Pollution Con...
Bid Details RFP for DB-140 Southeast Water Pollution Control Plant - Secondary Clarifiers
San Francisco Public Utilities Commission
Bid Due: 8/05/2026
Project: TEC Modernization Addition Ref. #: 2026-1683 Type: ITB Status: Open Open Date:
Alameda-Contra Costa Transit District
Bid Due: 7/21/2026