Maintenance Faciliteis-SE Region
Project Information
- Bid Title
- Maintenance Faciliteis-SE Region
- Issuing Agency
- Ohio Facility Construction Commission
- Location
- Ohio
- Published Date
- Apr 22, 2026
- Closing Date
- Apr 30, 2026
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- DNR-260053
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Publish Date Due Date Number Owner Contractring Authority Project Name Primary Service Estimated Project Cost Q&A Short List Notes 2026/04/09 4/30/2026 DNR-260053 Ohio Department of Natural Resources Local Agency Maintenance Faciliteis-SE Region A/E $3,167,800 Q&A TBD - Attachment Preview
-
Request for Qualifications (Registered Design Professional*)State of Ohio Standard Forms and DocumentsAdministration of Project: Local AgencyProject Name Maintenance Faciliteis-SE RegionProject Location Tar Holow and Pike Lake State ParksCity / County Various / VariousOwnerOhio Depattemnt of Natural ResourcesDelivery Method General ContractingPublish Date 4/9/2026Response Deadline April 30 2026Project NumberDNR-260053Project ManagerKyle RuhaContracting Authority Local AgencyPrevailing Wages State2:00PM local timeNo. of paper copies requested (stapled, not bound)0No. of electronic copies requested (PDF)1* “Registered Design Professional includes any architect holding a certificate issued under section 4703.10 of the RevisedCode, any landscape architect holding a certificate issued under section 4703.36 of the Revised Code, or any engineerholding a certificate issued under section 4733.14 of the Revised Code.” (Ohio Building Code section 4101:1-2-01 Definitions)Submit the requested number of Statements of Qualifications (Form F110-330) directly to engineering@dnr.ohio.gov. SeeSection J of this RFQ for additional submittal instructions.Submit all questions regarding this RFQ in writing to engineering@dnr.ohio.gov with the project number included in the subjectline (no phone calls please). Questions will be answered and posted to the Opportunities page on the OFCC website athttp://ofcc.ohio.gov on a regular basis until one week before the response deadline. The name of the party submitting aquestion will not be included on the Q&A document.Project OverviewA. Project DescriptionThe Ohio Department of Natural Resources (ODNR), through the Division of Parks and Watercraft is responsible for themanagement of maintenance facilities located at properties across the State. This Request for Qualifications (RFQ) isbeing issued to obtain Professional Design (A/E) services for two new facilities required to replace aging, existingstructures to better accommodate staff, equipment and operational needs of day-to-day Park operations.This Request for Qualifications (RFQ) covers the construction of new maintenance facilities at two locations: Pike LakeState Park in Bainbridge, Pike County, and Tar Hollow State Park in Laurelville, Hocking County.At Pike Lake State Park, the project consists of constructing a new maintenance facility of approximately 2,400 squarefeet. The work includes demolition and replacement of the existing structure, which has been compromised by storm-related water intrusion. The selected consultant will be expected to evaluate site conditions thoroughly and considerenvironmental factors, operational needs, and proximity constraints when developing the final design.At Tar Hollow State Park, the project involves demolishing and removing two existing buildings to consolidate the ParkOffice and Maintenance operations into a single, new multipurpose facility of approximately 3,200 square feet. The designscope includes evaluating and reviewing potential alternative building locations within the project footprint to determine themost suitable site.While ODNR anticipates centralized services from the selected Consultant at the ODNR Fountain Square complex at2045 Morse Road, Columbus, Ohio 43229, travel will be necessary to complete the services. For the purposes of scoringproximity to project site, the ODNR Fountain Square complex will be considered the project site.B. Scope of ServicesThe selected firms shall also apply for and obtain all necessary regulatory permits, coordinate as needed with SHPO,maintain current estimates of probable construction costs through the design phase, and provide bidding and constructionadministration services.The Ohio Department of Natural Resources Division of Engineering has created a set of design guidelines for constructionprojects. All architects, engineers, consultants, and contractors are expected to be familiar with these design guidelines,F110-02-2026-JANPublish Date: 4/9/2026Page 1 of 5Request for Qualifications (Registered Design Professional) continuedwhich will be the preferred standards for all construction projects when creating final project specifications. A complete setof current guidelines is available at Design Resources | Ohio Department of Natural Resources.The selected A/E firms should consider innovative structures or construction techniques for improved constructability andto minimize permitting and environmental impacts.The selected firm’s agreement may be extended and amended to include additional, similar scopes of work at other sites.These may include, but are not limited to: construction of a new Maintenance Facility at Mathers Mill; Equipment StorageFacilities at Olsen, Lawrence Woods, Chaparral Prairie, Goll Woods, and Eagle Creek for the Division of Natural Areasand Preserves; an Equipment Storage Facility at the Buckeye Tree Nursery for the Division of Forestry; exterior envelopeimprovements at the Sign Shop at Dillon State Park; a new Maintenance and Office Facility at Mohican State Park; andrehabilitation of the Custodial and Laundry Facility at Pymatuning State Park for the Division of Parks and Watercraft.Upon award of the Agreement, commence by completing Program Verification.The selected A/E, as a portion of its required Scope of Services and prior to submitting its proposals, will discuss andclarify with the Owner and/or the Contracting Authority, the cost breakdown of the A/E Agreement detailed costcomponents to address the Owner’s project requirements. Participate in the Encouraging Diversity, Growth & Equity(EDGE) Program as required by statute and the Agreement.As required by the Agreement, and as properly authorized, provide the following categories of services: ProgramVerification, Schematic Design, Design Development, Construction Document Preparation, Bid and Award Support,Conformed Documents, Construction Administration, Post-Construction, and Additional Services of all types.Refer to the Ohio Facilities Construction Manual for additional information about the type and extent of services requiredfor each. A copy of the standard Agreement can be obtained at the OFCC website at https://ofcc.ohio.gov.During the construction period, provide not less than 12 hours (excluding travel time) on-site construction administrationservices each week, including (1) attendance at progress meetings, (2) a written field report of each site visit, (3) on-siterepresentation comprised of the A/E and its consultant staff involved in the primary design of the project, all havingrelevant and appropriate types of construction administration experience.For purposes of completing the Relevant Project Experience Matrix in Section F of the Statement of Qualifications (FormF110-330), below is a list of relevant scope of work requirements for this RFQ:1. Ability to design project scope to budget in current market conditions2. Experience with construction cost-estimating/analysis for natural resource facilities, specifically with regional costfactors.3. Ability to manage design and phased construction projects with multiple sites under one contract.4. Ability to manage design and construction projects in an occupied State Park setting.5. Experience with park facility design requirements and aesthetics at a State Park level.6. Experience with designing work of similar scopes (i.e. Building demolition and replacement, MEP systems, Buildingenvelope)7. Experience with State of Ohio Capital projects involving ODNR and OAKS CI.8. Experience with public construction and working with state and/or other governmental agencies.9. Experience with stakeholder communications and public information associated with natural resource relatedprojects.10. Experience with construction administration with similar type projectsC. Estimated Budget / FundingState Funding:$3,167,800.00Other Funding:$0Construction Cost: $2,767,800.00Total Project Cost: $3,167,800.00D. Anticipated ScheduleProfessional Services Start:Construction Notice to Proceed:Substantial Completion of all Work:Professional Services Completed:09 / 2607 / 2705 / 2806 / 29E. Estimated Basic Fee Range (see note below)8% to 10%F. EDGE Participation GoalPercent of initial Total A/E Fee:5.0%NOTE: Basic Services include: (1) Program Verification, (2) Schematic Design, (3) Design Development, (4) Construction Documents,(5) Bidding and Award OR GMP Proposal and Amendment (as applicable), (6) Construction Administration, and (7) Closeout services. TheBasic Fee includes all registered design professional services and consultant services necessary for proper completion of the Basic Services,including validation of existing conditions (but not subsurface or hidden conditions) and preparation of cost estimates and design schedules forF110-02-2026-JANPublish Date: 4/9/2026Page 2 of 5Request for Qualifications (Registered Design Professional) continuedthe project. The Estimated Basic Fee Range is calculated as a percentage of the Estimated Budget for Construction Cost above,including the Owner’s contingency. The Basic Fee excludes any Additional Services required for the project.G. Basic Service Providers Required (see note below)Lead A/E Discipline: ArchitectureSecondarySelect Primary DisciplineDisciplines:Mechanical-Electrical-Plumbing Eng.Structural EngineeringCivil EngineeringSurveyingH. Additional Service Providers RequiredGeotechnical ServicesEnvironmental ServicesSpecial Inspections (OBC)Cultural ServicesEnter Secondary DisciplineEnter Secondary DisciplineNOTE: The lead A/E shall be (1) any architect holding a certificate issued under section 4703.10 of the Revised Code, (2) any landscapearchitect holding a certificate issued under section 4703.36 of the Revised Code, or (3) any engineer holding a certificate issued under section4733.14 of the Revised Code.I. Evaluation Criteria for Selection• Demonstrated ability to meet Owner’s programmed project vision, scope, budget, and schedule on previousprojects.• Previous experience compatible with the proposed project (e.g., type, size).• Relevant past work of prospective firm’s proposed consultants.• Past performance of prospective firm and its proposed consultants.• Qualifications and experience of individuals directly involved with the project.• Proposer’s previous experience (numbers of projects, sizes of projects) when working with its proposedconsultants.• Specification writing credentials and experience.• Experience and capabilities of creating or using Critical Path Method (CPM) schedules and of using CPMschedules as a project management resource.• Approach to and success of using partnering and Alternative Dispute Resolution.• Proximity of prospective firms to the project site.• Proposer’s apparent resources and capacity to meet the needs of this project.• The selected A/E and all its consultants must have the capability to use the Internet within their normal businesslocation(s) during normal business hours.Interested A/E firms are required to submit the Commitment to Participate in the EDGE Business Assistance Programform in its Statement of Qualifications (Form F110-330) submitted in response to the RFQ, to indicate its intent to contractwith and use EDGE-certified Business(es), as a part of the A/E’s team. The Intent to Contract and to Perform and / orwaiver request letter and Demonstration of Good Faith Effort form(s) with complete documentation must be attached tothe A/E’s Technical Proposal. Both forms can be accessed via the OFCC website at https://ofcc.ohio.gov. The Intent toContract and to Perform form is again required at the Fee Proposal stage.If the A/E firm intends to receive points for exceeding the EDGE Participation Goal, it must provide BOTH acompleted Commitment to Participate form AND a completed Statement of Intent to Contract and to Perform formsigned by both parties with its Statement of Qualifications.For all Statements of Qualifications, please identify the EDGE-certified Business(es), by name, which will participate in thedelivery of the proposed professional services solicited in the RFQ.Interested A/E firms must indicate on their Statement of Qualifications, the locations where their services will beperformed in the spaces provided or by attachment in accordance with the requirements of Executive Order 2019-12Drelated to providing services only within the United States and the requirements of Executive Order 2022-02D prohibitingpurchases from or investment in any Russian institution or company. Failure to do so may cause their Statement ofQualifications to be rejected.F110-02-2026-JANPublish Date: 4/9/2026Page 3 of 5Request for Qualifications (Registered Design Professional*)State of Ohio Standard Forms and DocumentsJ. Submittal InstructionsFirms are required to submit the current version of Statement of Qualifications (Form F110-330) available via the OFCCwebsite at https://ofcc.ohio.gov.Electronic submittals, if requested, should be combined into one PDF file named with the project number listed on theRFQ and your firm’s name, followed by “SOQ”. Use the “print” feature of Adobe Acrobat or similar software for creating aPDF rather than using a scanner. If possible, please reduce the file size of the PDF. In Acrobat, go to Advanced, thenPDF Optimizer. Electronic submittals are limited to a maximum file size of 25 MB.Paper copies of the Statement of Qualifications, if requested, should be stapled only. Do not use special bindings orcoverings of any type. Cover letters and transmittals are not necessary.CD/DVD copies of the Statement of Qualifications, if requested, should have the sleeve labeled with the project numberand firm name, followed by “SOQ”.Facsimile copies of the Statement of Qualifications will not be accepted.Firms are requested to identify professional registrations, memberships and credentials including: LEED GA, LEED AP,LEED AP+, CCCA, CCM, CCS, CDT, CPE, DBIA, and any other appropriate design and construction industry credentials.Identify that information on the resume page for individual in Block 22, Section E of the F110-330 form.F110-02-2026-JANPublish Date: 4/9/2026Page 4 of 5Registered Design Professional Selection Rating FormState of Ohio Standard Forms and DocumentsProject Name Maintenance Faciliteis-SE RegionProject Number DNR-260053Proposer FirmCity, State, ZipSelection Criteria1. Primary Firm Location, Workload and Size (Maximum 10 points)a. Proximity of firm to project siteb. Amount of fees awarded by Contracting Authority inprevious 24 monthsc. Number of licensed professionalsLess than 75 miles75 miles to 100 milesMore than 100 milesLess than $500,000$500,000 to $1,000,000More than $1,000,000Less than 5 professionals5 to 10 professionalsMore than 10 professionals2. Primary Firm Qualifications (Maximum 30 points)a. Project management leadb. Project design leadc. Technical staffd. Construction administration staffExperience / ability of project manager tomanage scope / budget / schedule / qualityExperience / creativity of project designer toachieve owner’s vision and requirementsExperience / ability of technical staff to createfully coordinated construction documentsExperience / ability of field representative toidentify and solve issues during construction3. Key Consultant Qualifications (Maximum 20 points)a. Key discipline leadsb. Proposed EDGE-certified Consultant participation*Experience / ability of key consultants toperform effectively and collaborativelyOne point for every 2 percent increase inprofessional services over the EDGEparticipation goal4. Overall Team Qualifications (Maximum 10 points)a. Previous team collaborationb. LEED** Registered / Certified project experiencec. BIM project experienced. Team organizationLess than 4 sample projects4 to 6 sample projectsMore than 6 sample projectsRegistered LEED v4.0 or v4.1 projectsCertified LEED v4.0 or v4.1 projectsTraining and knowledgeDirect project experienceClarity of responsibility / communicationdemonstrated by table of organization5. Overall Team Experience (Maximum 30 points)a. Previous team performanceb. Experience with similar projects / delivery methodsc. Budget and schedule managementd. Knowledge of Ohio Capital Improvements processPast performance as indicated byevaluations and letters of referenceLess than 4 projects4 to 6 projectsMore than 6 projectsPerformance in completing projects withinoriginal construction budget and scheduleLess than 6 projects6 to 8 projectsMore than 8 projectsValueScore520210123Max=30 - 100-50-50 - 10Max= 200 - 150-5123Max=31Max2=21Max3=30-20 - 100-34-67 - 100-50-12-34-5* Must be comprised of registered professional design consulting firms and NOT the lead firm - For moreinformation on scoring this and other criteria refer to Document F199-01 - PS Selection Rating Rubric.** Leadership in Energy & Environmental Design administered by Green Business Certification Inc.™Notes:Evaluator:NameSubtotalSignatureDateF110-02-2026-JANPublish Date: 4/9/2026Page 5 of 5
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Intent to Award Sole Source f...
Follow Intent to Award Sole Source for AFRL/DP Laboratory Demonstration Project Active Contract
DEPT OF DEFENSE
Bid Due: 7/11/2026
Event # Version Name Company Category Type Reference Open Date Close Date Status
Cuyahoga County
Bid Due: 7/13/2026