UNIVERSITY HOUSING AND DINING SERVICES (UHDS) 2026 ELEVATOR MODERNIZATIONS
Project Information
- Bid Title
- UNIVERSITY HOUSING AND DINING SERVICES (UHDS) 2026 ELEVATOR MODERNIZATIONS
- Issuing Agency
- Oregon State University
- Location
- Oregon
- Published Date
- Nov 12, 2025
- Closing Date
- Dec 3, 2025
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
DescriptionOregon State University (“OSU” and/or “Owner”) is conducting a competitive ONE-STEP Request for Proposal (RFP) process to retain ONE (1) Contractor for the UHDS 2026 Elevator Modernizations (the “Project”).Attachments Details
OSU WILL ONLY BE ACCEPTING SEALED RESPONSES ELECTRONICALLY - Responses are to be submitted to bids@oregonstate.edu by the Due Date/Time.
MANDATORY PRE-PROPOSAL CONFERENCE/SITE-VISIT- A Mandatory Pre-Proposal Conference/Site-Visit will be held on November 20, 2025, at 1:00 PM PT with attendees meeting outside the entrance to Bloss Hall (2001 SW Western Blvd – Corvallis, OR 97333). Following Bloss Hall the Site-Visit will move on to Hawley and Poling Halls.
All questions shall be submitted via e-mail to constructioncontracts@oregonstate.edu by the Question Deadline in order to be addressed. The email subject line should contain the Solicitation Number/Name and Firm Name.Procurement Type:Solicitation Number:Sole Source: - Attachment Preview
-
REQUEST FOR PROPOSAL (RFP) #2026-020312UNIVERSITY HOUSING AND DINING SERVICES (UHDS) 2026ELEVATOR MODERNIZATIONSISSUE DATE: November 12, 2025MANDATORY PRE-PROPOSAL CONF./SITE-VISIT:November 20, 2025, at 1:00 PM Pacific Time (PT)starting at Bloss Hall – 2001 SW Western Blvd.)RFP DUE DATE/TIME:December 3, 2025, at 2:00 PM Pacific Time (PT) viaelectronic submission to bids@oregonstate.eduQUESTION DEADLINE: November 25, 2025, at 12:00 PM Pacific Time (PT)PROJECT NUMBER: N/ACONTRACT ADMINISTRATOR:Matt Hausman, Construction Contracts OfficerConstruction Contracts AdministrationOregon State University644 SW 13th StreetCorvallis, OR 97333APPEALS:Hanna Emerson, Chief Procurement OfficerProcurement, Contracts &Material ManagementOregon State University644 SW 13th StreetCorvallis, OR 97333Email: constructioncontracts@oregonstate.eduEmail: hanna.emerson@oregonstate.eduIt is the Offeror’s responsibility to continue to monitor the OSU Business and Bid Opportunities website forAddenda. Failure to acknowledge any Addenda in the Transmittal Letter may cause your Proposal to beconsidered non-responsive.OSU standards and policies govern this solicitation (Procurement Thresholds and Methods, ProcurementSolicitations and Contracts) unless otherwise referenced or stated.1.0 INTRODUCTIONRFP No. 2026-020312 – UHDS 2026 ELEVATOR MODERNIZATIONSDue Date/Time: 12/3/2025 at 2:00 PM Pacific TimePage 2 of 161.1 Oregon State University (“OSU” and/or “Owner”) is conducting a competitive ONE-STEPRequest for Proposal (RFP) process to retain ONE (1) Contractor for the UHDS 2026 ElevatorModernizations (the “Project”).OSU WILL ONLY BE ACCEPTING SEALED RESPONSES ELECTRONICALLY - Responses are to besubmitted to bids@oregonstate.edu by the Due Date/Time.MANDATORY PRE-PROPOSAL CONFERENCE/SITE-VISIT- A Mandatory Pre-Proposal Conference/Site-Visit will be held on November 20, 2025, at 1:00 PM PT with attendees meeting outside the entranceto Bloss Hall (2001 SW Western Blvd – Corvallis, OR 97333). Following Bloss Hall the Site-Visit willmove on to Hawley and Poling Halls.All questions shall be submitted via e-mail to constructioncontracts@oregonstate.edu by theQuestion Deadline in order to be addressed. The email subject line should contain the SolicitationNumber/Name and Firm Name.1.2 Background. Oregon State University in Corvallis, Oregon is located within the traditionalhomelands of the Mary's River or Ampinefu Band of Kalapuya. Following the Willamette ValleyTreaty of 1855 (Kalapuya etc. Treaty), Kalapuya people were forcibly removed to reservations inWestern Oregon. Today, living descendants of these people are a part of the Confederated Tribes ofGrand Ronde Community of Oregon (https://www.grandronde.org) and the Confederated Tribes ofthe Siletz Indians (https://ctsi.nsn.us).Founded in 1868 as Oregon’s land grant institution, OSU serves the state, the nation and the world asa premier 21st-century research university. OSU is committed to exceptional research, discovery,innovation and engagement — and to integrating its research and engagement mission with thedelivery of a high-quality, globally relevant and affordable education for the people of Oregon andbeyond. OSU is one of only two land, sea, space and sun grant universities in the U.S. and is the onlyuniversity in Oregon to have earned both Carnegie Classifications for Very High Research Activity andCommunity Engagement.The university’s 570-acre main campus is located in the city of Corvallis, a vibrant college town ofnearly 58,000 in the heart of Western Oregon’s Willamette Valley. Corvallis consistently ranks amongthe safest, most highly educated and greenest small cities in the nation.1.3 Location. Bloss Hall – 2001 SW Western Blvd – Corvallis, ORHawley Hall - 311 SW Sackett Place – Corvallis, ORPoling Hall – 360 SW Weatherford Place – Corvallis, OR1.4 Summary of Work. Oregon State University is seeking qualified contractors to provide labor,materials, and services for the modernization of THREE (3) traction passenger elevators located atBloss Hall, Hawley Hall and Poling Hall. The scope includes removal and disposal of existing elevatorequipment, design and installation of new components and compliance with all applicable codes andstandards.RFP No. 2026-020312 – UHDS 2026 ELEVATOR MODERNIZATIONSDue Date/Time: 12/3/2025 at 2:00 PM Pacific TimePage 3 of 16On-Site Construction time is limited to the summer months and given the uncertainty aboutContractor’s capacity to complete all 3 modernizations in one summer, OSU is providing flexibilityfor the 3 modernizations as provided below:Bloss Hall - All work must be completed in the summer 2026 window. The Contractor will not beallowed to begin work on-site until June 15, 2026, with Substantial Completion of all contract workrequired by August 26, 2026, and Final Completion by September 25, 2026. Given the need for afunctioning elevator by the beginning of Fall term 2026, Liquidated Damages will be assessed at arate of $2,500.00/day for each day past the August 26, 2026, Substantial Completion date.Hawley Hall & Poling Hall – Work may occur in either summer 2026 or 2027 but must becompleted within that summer. For work in 2026, the Contractor may begin work on-site on June15, 2026, with Substantial Completion by September 11, 2026, and Final Completion by October11, 2026. Given the need for a functioning elevator by the beginning of Fall term 2026, LiquidatedDamages will be assessed at a rate of $2,500.00/day for each day past the September 11, 2026,Substantial Completion date.For work that will be completed in the summer of 2027, the Contractor will not be allowed to beginwork on-site until June 14, 2027, with Substantial Completion by September 10, 2027, and FinalCompletion by October 10, 2027. Given the need for functioning elevators by the beginning of Fallterm 2027, Liquidated Damages will be assessed at a rate of $2,500/day for each day pastSeptember 10, 2027.For this project, the state of completion when the elevator may be used for its intended purpose asstated in A.1 of the General Conditions shall mean the completion of a final inspection by the Stateof Oregon that designates the elevator as “approved for use”.1.5 Scope of Services.1.5.1System Operating Features• Capacity & Speed: Retain existing elevator capacity and speed.• Travel: Retain existing floor-to-floor travel and rise.• Stops & Openings: Retain existing number of stops and openings.• Automatic Self-Leveling: Provide automatic self-leveling to bring the elevator car level withfloor landings (+/- ¼”), correcting for over/under travel and belt stretch.• Group Control: Provide optimized response to hall calls using a modern dispatching system.1.5.2Machine Room Equipment• Controller: Install a new digital closed-loop microprocessor-based elevator control system.• Drive System: Install a new variable voltage, variable frequency regenerative drive system.• Gearless Machine: Replace the existing geared machine with a new gearless AC machine.• Brake: Provide an integral brake for uncontrolled motion protection.• Seismic Switch: Install a new seismic switch to meet code requirements.• Digital Positioning System: Provide a digital positioning system for accurate leveling.RFP No. 2026-020312 – UHDS 2026 ELEVATOR MODERNIZATIONSDue Date/Time: 12/3/2025 at 2:00 PM Pacific TimePage 4 of 16• Machine Room Wiring: Replace all machine room wiring as required.1.5.3Elevator Car• Door Operator: Install new closed-loop door operators for smooth, quiet, and reliableoperation.• Infrared Door Protection: Install new solid-state infrared passenger protection devices.• Emergency Car Lighting: Provide new emergency car lighting with battery backup.• Car Wiring: Replace all car wiring and provide a new car top integration box.• Suspension Means: Install new suspension means (belts/ropes) as required.• Load Weighing Device: Provide a load weighing device for dispatching and hall call bypass.• Firefighter’s Service Cabinet: Install a new Phase II firefighter’s service operation cabinet.• Car Door Hardware & Rollers: Install new car door hardware and rollers.• Car Guide Rollers: Install new car roller guides and seismic retainer plates.• Car Door Finish: Install new brushed stainless-steel car door finish.• Cab Exhaust Blower: Provide new exhaust blower with sound isolation.• Toe Guard: Retain or replace as necessary to meet code.1.5.4Hoistway Equipment• Door Interlocks: Install new hoistway door interlocks.• Traveling Cable: Install all new hoistway traveling cables.• Hoistway Wiring: Replace all hoistway elevator electrical wiring.• Seismic Ring & String: Adjust/renew as necessary for code compliance.• Pit Switches: Install new pit run/stop switches.• Operating Devices: Provide terminal stopping devices and switches.• Door Hardware: Install new hanger rollers, door gibs, pickup rollers, and closers.• Counterweight Assembly: Retain and check for proper counterbalance.• Counterweight Guide Rollers: Install new counterweight guide rollers and seismic retainerplates.• Car & Counterweight Buffers: Retain existing buffers.• Hoistway Door Panels: Retain existing panels; replace worn gibs.• Floor Numbers: Paint floor numbers as required.• Braille: Retain or replace damaged braille.1.5.5Fixtures and Aesthetics• Car Operating Panel: Provide new applied car operating panels with all code-requiredfeatures, including:o Raised markings and Brailleo Car position indicatorRFP No. 2026-020312 – UHDS 2026 ELEVATOR MODERNIZATIONSDue Date/Time: 12/3/2025 at 2:00 PM Pacific TimePage 5 of 16o Door open/close buttons, inspection key-switch, fan key-switcho Help button/hands-free phoneo Landing passing signal• Landing Control Stations: Provide new hall button stations at each landing, with illuminatedpush buttons and required fire service features.• ADA Communication Device: Install hands-free emergency phone in each elevator.• Audible Voice Signal: Provide in-car audible voice announcement system.1.5.6Remote Services• Remote Elevator Monitoring: Provide remote elevator monitoring system (REM) for 24/7equipment status and diagnostics.1.5.7Safety• Top of Car Safety Handrail: Install top-of-car safety handrail if required.• Top of Car Inspection Station: Provide new inspection station.• Pit Access Ladder: Provide or modify pit access ladder to meet code.• Pit Access Alert: Install pit access alert system.• Camera installation: Provide COAX cable along the traveling cable from the elevatorcontroller to the in-cab camera (camera furnished and installed by OSU). Provide ethernet toCOAX converter at both ends of cable. Linovision EOC Converter or approved equal.1.5.8General Requirements• Wiring: All wiring and electrical interconnections must comply with governing codes.• Engineering Design: All new material must be compatible with retained equipment.• Permits & Inspections: Contractor to obtain all required permits and arrange for inspections.• Code Compliance: All work must comply with ASME/ANSI A17.1, ADA, NEC, and state/localcodes.• Warranty: Minimum 12-month warranty on all installed equipment.1.5.9. Miscellaneous Work. The following items, if necessary, are to be provided by theContractor. Proposers are to account for a $25,000.00 allowance per elevator for these servicesin their Bid Form included with the Proposal.• Building electrical, feeders, grounds, lighting, and fire alarm work.• Smoke and heat detector system and wiring.• Lighting and GFI outlets in machine room, secondary level, and pit.• Car light power supply and disconnect.• Ventilation and cooling equipment for machine room.• Telephone line for remote monitoring.• Code-compliant machine room, hoistway, and pit.
- Commodity Codes
-
- NAICS 238290Other Building Equipment Contractors
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Willamette NF, MF 26-1 Willam...
Follow Willamette NF, MF 26-1 Willamette Complex North Suppression Repair Road Maintenance Active
Federal Agency
Bid Due: 7/07/2026
John Day Fish Pump Rehabilita...
Follow John Day Fish Pump Rehabilitation Active Contract Opportunity Notice ID W9127N26BA031 Related
DEPT OF DEFENSE
Bid Due: 7/17/2026