Campus Steam Plant Boiler #1 Replacement

Project Information

Bid Title
Campus Steam Plant Boiler #1 Replacement
Issuing Agency
North Carolina State University
Location
North Carolina
Published Date
May 13, 2025
Closing Date
Jun 3, 2025
Government Level
State & Local
Status
Closed
Original Source
Join to Access Full Details
Project Description
Institution NC Central University
Institution URL for Additional
Information about this Project (Optional)
Project Name Campus Steam Plant Boiler #1 Replacement
Type of Services Engineering/Architectural
Project Manager Keith Alston
Phone Number (919) 530-5324
Contact Email keithalston@nccu.edu
Closing Date 06/03/2025
Project Budget
$ 1,959,940
Project Description One-Two Sentences
North Carolina Central University (NCCU) urgently needs a new 800 HP steam boiler system. The 1800HP Steam Boiler #1, once essential for campus heating, is out of service and tagged "Discontinued Use." The campus now relies on the aging 900HP Steam Boiler #2, which is showing significant signs of wear and tear. This boiler is the only unit capable of heating all 43 buildings during fall and winter, but its reliability is questionable. A smaller 600HP Steam Boiler used for summer needs cannot handle peak loads, leaving NCCU without a reliable source of steam for heating and hot water. Any failure in the 900HP boiler could lead to significant heating issues affecting a substantial portion of the campus including several residence halls and the dining hall. Therefore, replacing the inoperable 1800HP Steam Boiler#1 is crucial to ensure a reliable and efficient heating system for the campus. A previous boiler replacement project was unsuccessfully bid, but will provide planning information to aid the current urgent effort. Project scope includes replacement of the boiler, piping, valves, condensate pumps, variable frequency drive (VFD) controls and water pumps, replacement of steel structure to support the boiler, and an economizer for Boiler #3 to assure its continued operation. The roof must be removed to provide access for the existing boiler's removal and installation of the replacement. The costs of removing and replacing the roof are included in the project.
Submit Letters of Interest
and Current SF-330 to:
(Contact Person, Name of Institution & Address)
Keith Alston Project Manager North Carolina Central University Hubbard -Totton Building, Room 118C 1801 Fayetteville Street Durham NC 27707 Office: 919-530-5324 Fax: 919-530-7948 Virtual Campus Tour: http://www.youvisit.com/tour/nccu
Commodity Codes
  • NAICS 238220Plumbing, Heating, and Air-Conditioning Contractors
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.

Government Bids

Empower Your Bidding Strategy

Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.

  • Access an extensive database of bids, including comprehensive local and state opportunities.
  • Receive customized alerts for the bids that matter most to your business.
  • Explore detailed specifications to ensure precise and competitive submissions.
  • Gain a competitive edge with up-to-date information and exclusive opportunities.

See Also

RE-BID 3 IFB DS 26-01 Omega C...

RE-BID 3 IFB DS 26-01 ADVERTISEMENT FOR BIDS City of New Bern INVITATION

City of New Bern

Bid Due: 7/06/2026

Downing Creek Lift Station Im...

Bid Number: 26-1077 Bid Title: Downing Creek Lift Station Improvements Category: Construction Bids

City of Durham

Bid Due: 7/23/2026