Request for Quotations-Torringford School Replacement Chiller and Commissioning Services, RFB for Purchase and Install of Vogel-Wetmore ES Playground Equipment
Project Information
- Bid Title
- Request for Quotations-Torringford School Replacement Chiller and Commissioning Services, RFB for Purchase and Install of Vogel-Wetmore ES Playground Equipment
- Issuing Agency
- Torrington Public School
- Location
- Connecticut
- Published Date
- May 29, 2026
- Closing Date
- Jun 9, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
- Attachment Preview
-
TORRINGTON BOARD OF EDUCATIONREQUEST FOR QUOTATIONS FORTORRINGFORD ELEMENTARY SCHOOLA IR-COOLED SCREW CHILLER REPLACEMENT1 . INTRODUCTIONThe Torrington Board of Education (the “B OE”) requestss ealed quotations from qualified andresponsible vendors to provide, as design-builder, turnkey design, construction, and relatedprofessional commissioning and start-up services (collectively the “Work”) for a project (the“Project” ) to furnish and install a new air-cooleds crew chiller unit (the “Chiller Unit”) for theTorringford Elementary School building (the “F acility”)located at 800 Charles St, Torrington,C T 06790. The Chiller Unit will replace the Facility’s existing single 250-ton air-cooled chilleru nit (“Existing Chiller”).The Work to be performed and provided by the selected bidder is described in more specificdetail in this Request for Quotations (“RFQ”). ThisP roject is partially funded by a State ofC onnecticut school District Repair and Improvement Project grant (“DRIP Grant”) through theS tate Office of Policy and Management. The BOE will evaluate quotations for the Worksubmitted in response to this RFQ (“Bids”) on a best-valuebasis, considering qualifications,d esign, compliance, and other factors, and will not select solely on the basis of the lowest price.2. GENERAL INFORMATIONIt is the intention of the BOE in issuing this RFQ to enter into a written agreement with onebidder to perform and provide all the Work for Project for the design and specification, sale,delivery, professional installation, and commissioning and startup of the new Chiller Unit.3 . C HILLER UNIT REQUIREMENTS/SCOPE OF WORKSee Schedule A to this RFQ for: specifications and performance requirements that are the basesof selection for the Chiller Unit as-proposed by bidders in response to this RFQ and whichd escribe the existing conditions, mechanical systems, and existing building management system(“BMS”) and (including details and information forthe Existing Chiller (McQuay ModelA GS250B); the scope of commissioning and startup services to be provided by bidder awarded acontract for the Project; and other information regarding the scope of the Work the selectedbidder will be required to provide for the Project.14. P ROJECT SCHEDULEIt is anticipated that the bidder awarded a contract for the Project (the “Contractor” or“ Design-Builder”) will commence on-site constructionactivities for the Work no later thanA UGUST 1, 2026, achieve substantial completion ofthe entirety of the Work no later thanA UGUST 19, 2026, and that final completion of theWork and the entirety of Project will bea chieved, including punch list, no later thanSEPTEMBER18, 2026;provided, however, that ifthe Work is not substantially complete by the date required by the contract between the BOE andthe Contractor, the Contractor shall be responsible for providing temporary cooling to theF acility as-needed for the BOE to utilize the Facility for the BOE’s ordinary educationalo perations, through the date that the Contractor actually achieves substantial completion of theW ork, or November 1, 2026, whichever occurs first.The Contractor will be encouraged to commence acquisition of all materials needed to performthe Work immediately after execution of the contract for between the BOE and the Contractor, toensure the new Chiller Unit and all materials required for professional removal of the ExistingChiller and installation of the new Chiller Unit on-hand when on site construction is required tocommence.The Contractor will be permitted to perform the Work at the Project site during the work hours of6:00 a.m. to 5:00 p.m., Monday through Friday, excluding holidays; provided that requests toperform the Work outside of the normal hours may be a requested by the Contractor andcoordinated with the BOE designated representative for the Project. Construction activities willbe confined to the immediate work area at the Facility site only, and additional areas that aredesignated by the BOE upon request by the Contractor.Each bidder shall include as part of its Bid submission a complete and realistic proposedschedule for the Workw hich is consistent with BOE’sforegoing anticipated schedule for theProject, which schedule includes, at a minimum: purchase of the new Chiller Unit by theContractor and delivery to the Facility site, construction activities for the Work, andcommissioning and start-up of the new Chiller Unit.5. L IQUIDATED DAMAGESLiquidated damages shall apply as provided in the contract between the BOE and the Contractorfor the Project. Liquidated Damages may be assessed against the selected Contractor in theamount ofO ne Thousand Five Hundred and 00/100 Dollars($1,500.00) per calendar day thattimely substantial completion of the Work is delayed beyond the time(s) required in the contract.6. FORM OF CONTRACTThe BOE intends to use the form of contract included asE xhibit Fa s the form of agreementbetween the BOE and the selected bidder. By submitting a Bid, the bidder warrants and certifiesthat if the bidder is the bidder awarded the contract for the Work, the bidder will execute theform of contract as the agreement between the BOE and the bidder, without condition,modification, or exception, except as required to incorporate acceptable terms of the selectedbidder’s Bid into the form of contract (the “Agreement” ).The bidder selected as Contractors hall, execute the Agreement, as Design-Builder thereunder, within ten (10) days afterp resentation thereof by the BOE to the selected bidder.Notwithstanding the foregoing, the2 BOE reserves the right to modify the form of contract prior to execution of the Agreement asd eemed by the Director of Facilities, Superintendent, and or BOE to be in the best interest of theBOE and District.7. P RICINGA . The compensation to be paid to the Contractor for the performance of the Work for theProject shall be based on lump sum prices and unit prices for the Work. The Contractorwill be required to obtain its own City and building permits required for the Work, if any,a t no additional charge to the BOE.B. Lump Sum Price proposal. On the Bid Form (Exhibit A), each bidder shall provide as ingle lump sum price covering the entire scope of Work, including without limitation allservices for specification and design for the new Chiller Unit and other equipment,removal and disposal of the Existing Chiller, site preparation, installation, commissioninga n startup, shipping and freight, delivery, labor, materials, insurance, permits, bonds, andall other costs necessary to complete the Work (the “Base Bid Amount”).C . U nit Prices. As the Work progresses, the BOE or the Contractor may identify additionalW ork required for the Project. On the each bidder’s Bid Form, the bidder shall provide, inaddition to the lump sum price for the designated Work as the Base Bid Amount, unitprices for any possible additional work that may be identified during the course ofc onstruction of the Project as the Unit Price Bid Amounts, as well as Alternates BidAmounts for the Work as set forth on the Bid Form. The selected Contractor shall notc onduct any additional work or Unit Price Work without prior approval written approvalof the BOE.D . Tax-Exempt. The BOE is exempt from the payment oftaxes imposed by the federalg overnment and/or the State of Connecticut, including pursuant to Connecticut GeneralStatutes Section 12-412. Accordingly, all Bids shall omit from any proposed pricing anyS tate and federal taxes. Invoices for the Work should exclude taxes.E . B id pricing must include all shipping, delivery, equipment, labor, materials, insurance,p ermits, bonds, and all other costs necessary to complete the Work.8. B ID SECURITYExcept as expressly provided otherwise in this section of this RFQ, each Bid must beaccompanied by bid security in an amount equal to ten percent (10%) of the Base Bid Amountproposed by the Bidder on its Bid Form. Bid security must be in the form of a bid bond using thestandard bid bond included with this RFQ asExhibitC, executed by the bidder and a suretyauthorized issue surety bonds in the State of Connecticut, that is listed on the current U.S.D epartment of Treasury’s Listing of Approved Sureties, and that has a rating of A- or better byA.M. Best. Each Bidder shall attach the required bid bond to its Bid Form.If a bidder is a small contractor or a minority business enterprise as defined by ConnecticutG eneral Statutes (CGS) Section 4a-60g, the bidder may, in lieu of providing a Bid Bond, providea letter of credit in an amount equal to five percent (5%) of the Base Bid Amount if the Base Bid3 Amount is less than One Hundred Thousand Dollars ($100,000), or an amount equal totwenty-five percent (25%) if the Base Bid Amount exceeds One Hundred Thousand Dollars( $100,000.00).B ids submitted without bid security as required by this RFQ may be deemed nonresponsive andm ay be rejected.B y submitting a Bid, a bidder warrants and certifies that if the Bidder is awarded the Agreementfor the Work, the bidder will execute the Agreement with the BOE using the form of contractincluded with this RFQ as Exhibit F, without condition, modification, or exception, except asrequired to incorporate the acceptable terms of the selected bidder’s Bid into the form ofc ontract. A bidder selected as the Contractor must execute the Agreement with the BOE withinten (10) days after presentation thereof BOE to the bidder. Notwithstanding the foregoing, theB OE reserves the right to modify the form of contract prior to execution of an Agreement forW ork the Contractor, as deemed by the BOE to be in the best interest of the BOE. If a bidders elected as the Contractor fails to execute the Agreement within ten (10) days after presentationo f the Agreement by or on behalf of the BOE, the bidder shall forfeit its bid security and/or theb idder and its surety issuing a Bid Bond shall be required to perform their obligations under suchB id Bond, at the option of the BOE the award of the Agreement to that bidder shall be deemedw ithdrawn and shall be null and void, and, the BOE may proceed to award the Agreement to ad ifferent bidder or make no award of an Agreement in connection with this RFQ.Subject to the BOE’s rights to retain Bid Security as a forfeiture by a bidder and/or to enforce abidder’s bid bond, all bids security will be returned to unselected bidders after the earlier of (1)the BOE’s withdrawal and/or cancellation of this RFQ; (2) the award and execution of theAgreement for the Work and the submission of required performance bond and payment bond (orletters of credit if applicable) by the bidder selected as Contractor; or (3) or ninety (90) days afterthe date of opening of Bids.9. P ERFORMANCE AND PAYMENT BONDSA . Except as expressly provided otherwise in this section of this RFQ, the bidder selected asthe Contractor for the Work will be required to provide to the BOE, within ten (10) daysa fter the award of an Agreement to such bidder as Contractor, a payment bond and aperformance bond, each having a penal sum equal to the Contract Price in the Agreementb etween the BOE and the Contractor. The payment bond and performance bond must beissued by a surety rated A- or better by A.M. Best and listed on the U.S. Department ofTreasury’s Listing of Approved Sureties. The payment bond and performance bond mustbe submitted to Dean Pergola, Director of Facilities, 50 Major Besse Drive, Torrington,CT 06790 prior to the Contractor’s commencement of the Work under the Agreement.The cost of such bonds shall be separately identified on the Bid Form but included in theBase Bid Amount proposed by each bidder.B. T he bonds shall comply with the following requirements:1 . It is preferred that the bonds be written on the AIA Document A312-2010 forms;2 . Both bonds shall be written in the full amount of the Contract Sum;4 3 . B oth the payment bond and performance bond shall have a date that is the same orlater than the date of the Agreement;4. The Torrington Board of Education shall be named as the obligee on all bondsp rovided for the project.5 . T he Contractor shall require the attorney-in-fact who executes the required bonds onb ehalf of the surety to affix thereto a certified and current copy of the power ofattorney.C . If the Contractor is a small contractor or a minority business enterprise as defined byCGS Section 4a-60g, the Contractor may: (1) in lieu of providing performance bond,p rovide a letter of credit in an amount equal to ten percent (10%) of the Contract Price ifthe Contract Price is less than One Hundred Thousand Dollars ($100,000.00), or ana mount equal to twenty-five percent (25%) if the Contract Price if the Contract Pricee xceeds One Hundred Thousand Dollars ($100,000.00), and; (2) in lieu of providing alabor and material payment bond, provide a letter of credit in an amount equal to tenpercent (10%) of the Contract Price if the Contract Price is less than One HundredThousand Dollars ($100,000.00), or an amount equal to twenty-five percent (25%) if theContract Price if the Contract Price exceeds One Hundred Thousand Dollars($100,000.00).D . Each bidder shall furnish with its Bid, satisfactory evidence from its surety of suchbidder’s ability to obtain the required performance bond and labor and materials paymentbond, in the full amount of the bidder’s total Base Bid Amount, or, satisfactory evidencethat it is a small contractor or a minority business enterprise as defined by CGS Section4a-60g together with satisfactory evidence of its ability to provide to the BOE a letter ofc redit in lieu of the required performance bond and/or a letter of credit in lieu of therequired labor and material payment bond.E. A labor and material payment bond will be required from all subcontractors, except thatin accordance with Connecticut General Statutes Section 49-41(a), a labor and materialp ayment bond shall not be required to be furnished in relation to any sub-bid in which thetotal estimated cost of labor and materials under the subcontract with respect to whichs uch sub-bid is submitted is less than One Hundred Thousand Dollars ($100,000.00).10.I MPORTANT DATESIssuance of Request for Quotations:O ptional Pre-Bid Site Visit/Meeting:9 :00amDeadline for Submission of RFIs:A ddenda/Responses to RFIs:D eadline for Bid Submission:Anticipated Award of Agreement:5/29/20266 /02/20266/03/20266 /05/20266/09/20266/10/20261 1.B ID SUBMISSIONSA . Each bidder shall be required to become familiar with and comply with the terms andconditions, and bid submission instructions in this RFQ. Each bidder must be familiarwith all federal, state, and local laws, ordinances, or regulations that may, in any manner,5
- Commodity Codes
-
- NAICS 236220Commercial and Institutional Building Construction
- NAICS 238220Plumbing, Heating, and Air-Conditioning Contractors
- NAICS 238990All Other Specialty Trade Contractors
- NAICS 541330Engineering Services
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Storefront Modifications Storefront Modifications at 72 Church Street in New Haven. Start Date
State Government of Connecticut
Bid Due: 7/30/2026
Gymnasium Floor Replacements ...
Number 8857 Title Gymnasium Floor Replacements at Maloney and Bunker Hill Schools Available
City of Waterbury
Bid Due: 7/13/2026