Town of Fort Mill Doby Bridge Park Removal and Replacement of Exterior Steps Project RFP 500-154
Project Information
- Bid Title
- Town of Fort Mill Doby Bridge Park Removal and Replacement of Exterior Steps Project RFP 500-154
- Issuing Agency
- Fort Mill town
- Location
- South Carolina
- Published Date
- Mar 19, 2026
- Closing Date
- Apr 13, 2026
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- RFP 500-154
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Bid Number: RFP 500-154
Bid Title: Town of Fort Mill Doby Bridge Park Removal and Replacement of Exterior Steps Project RFP 500-154
Category: Services/Supplies Status: Open Bid Recipient: Phillip Aycock, Town of Fort Mill Procurement Manager Description: The Town of Fort Mill is seeking qualified contractors to remove, dispose of, and replace the existing wooden exterior steps located on the side of the Park and Recreation building at Doby’s Bridge Park with a new metal stair system. The intent of this project is to improve safety, durability, and long-term maintenance by replacing the aging wooden steps with a permanent metal structure suitable for outdoor public facility use.
Publication Date/Time: 3/19/2026 4:00 PM Closing Date/Time: 4/13/2026 2:00 PM Submittal Information: Mail in, drop off or Attend Bid Opening Pre-bid Meeting: Mandatory Pre Bid Meeting Contact Person: Brown Simpson at bsimpson@fortmillsc.gov or 803-242-0381 Related Documents: - Attachment Preview
-
Town of Fort Mill Doby Bridge Park Removal andReplacement of Exterior Steps Project RFP 500-154The Town of Fort Mill is seeking qualified contractors to remove, dispose of, and replace the existingwooden exterior steps located on the side of the Park and Recreation building at Doby’s Bridge Parkwith a new metal stair system. The intent of this project is to improve safety, durability, and long-termmaintenance by replacing the aging wooden steps with a permanent metal structure suitable foroutdoor public facility use.Mandatory Prebid MeetingMonday, March 30, 2026@ 11:00 amDoby Bridge Park1905 North Doby’s Bridge RoadFort Mill, SC 29715Bid OpeningMonday, April 13, 2026@ 2:00 pm205 North White StreetFort Mill, SC 29715(If delivering in person pleasewait in the lobby or drop offwith receptionist)1Scope of Work1. Project DescriptionThe Town of Fort Mill is seeking qualified contractors to remove, dispose of, and replace the existingwooden exterior steps located on the side of the Park and Recreation building at Doby’s Bridge Parkwith a new metal stair system. The intent of this project is to improve safety, durability, and long-termmaintenance by replacing the aging wooden steps with a permanent metal structure suitable foroutdoor public facility use.The contractor shall furnish all labor, materials, equipment, supervision, transportation, and incidentalsnecessary to complete the work in accordance with the requirements outlined in this solicitation.2. Scope of Services2.1 Site VerificationPrior to beginning work, the contractor shall visit the site to verify all measurements, conditions, andattachment points associated with the existing stair structure. Submission of a bid shall indicate thecontractor has familiarized themselves with the site conditions.2.2 Removal and Disposal of Existing StructureThe contractor shall:• Carefully dismantle and remove the existing wooden steps, including treads, stringers, handrails,fasteners, and any associated components.• Protect the existing building structure, foundation, and surrounding property during removalactivities.• Remove all debris and construction waste from the site.• Properly dispose of all materials offsite in accordance with local, state, and environmentalregulations.2.3 Fabrication and Installation of New Metal Stair SystemThe contractor shall furnish and install a new exterior metal stair system designed for commercial ormunicipal outdoor use. At a minimum, the stair system shall include:• Structural metal stringers or frame capable of supporting required loads• Slip-resistant metal treads suitable for exterior use• Code-compliant handrails and guardrails• Anchoring hardware and structural connections appropriate for attachment to the existingbuilding2• Corrosion-resistant coating or finish (such as galvanized or powder-coated steel) designed forlong-term outdoor durabilityThe stair system shall be installed level, secure, and in full compliance with applicable building codes andsafety standards.3. Site Protection and SafetyThe contractor shall be responsible for maintaining a safe work environment and protecting parkvisitors, Town staff, and property during the project. This includes:• Installation of temporary barriers, caution tape, or signage as necessary• Maintaining clear access routes around the work area• Compliance with all applicable OSHA safety regulations4. Cleanup and Site RestorationUpon completion of the installation, the contractor shall:• Remove all construction debris, packaging materials, and unused supplies from the site• Restore the surrounding area to a clean and safe condition• Ensure the site is ready for normal public use5. Compliance RequirementsAll work performed under this contract shall comply with:• Applicable local, state, and federal building codes• OSHA safety regulations• Applicable South Carolina construction standards• Manufacturer specifications for the stair system and materialsAll materials used shall be new, commercial-grade, and suitable for outdoor municipal use.6. Final Inspection and AcceptanceUpon completion of the work, the contractor shall notify the Town of Fort Mill for final inspection. Theproject will be considered complete when the Town determines that all work has been performed inaccordance with the contract requirements and the stair system is safe, stable, and fully operational.3All proposals shall be addressed and/or delivered in a sealed envelope to:Town of Fort Mill205 North White StreetFort Mill, SC 29715Attn: Phillip Aycock, Procurement Manager RFP 500-154Proposals will be received by 2:00 p.m. (Eastern Time) on April 13, 2026. Any bid received after theappointed time and date will not be opened or considered and will be returned to the bidder.Town ContactsQuestions regarding insurance should be directed to Phillip Aycock at paycock@fortmillsc.gov or 803-547-2116, to make appointments to inspect the properties please contact Brown Simpson atbsimpson@fortmillsc.gov or 803-242-0381.Non-Appropriation of FundsThis Agreement shall be subject to the availability and appropriation of funds by Management, andTown Council. If the Council does not appropriate the funding needed by the Town to make paymentsunder this Agreement for a given fiscal year, the Town will not be obligated to pay amounts due beyondthe end of the last fiscal year for which funds were appropriated. No act or omission by the Town, whichis attributable to non-appropriation of funds, shall constitute a breach of or default under thisAgreement.Bid CancellationCancellation An Invitation for Bids, a Request for Proposals, a Request for Qualifications, or othersolicitation may be cancelled, or any or all bids or proposals may be rejected in whole or in part as maybe specified in the solicitation, when it is in the best interest of the Town. The reasons therefor shall bemade part of the contract file.4Compliance with LawThe selected consultant and its agents and employees shall be bound and comply with all federal, state,and local laws, ordinance rules and regulations, as well as all other governing bodies having legaljurisdiction with respect to the area where such work is performed.Disqualification and Rejection of QuotationsTown of Fort Mill reserves the right to reject any consultant who has failed to perform satisfactorily, orcomplete on time, or in a manner inconsistent with the bid documents, contract of similar nature, or toreject the RFP of a consultant who is not able to perform such contract satisfactorily. The Townexpressly reserves the right to award the contract to the consultant that best meets the requirements asset forth herein – which is in the best interest of the Town, and it’s need. This solicitation does notcommit the Town of Fort Mill to award a contract, to pay any cost incurred in the preparation of aproposal, or to produce or contract for services. A respondent may not alter the RFQ or its components.The Town of Fort Mill reserves the right to accept or reject any or all proposals received as a result ofthe Request for Proposal, or to cancel it in part or in its entirety if it is in the best interest of the Town ofFort Mill. The Town reserves the right to change the solicitation schedule or issue amendments to thesolicitation at any time. All respondents submitting qualifications agree to abide by all relevantprovisions of the South Carolina Code of Laws as they apply.Excluded BiddersBids from vendors/contractors with prior poor performance; quality issues, contact conformance,payment history, timeline compliance, or any other reason the Town deems POOR PERFORMANCE willnot be considered. Excluded Vendors/Contractors can resubmit complete company information withreferences for the Town review after a minimum of one year from the last excluded bid. The Town willcontact Vendor/Contractor with its decision within 30 days of company information submittal. The Townreserves the right to include or exclude said Vendor/Contractor based on findings.5
- Commodity Codes
-
- NAICS 236220Commercial and Institutional Building Construction
- NAICS 237310Highway, Street, and Bridge Construction
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Town of Fort Mill Fire Statio...
Project Name: Town of Fort Mill Fire Station #3 Agency/Owner: Town of Fort
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/25/2026
Fort Fremont Stairs and Rails...
Project ID: Title: Fort Fremont Stairs and Rails Design/Build Addenda: 0 Release Date:
Beaufort County
Bid Due: 7/02/2026