McDonald Creek Culvert Extension
Project Information
- Bid Title
- McDonald Creek Culvert Extension
- Issuing Agency
- City of Huntsville
- Location
- Alabama
- Published Date
- May 6, 2026
- Closing Date
- May 8, 2026
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- Project No. 71-26-SP34
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
McDonald Creek Culvert Extension Project No. 71-26-SP34
MANDATORY Pre-Bid Meeting will be held on Tuesday, April 28, 2026, at 10:00 a.m. CST and the Bid Opening has been RESCHEDULED and will be held on Friday, May 8, 2026, at 10:00 a.m. CST in Conference Room 442, located on the 4th Floor of City Hall.
Pre-Bid meeting will be held at City Hall, in Training Room 624, located at 305 Fountain Circle, Huntsville, AL 35801.
Attached FilesBid ContactsFile Description Download Addendum No. 4 Download Addendum No. 3 Download Revised Quantities-Attachment A1 Download Revised Drawings per Addendum No. 2 Download Addendum No. 2 Download Addendum No. 1 Download MANDATORY Pre-Bid Meeting Attendees Download Specifications Download Drawings Download Advertisement Download Name Job Title Patrick Gamble Project Engineer Mary Ridgeway Procurement & Contracts Coordinator - Attachment Preview
-
McDonald Creek Culvert RepairProject No. 71-26-SP34May 6, 2026Addendum #4Bid Opening has been RESCHEDULED to Friday, May 8, 2026, at 10:00 a.m.in Conference Room 442 located on the 4th Floor of City Hall.CLARIFICATION:Section G Hold Harmless Agreement of the insurance requirements in the Specification Package hasbeen revised to read as follows:G. HOLD HARMLESS AGREEMENT1. Other Than Liability ExposuresThe Contractor, architect, engineer, land surveyor or consulting firm, to the fullest extent permitted by law, shallindemnify, hold harmless, and defend the City of Huntsville, its elected and appointed officials, employees, agents andspecified volunteers against all claims, damages, losses and expenses, including, but not limited to, attorney’s fees,caused by, arising out of or resulting from or in connection with the performance of the work, provided that any suchclaim, costs, damage, loss or expense (1) is attributable to personal injury, including bodily injury, sickness, disease ordeath, or to injury to or destruction of tangible property, including loss of use resulting there from and (2) is caused by,in whole or in part, any active or passive negligent act or omission of the contractor, architect, engineer, land surveyoror consulting firm, or any of their subcontractors, sub consultants, or anyone directly or indirectly employed by any ofthem or anyone for whose acts they are legally liable. Such obligation should not be construed to negate, abridge, orotherwise reduce any other right or obligation of indemnity which would otherwise exist as to any party or persondescribed in this paragraph.2. LiabilityThe Contractor agrees that as respects to negligent acts, errors, or omissions in the performance of services,to indemnify and hold harmless the City of Huntsville, its agents and their officers, representatives, employees, andspecified volunteers from and against any and all claims, demands, losses and expenses including, but not limited toattorney’s fees, liability, or consequential damages of any kind or nature resulting from any such negligent acts, errors,or omissions of the Contractor or any of their sub-consultants directly or indirectly employed by them or anyone directlyor indirectly employed by them or anyone for whose acts they are legally liable.3. IndemnityIn claims against any person or entity indemnified under this Paragraph by an employee of the Contractor,any one directly or indirectly employed by them or anyone for whose acts they may be liable, the indemnificationobligation under this Paragraph shall not be limited by a limitation on amount or type of damages, compensation orbenefits payable by or for the Contractor or a Subcontractor under workers’ compensation acts, disability benefit actsor other employee benefit acts.Addenda will only be emailed to those bidders who attend and have signed in at the pre-bid meeting.All addenda, as well as other project information, are available for downloading on Engineering’swebsite at www.huntsvilleal.gov/engineeringbids. Acknowledgement of receipt/download fromwebsite of addenda is mandatory using Attachment “C” located in the Specifications andattachment must be submitted with bid package. Failure to do so shall be cause for rejection of thebid. It is the responsibility of all bidders to refer to the website for any updates. The attached pre-bid meeting minutes, all addenda and attachments for the above-referenced project will becomepart of the contract documents.END OF ADDENDUM #4
- Commodity Codes
-
- NAICS 237310Highway, Street, and Bridge Construction
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Sourcing Project Number: SRC0000034420 Solicitation Label: FLOORS 3 (MAIN BUILDING)-AIDT Status: Open for
State Government of Alabama
Bid Due: 7/13/2026
Purchase & Installation of HV...
Bid Number: WG26-32 Bid Title: Purchase & Installation of HVAC Upgrade to Baldwin
Baldwin County
Bid Due: 7/15/2026