SW District, Polk County, E 310th Road Over Brush Creek, Removal of an existing bridge and the construction of a new 200-foot, two-span, prestressed concrete NU girder bridge.
Project Information
- Bid Title
- SW District, Polk County, E 310th Road Over Brush Creek, Removal of an existing bridge and the construction of a new 200-foot, two-span, prestressed concrete NU girder bridge.
- Issuing Agency
- Missouri Department of Transportation(MDOT)
- Location
- Missouri
- Published Date
- May 26, 2026
- Closing Date
- Jun 22, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Status Bid Advertisement Post Date Revision Date Letting Date NEW SW District, Polk County, E 310th Road Over Brush Creek, Removal of an existing bridge and the construction of a new 200-foot, two-span, prestressed concrete NU
girder bridge.5/26/26 6/22/26 - Attachment Preview
-
INVITATION TO BIDE. 310TH ROAD OVER BRUSH CREEKSealed bids for the Proposal for the Construction of Polk County Bridge #00700081 will be received at: PolkCounty Courthouse, 102 E. Broadway, Room 12, Bolivar, MO 65613, until 9:30 A.M. (Prevailing Local Time)on the 22nd day of June 2026, at the office of the Polk County Courthouse, and at that time will be publiclyopened and read. All bids shall be submitted as a Hard Copy.The proposed work includes:Removal of an existing bridge and the construction of a new 200-foot, two-span, prestressed concrete NUgirder bridge. A precast concrete box culvert, guardrail, riprap, and permanent erosion control will beinstalled along with any other incidental work in accordance with the plans and specifications.A digital copy of the plans and specifications may be purchased through the office of Great RiverEngineering (GRE), at 417-886-7171 upon payment of $75.00, which is not refundable. All bidders mustpurchase plans through Great River Engineering and be on the planholder list in order to bid the project.This contract requires payment of the prevailing hourly rate of wages for each craft or type of work requiredto execute the contract as determined by the Missouri Department of Labor and Industrial Relations, andrequires adherence to a schedule of minimum wages as determined by the United States Department ofLabor. For work performed anywhere on this project, the contractor and the contractor’s subcontractorsshall pay the higher of these two applicable wage rates. The applicable state wage rates for this contractare detailed in “Annual Wage Order 32”, that is attached to this bidding document. The applicable federalwage rates for this contract are the effective Davis-Bacon federal wage rates posted the tenth day beforethe bid opening date and can be found at: https://sam.gov/content/wage-determinations. Thesesupplemental bidding documents have important legal consequences. It shall be conclusively presumedthat they are in the bidder's possession, and they have been reviewed and used by the bidder in thepreparation of any bid submitted on this project.The Polk County hereby notifies all bidders that it will affirmatively ensure that in any contract entered intopursuant to this advertisement, businesses owned and controlled by socially and economicallydisadvantaged individuals will be afforded full opportunity to submit bids in response to this invitation andwill not be discriminated against on the grounds of race, color, religion, creed, sex, age, ancestry, or nationalorigin in consideration for an award.All bidders must be on MoDOT’s Qualified Contractor List per Section 102.2 of the Missouri StandardSpecifications for Highway Construction, 2025, Third Edition Edition including all revisions. The contractorquestionnaire must be on file 7 days prior to bid opening.Contractors and sub-contractors who sign a contract to work on public works projects shall provide a 10-Hour OSHA construction safety program, or similar program approved by the Department of Labor andIndustrial Relations, to be completed by their on-site employees within sixty (60) days of beginning work onthe construction project.A certified cashier’s check or a bid bond in the amount of 5% shall be submitted with each proposal.The Polk County reserves the right to reject any or all bids.The project will be awarded to the lowest, responsive, responsible bidder.The DBE Goal for this project is 0%.No 2nd tier subcontracting will be allowed on this project.POLK COUNTYBRO-R084(015)INVITATION TO BID
- Commodity Codes
-
- NAICS 236220Commercial and Institutional Building Construction
- NAICS 237310Highway, Street, and Bridge Construction
- NAICS 238910Site Preparation Contractors
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
HARRY S. TRUMAN DAM POWERHOUS...
Follow HARRY S. TRUMAN DAM POWERHOUSE ELEVATOR REPLACEMENT WARSAW, MISSOURI - DESIGN BUILD
Federal Agency
Bid Due: 7/14/2026
26-167 - Replacement Playgrou...
Bid Title: 26-167 - Replacement Playground Equipment at Oak Creek Park Category: Equipment
City of St. Peters
Bid Due: 7/15/2026