SR 117 Truck Route at US 101 Interchange Improvements
Project Information
- Bid Title
- SR 117 Truck Route at US 101 Interchange Improvements
- Issuing Agency
- City of Port Angeles
- Location
- Washington
- Published Date
- Apr 10, 2026
- Closing Date
- May 11, 2026
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- TR1799
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Bid Number: TR1799
Bid Title: SR 117 Truck Route at US 101 Interchange Improvements
Category: Public Works Status: Open Description: Request for Qualifications is to seek the most qualified firm to provide engineering and design services to retrofit SR 117/US 101 interchange to a bi-directional configuration to enable direct US 101 access for heavy trucks traveling to and from the international Port of Port Angeles.
Project is grant funded through the Freight Mobility Strategic Investment Board (FMSIB).
Project Manager: Timothy Hayes, P.E. at 360-417-4827 or For security reasons, you must enable JavaScript to view this E-mail address. .
SOQ Due Date: 5:00 PM, Monday May 11, 2026
Publication Date/Time: 4/10/2026 12:00 AM Closing Date/Time: 5/11/2026 5:00 PM Related Documents: - Attachment Preview
-
City of Port AngelesPublic Works and UtilitiesRequest for Qualifications(RFQ)Professional Consulting Services for:SR 117 Truck Route at US 101 InterchangeImprovementsTR1799Qualifications Due:Monday, May 11th, 2026 by 5:00 p.m.City of Port AngelesDepartment of Public Works - EngineeringAttn: Timothy Hayes, P.E., Engineer III321 E 5th StreetPort Angeles, WA 98362thayes@cityofpa.us360.417.4827STATEMENT OF PURPOSEThe City of Port Angeles (City) is seeking qualified firms to perform engineering and design services for theretrofit of the SR 117/US 101 interchange to a bi-directional configuration. The project aims to enabledirect US 101 access for heavy trucks traveling to and from the international Port of Port Angeles, therebyremoving approximately 1,400 freight vehicles per day from the historic downtown street grid. Theselected consulting firm will be responsible for a comprehensive scope of work including a projectconstraints study, community and tribal engagement, interchange alternatives analysis, and thepreparation of NEPA/SEPA environmental documentation. Furthermore, the consultant will providegeotechnical engineering, utility coordination, and right-of-way engineering to support the developmentof a 90% Plans, Specifications, and Estimates (PS&E) package.BACKGROUND INFORMATIONThe project will directly benefit freight movement by eliminating a current bottleneck in thetransportation network that affects freight and all other traffic in downtown Port Angeles. Today,although a defined truck route (SR 117) runs north-south through Port Angeles and connects to the maineast-west highway (US 101), the existing interchange only allows movement to and from the west.Freight traffic to and from the east, where the Port serves many markets, is forced through downtownPort Angeles. It will improve system-wide connectivity and reliability by enabling regional freight to usethe higher capacity cross-town SR 117 truck route. This will provide freight traffic a faster route betweenPort facilities and other destinations while keeping these large vehicles separate from non-freighttransportation activities. The primary focus of this WSDOT-oversight project is to enhance freight mobilityand bolster the long-term economic resilience of the North Olympic Peninsula.The City has obtained a grant for funding through the Freight Mobility Strategic Investment Board (FMSIB).Utilizing this grant funding along with City funding will enhance mobility for freight moving to and fromthe Port of Port Angeles.SCOPE OF WORKThe selected firm will be responsible for all aspects of the interchange design and the PS&E package,including surveying, engineering, assistance with securing necessary R/W, completion of environmentaldocumentation and any necessary permits, and coordinating all disciplines of engineering with WSDOT.Work may also include construction inspection or management during the construction phase. The PS&Epackage must adhere to WSDOT standards.Under the general direction of the City Engineer or designee, qualified firm(s) shall be responsible for, butnot limited to the following tasks:● Project Management● Surveying and Existing Conditions Studies● Community Engagement and Agency Coordination● Interchange Alternatives Development and Analysis● Environmental Services and Documentation● Preferred Alternative Selection Support and Development● WSDOT Coordination and Local Agency Approvals● Geotechnical Services● Utility Coordination● Grant Funding Support● Right of Way Engineering and Documentation● Plans, Specifications, and Estimates (PS&E) to 90% Design● Project DocumentationThe City of Port Angeles reserves the right to retain the services of the successful firm for any subsequentphase (Right of Way Acquisition, Construction) associated with this project.SCHEDULEAdvertised:RFQ issued:Questions Due:Due date:Friday, April 10th, 2026 and Friday, April 17th, 2026Friday, April 10th, 2026Friday, April 24th, 2026 by 5:00 p.m. PSTThe City will not respond to any inquiries submitted after this date/time.Monday, May 11th, 2026 by 5:00 p.m. PSTAnticipated Design Schedule & Deliverable DatesBegin Preliminary EngineeringJuly 2026Finalize Existing Conditions & ConstraintsOctober 2026Begin Community/Stakeholder Engagement November 2026Preferred Alternative SelectionApril 2027Begin ROW and EnvironmentalMay 202730% Design SubmittalJune 202760% Design SubmittalNovember 202790% Design SubmittalApril 2028REQUEST FOR QUALIFICATIONS CONTENTThe cost of developing the statement of qualifications for the project shall be included in the consultantscost of doing business and the City is not responsible for any costs associated with preparing it.Submittals must clearly demonstrate an understanding of the City’s objectives. The proposal shall belimited to 10 pages (double-sided), resumes can be included in an appendix and do not count towards thepage limit. The proposal should not include unnecessary promotional material, and shall be brief, precise,and organized as follows:1. Cover LetterPlease include:● Firm name, address, telephone, email.● A single point of contact for the RFQ process.● General introduction of your firm with a brief summary of general qualifications and areasof expertise.2. Statement of QualificationsPlease include:● Description of firmo Type of ownership – individual, partnership, municipality, corporation, etc.o Size of firm.o Number of years in business.o Description of qualifications in areas of expertise and services provided.o Information relating your philosophy and general approaches to the work to beperformed● A list of projects that demonstrates your firm’s experience in transportation andinterchange design, specifically the tasks listed in the Scope of Work above.o Include relevant background information on the projects (timeframe, majormilestones, cost, firm’s role and relevant staff).o Maximum of 10 project examples.3. Key PersonnelPlease identify:● Key personnel for each service provided.o Include resumes and certifications for key personnel and their experience onrelevant projects and contracts (as noted above, resumes can be included in anappendix and do not count towards the page limit).o Identify potential project managers and any personnel that would interact withCity staff and/or the public.4. ReferencesPlease include:● List up to five people whom the City staff may contact for professional referencesregarding the past performance of the firm, including name, email and phone number.SELECTION PROCESSSubmit an electronic copy (PDF) of the full RFQ via email or USB drive no later than Monday, May 11th,2026 by 5:00 p.m. to:City of Port AngelesDepartment of Public Works - EngineeringAttn: Timothy Hayes P.E., Engineer III321 E 5th StreetPort Angeles, WA 98362thayes@cityofpa.usThe maximum file size that can be emailed is 20MB. Please include “First/Front/Marine Drive PedEnhancements” on the envelope, if mailed, or in the subject line, if emailed. All submittals received bythe specified deadline will be reviewed by the City for content, completeness, and experience. After thefirms deemed most qualified are selected, further evaluation and interviews of the short-listed firmsmay be conducted as part of the final selection process. However, the City reserves the right tocomplete the selection process without proceeding to an interview phase, and may choose to select thefirm based upon information supplied in the proposer’s qualification statement. The following criteriawill be used to evaluate responses to this RFQ:1. Responsiveness to the RFQ, breadth and depth of response.2. Reputation of the company, its subcontractors and key personnel.3. Qualifications of the Proposed Project Manager.4. Ability to meet schedule.5. Approach to Project.6. Familiarity with WSDOT/FHWA standards.7. Satisfaction of prior and current clients (references).For further information, please contact Timothy Hayes at 360.417.4827, or thayes@cityofpa.usCONTRACT PROCESSThe City intends to execute a cost plus fix fee agreement with the most qualified firm. The Agreement willbe awarded at the discretion of the City of Port Angeles City Council. The City of Port Angeles reserves theright to accept or reject any or all proposals received as a result of this request, to negotiate with anyqualified source, or to cancel in part or in its entirety this RFQ. Proposals and materials submitted willbecome the property of the City and will not be deemed confidential or proprietary and are subject topublic record laws and will be released upon request.AMERICANS WITH DISABILITIES ACT (ADA) INFORMATIONThe City of Port Angeles in accordance with Section 504 of the Rehabilitation Act (Section 504) and theAmericans with Disabilities Act (ADA), commits to nondiscrimination on the basis of disability, in all of itsprograms and activities. This material can be made available in an alternate format by emailing LucyHanley, Contract Specialist III, at contracts@cityofpa.us or by calling (360)417-4541.TITLE VIThe City of Port Angeles, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78Stat. 252, 42 U.S.C. §§ 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that it willaffirmatively ensure that any contract entered into pursuant to this advertisement, disadvantagedbusiness enterprises will be afforded full and fair opportunity to submit bids in response to thisinvitation and will not be discriminated against on the grounds of race, color, or national origin inconsideration for an award.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Transit Oriented Development ...
Solicitation Close Date: 07/29/26 Title: Transit Oriented Development Market Analysis & Feasibility Study
State Government of Washington
Bid Due: 7/29/2026
2019-114 Affordable Housing I...
2019-114 Affordable Housing Inventory & Market Analysis Closes 4/11/29 @ 3:00 PM 2019-114
Kitsap County
Bid Due: 4/11/2029