8th Ave W Reconstruction Project
Project Information
- Bid Title
- 8th Ave W Reconstruction Project
- Issuing Agency
- Oskaloosa city
- Location
- Iowa
- Published Date
- Jan 22, 2026
- Closing Date
- Feb 19, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Bid Title: 8th Ave W Reconstruction Project
Category: Current bid postings Status: Open Description: The city of Oskaloosa is accepting bids for the 8th Avenue West Reconstruction Project. Please refer to the attached plans and specifications for more details on the project.
Sealed bids shall be submitted to the office of the City Clerk, located at 220 South Market Street, by 11:00 AM on Friday, February 19th, 2026, and the bids received will be considered by the City Council on Monday March 2nd, 2026.
Publication Date/Time: 1/22/2026 12:00 PM Closing Date/Time: 2/19/2026 11:00 AM Related Documents: - Attachment Preview
-
GENERAL SYMBOLS LEGENDGENERAL ABBREVIATIONS LEGEND© COPYRIGH2T025GARDEN & ASSOCIATES, LTD.GARDEN & ASSOCIATES, LTD. RESERVES PROPRIETARY RIGHTS,INCLUDING COPYRIGHTS, TO THIS DOCUMENT. THISDOCUMENT AND ALL INFORMATION CONTAINED ARE THEEXCLUSIVE PROPERTY OF GARDEN & ASSOCIATES, LTD. ANDMAY NOT BE USED, REPRODUCED, OR DISSEMINATEDWITHOUT THE EXPRESS WRITTEN CONSENT AND COMPLETEPARTICIPATION OF GARDEN & ASSOCIATES, LTD.8TH AVENUE WESTRECONSTRUCTIONOSKALOOSA, IOWA2025Materials and construction shall be in accordance with the SUDASStandard Specifications, 2025 Edition, plus current SupplementalSpecifications and Special Provisions.SHEET INDEXSHEET NO.DESCRIPTIONA.01 TITLE SHEETA.02 GENERAL NOTES & ESTIMATED QUANTITIESB.01 TYPICAL SECTION, DETAILS, & TRAFFIC CONTROL PLAND.01 REMOVAL PLAND.02 PAVEMENT PLAN & PROFILEL.01 INTERSECTION DETAILW.01 CROSS SECTIONS7TOTAL SHEETSPRELIMINARY ROFESSIONAALEX C.FENNIGP24450IOW AI hereby certify that this engineering document was prepared by meor under my direct personal supervision and that I am a dulylicensed Professional Engineer under the laws of the State of Iowa.Alex C. Fennig, P.E.DateLicense number: P24450My license renewal date is December 31, 2025Pages or sheets covered by this seal:CITY OF OSKALOOSAPROJECT LOCATIONOSKALOOSA, IOWAPROJECT LOCATION MAPNO SCALESHEET TITLETITLE SHEETSCALE:NO SCALEDRAWN BY:ACFAPPROVED:ACFREVISIONS:11/25/25: SIDEWALK REVDATE:MAY 21, 2025PROJECT NO.:5024378SHEET NO.:A.01GENERAL NOTES:PROJECT NOTES1. ALL WORK SHALL BE IN ACCORDANCE WITH THE SUDAS STANDARD SPECIFICATIONS, 2025 EDITION AND CURRENT SUPPLEMENTAL SPECIFICATIONS AND THE DETAILEDSPECIFICATIONS REQUIREMENTS. SPECIFICATION MANUALS CAN BE ORDERED FROM THE INSTITUTE FOR TRANSPORTATION RESEARCH (FORMERLY CTRE) - ATTENTION:BETH RICHARDS, 2711 SOUTH LOOP DRIVE SUITE 4700 AMES, IOWA 50010-8664, PHONE: 515-294-8103. SPECIFICATIONS CAN ALSO BE VIEWED AT THE SUDAS WEB SITE(WWW.IOWASUDAS.OR).GCONTRACTOR SHALL HAVE A MINIMUM OF ONE SET OF PLANS AND SPECIFICATIONS ON THE JOB SITE AT ALL TIMES DURING CONSTRUCTION.2. CONTRACTOR SHALL NOTIFY SEAN MURPHY, CITY OF OSKALOOSA AT 641-673-7472 TWO WEEKS PRIOR TO COMMENCING WORK.3. COORDINATE WORK AND COOPERATE WITH JURISDICTION PERSONNEL AND ENGINEER.4. LOCATION OF EXISTING UTILITIES SHOWN ON PLANS IS APPROXIMATE. VERIFY LOCATION OF EXISTING UTILITIES IN LINE OF CONSTRUCTION PRIOR TO BEGINNINGCONSTRUCTION BY EXCAVATING AHEAD OF WORK. CONTRACTOR IS RESPONSIBLE FOR NOTIFYING ALL UTILITY COMPANIES LOCATED IN THE WORK ZONE DURINGCONSTRUCTION AT LEAST 48 HOURS PRIOR TO EXCAVATION.5. THERE MAY BE BURIED UTILITIES NOT SHOWN ON THE PLANS THAT ARE IN LINE OF CONSTRUCTION.6. PROTECT ALL UTILITIES FROM DAMAGE DURING CONSTRUCTION UNLESS OTHERWISE SHOWN ON THE PLANS. ANY UTILITIES DAMAGED DUE TO THE CONTRACTOR'SNEGLIGENCE SHALL BE REPAIRED AT THE CONTRACTOR'S EXPENSE.7. REPAIR ALL CUT OR OTHERWISE DAMAGED SUBSURFACE DRAINAGE TILES OR PIPES WITH SAME SIZE PIPE. LAY ON GRANULAR FILL FROM BOTTOM OF TRENCH TO 1 FOOTOVER TOP OF PIPE. ENSURE TILE OR PIPE NOT PLUGGED PRIOR TO BACKFILL.8. CONTRACTORS SHALL PROVIDE SANITARY FACILITIES FOR THEIR WORKFORCE.9. CONTRACTOR IS RESPONSIBLE FOR MAKING ARRANGEMENTS FOR AND PAYING FOR UTILITIES USED DURING CONSTRUCTION, UNLESS OTHERWISE SPECIFIED.10. CONTRACTOR SHALL NOTIFY PROPERTY OWNERS 48 HOURS IN ADVANCE IF ACCESS TO PROPERTY WILL BE INTERRUPTED. ACCESS TO PRIVATE PROPERTY SHALL BEMAINTAINED AT ALL TIMES FOR EMERGENCY VEHICLES. PROVIDE PEDESTRIAN ACCESS TO RESIDENCES AND BUSINESSES DURING THE CONSTRUCTION PERIOD.11. SCHEDULE WORK TO MINIMIZE INTERRUPTION OF CONTINUOUS SERVICE OF ALL UTILITY SYSTEMS. DO NOT ALLOW ANY UTILITY SYSTEM SERVICE TO BE INTERRUPTEDWITHOUT PRIOR APPROVAL OF THE AFFECTED PARTY(S) OR JURISDICTION.12. SCHEDULE WORK TO ENSURE THAT UTILITY SERVICE IS RESTORED DURING NON-WORKING HOURS AND DURING WEEKENDS. PROVIDE TEMPORARY CONNECTIONS ANDSERVICE CONNECTIONS AS REQUIRED TO PROVIDE UTILITY SERVICE DURING THESE PERIODS. COST FOR PROVIDING TEMPORARY SERVICES AND CONNECTIONS ISINCIDENTAL TO CONSTRUCTION.13. CONTRACTOR SHALL KEEP ALL WORK WITHIN RIGHT-OF-WAYS AND EASEMENTS PROVIDED.14. ALL PROPERTY SECURED BY THE CONTRACTOR FOR STOCKPILING OR STORAGE OF MATERIALS SHALL BE RESTORED TO ITS ORIGINAL CONDITION AFTER COMPLETION OFWORK, AT THE CONTRACTOR'S EXPENSE.15. CONTRACTOR SHALL PROVIDE TEMPORARY TRAFFIC CONTROL IN ACCORDANCE WITH SPECIFICATION SECTIONS 1070 2.06 AND 8030, AND THE JURISDICTIONREQUIREMENTS. SEE TRAFFIC CONTROL PLAN SHEETS FOR TEMPORARY TRAFFIC CONTROL INFORMATION IN ADDITION TO THE SPECIFICATIONS. TRAFFIC CONTROLSHALL CONSIST OF ALL BARRICADES, SIGNAGE AND LIGHTS AS NECESSARY TO PROTECT VEHICLES AND PEDESTRIAN TRAFFIC IN ACCORDANCE WITH THESPECIFICATIONS. CONTRACTOR SHALL MAINTAIN, CLEAN AS NECESSARY AND REPLACE DAMAGED TRAFFIC CONTROL DEVICES THROUGHOUT DURATION OF PROJECT.SIDEWALK PATHS DISRUPTED BY CONSTRUCTION SHALL BE CLOSED TO PEDESTRIANS IN ACCORDANCE WITH IOWA DEPARTMENT OF TRANSPORTATION (IDOT) STANDARDROAD PLAN TC-601.16. CONTRACTOR IS RESPONSIBLE FOR NOTIFICATION OF EMERGENCY SERVICES AND SCHOOL DISTRICT OF ROAD CLOSURES AND DETOURS.17. CONSTRUCTION SURVEY WILL BE PROVIDED BY THE JURISDICTION IN ACCORDANCE WITH SECTION 11,010 OF THE SPECIFICATIONS. CONTRACTOR SHALL PROTECT ANDPRESERVE ALL STAKES, POINTS AND MARKS SET BY THE JURISDICTION. WHERE SAID STAKES, POINTS AND MARKS ARE ALTERED OR DESTROYED BY THE CONTRACTOR,COST OF REPLACEMENT SHALL BE IN ACCORDANCE WITH SECTION 1050 1.10 C. OF THE SPECIFICATIONS AND BORNE BY THE CONTRACTOR.18. CONTRACTOR SHALL MAINTAIN POSTAL SERVICE IN ACCORDANCE WITH SECTION 11,030 OF THE SPECIFICATIONS. CONTRACTOR SHALL MAINTAIN SOLID WASTECOLLECTION IN ACCORDANCE WITH SECTION 11,030 OF THE SPECIFICATIONS. MAINTENANCE OF POSTAL SERVICE AND SOLID WASTE COLLECTION IS INCIDENTAL TOCONSTRUCTION.19. MAIL BOXES IN LINE OF CONSTRUCTION SHALL BE REMOVED, SALVAGED, AND STORED BY THE CONTRACTOR. TEMPORARY MAIL SERVICE SHALL BE AS DESCRIBED INNOTE ABOVE. UPON COMPLETION OF GRADING AND SURFACE RESTORATION OPERATIONS; REPLACE MAIL BOXES AT THEIR PREVIOUS LOCATIONS AND TO HEIGHT ASAPPROVED BY THE LOCAL POSTMASTER. REMOVAL AND RESETTING OF MAIL BOXES IS INCIDENTAL TO CONSTRUCTION.20. SIGNS OWNED BY THE JURISDICTION: SIGNS AND SIGN POSTS IN LINE OF CONSTRUCTION SHALL BE REMOVED, SALVAGED AND RESET BY THE CONTRACTOR; AT THEORIGINAL SIGN LOCATION UNLESS APPROVED OTHERWISE BY THE JURISDICTION. SIGN REMOVAL, SALVAGE AND RESETTING IS INCIDENTAL TO CONSTRUCTION.21. CONTRACTOR SHALL PREVENT ENTRY OF MUD, DIRT, DEBRIS AND OTHER MATERIALS INTO NEW AND EXISTING SEWERS. SHOULD MUD, DIRT, DEBRIS OR OTHER MATERIALENTER NEW OR EXISTING SEWERS; THE CONTRACTOR SHALL CLEAN AT NO COST TO THE JURISDICTION.22. REMOVE EXISTING SURFACING IN NEAT, UNIFORM LINES PARALLEL TO TRENCH CONSTRUCTION. REPLACE SURFACING AS DESCRIBED ON THE PLANS AND SPECIFIED.PROTECT ALL OTHER SURFACING FROM DAMAGE DUE TO CONSTRUCTION ACTIVITIES; REPLACE DAMAGED SURFACING AT NO ADDITIONAL COST TO JURISDICTION.23. DO CLEANUP AND SURFACE RESTORATION AND REPLACEMENT AS WORK PROGRESSES.24. CONTRACTOR SHALL DISPOSE OF ALL CONSTRUCTION DEBRIS EXCESS EXCAVATED MATERIAL. DISPOSAL SHALL MEET FEDERAL, STATE AND LOCAL SAFETY, HEALTH ANDENVIRONMENTAL REQUIREMENTS. DISPOSAL WORK IS INCIDENTAL TO CONSTRUCTION. THE JURISDICTION WILL NOT PROVIDE A DISPOSAL SITE UNLESS NOTEDOTHERWISE ON THE PLANS.25. FERTILIZE, SEED AND MULCH ALL AREAS DISTURBED BY CONSTRUCTION IN ACCORDANCE WITH SECTION 9010 OF THE SPECIFICATIONS. USE TYPE 1 (PERMANENT LAWNMIXTURE) FOR ALL MAINTAINED RESIDENTIAL. SEE PLANS FOR SEEDING METHOD REQUIRED (CONVENTIONAL OR HYDRAULIC). PAYMENT FOR FERTILIZING, SEEDING ANDMULCHING WILL BE BASED ON LUMP SUM PRICE BID - NO MEASUREMENTS WILL BE MADE. PAYMENT ALSO INCLUDES FURNISHING WATER AND OTHER CARE DURING THECARE PERIOD, AS SPECIFIED. ACCEPTANCE OF SEEDING WORK WILL BE IN ACCORDANCE WITH SPECIFICATION 9010 3.10 A.CONCRETE PAVEMENTS GENERAL NOTES1. CONCRETE MIX SHALL BE IDOT C-3WR OR C-4WR FOR ALL PAVEMENT, DRIVEWAYS AND SIDEWALKS. USE OF FLY ASH AND GROUND GRANULATED BLAST FURNACE SLAG(GGBFS) SHALL BE IN ACCORDANCE WITH SPECIFICATION SECTION 7010 2.02 C.2. COARSE AGGREGATE FOR CONCRETE MIXES SHALL BE CLASS 3 DURABILITY UNLESS APPROVED OTHERWISE. COARSE AND FINE AGGREGATES SHALL BE FURNISHEDFROM AN APPROVED SOURCE IN ACCORDANCE WITH THE SPECIFICATIONS. METHOD OF ACCEPTANCE FOR AGGREGATES SHALL BE BY QUALITY CERTIFICATIONFURNISHED BY THE CONTRACTOR.3. CONTRACTOR SHALL BE RESPONSIBLE PARTY FOR ALL TESTING AND RE-TESTING OF P.C. CONCRETE AS REQUIRED BY THE SPECIFICATIONS INCLUDING; AIR CONTENT,SLUMP, AND CYLINDERS.4. CERTIFIED PLANT INSPECTION IS NOT REQUIRED FOR ANY CONCRETE MIX PRODUCTION.5. ALL PAVEMENT JOINTS SHALL BE SEALED AS SPECIFIED. DO NOT SEAL DRIVEWAY OR SIDEWALK JOINTS.6. PROVIDE CONCRETE WASHWATER CONTAINMENT IN ACCORDANCE WITH SECTION 11,050 OF THE SPECIFICATIONS. NO SEPARATE PAYMENT WILL BE MADE FORCONCRETE WASHWATER CONTAINMENT - THIS WORK IS INCIDENTAL TO CONSTRUCTION.7. USE OF A PAVING MACHINE IN ACCORDANCE WITH SUDAS SECTION 7010 WILL BE REQUIRED FOR ALL 27' NOMINAL WIDTH PAVEMENT.UTILITY CONTACT INFORMATIONUTILITYORGANIZATION/REPRESENTATIVEPHONESANITARY SEWEROSKALOOSA MUNICIPAL WATER DEPARTMENT - KELLY HEFNER641-673-8476STORM SEWERCITY OF OSKALOOSA PUBLIC WORKS - SEAN MURPHY641-673-7472WATEROSKALOOSA MUNICIPAL WATER DEPARTMENT - KELLY HEFNER641-673-8476WATERNATURAL GAS (DISTRIBUTION)ELECTRICCOMMUNICATIONSMAHASKA RURAL WATER - RANDAL PLEIMA641-673-8851MID AMERICAN ENERGY - JOHN BIXLERMID AMERICAN ENERGY - JASON SANDIFER641-777-5930GAS EMERGENCY: 800-595-5325641-820-0790ELECTRIC EMERGENCY: 800-799-4443MAHASKA COMMUNICATION GROUP - JUSTIN SHIPMAN641-295-7067COMMUNICATIONSIOWA COMMUNICATIONS NETWORK - DAVE AUGSPURGER515-725-4604TELEVISIONMEDIACOM - NICK RENFREW845-637-9903TELEPHONELUMEN - MATTHEW HOLUB319-206-9094ESTIMATED PROJECT QUANTITIESItem No. Bid Item No.Bid Item Description12010-E Excavation, Class 10EstimatedUnit QuantityRemarksClass 10 Excavation was calculated by the average end area method with cross sections spaced amaximum of 50 feet, resulting in a total cut quantity of 347 Cubic Yards (CY). Based on a shrinkage factorof 30%, it is estimated there will be approximately 25 CY of fill required, resulting in an excess ofCY347approximately 322 CY. Contractor will be required to dispose of excess excavated material at a sitesecured by the contractor. Payment for excavation will be based on plan quantity unless a change inhorizontal or vertical alignment is made and approved by the Jurisdiction. Item also includes stripping(minimum 8" lift), stockpiling, and respreading of topsoil on site. Top 6" of respread topsoil shall beprepared for seeding per specification. No separate payment will be made for handling of topsoil.22010-G Subgrade PreparationSY 1,39632010-J Subbase, GranularSY1,396Granular subbase material shall be Class A crushed stone in accordanIcoewawDitOh T Gradation No. 11.See typical sections on sheet B.01.42010-M Compaction TestingLS155020-G Valve Box ExtensionEA166010-E-1 Manhole Adjustment, MinorEA1Item includes removal and replacement of all existing adjusting rings (approximately 24" total) and a newSW-601 Type B casting.77010-A Pavement, PCC, 7" ThickSY 1,215 See typical pavement section on Sheet B.01.87010-I PCC Pavement Samples and TestingLS197030-A-3 Removal of DrivewaySY236107030-E Sidewalk, PCC, 4" ThickSY142117030-E Sidewalk, PCC, 6" ThickSY4127030-G Detectable WarningSF8137030-H-1 Driveway, Paved, PCC, 6" ThickSY256147040-H Pavement RemovalSY 1,372157999-A Temporary Granular Surfacing168030-A Temporary Traffic ControlTON150Item is for temporary granular surfacing to be placed in temporary residential parking area. See sheetB.01.LS1 See Temporary Traffic Control map and details on sheet B.01.17 9010-A or B Conventional or Hydraulic Seeding; Seeding, Fertilizing, and MulchingLSNo measurement for payment will be made for this item. Payment will be based on Lump Sum price bid.1 All areas disturbed by construction shall be fertilized, seeded, and mulched in accordance with theSpecifications. Use Type 1 Permanent Lawn Mixture.1811,020-A MobilizationLS1DRIVEWAY TABULATIONPRELIMINARYSHEET TITLEGENERAL NOTES &ESTIMATEDQUANTITIESSCALE:AS NOTEDDRAWN BY:ACFAPPROVED:ACFUTILITY QUALITY LEVELS: BASED ON CI/ASCE 38-02REVISIONS:11/25/25: SIDEWALK REVUTILITY QUALITY LEVEL A: PRECISE HORIZONTAL AND VERTICAL LOCATION OF UTILITIES OBTAINED BYTHE ACTUAL EXPOSURE (OR VERIFICATION OF PREVIOUSLY EXPOSED AND SURVEYED UTILITIES) ANDSUBSEQUENT MEASUREMENT OF SUBSURFACE UTILITIES, USUALLY AT A SPECIFIC POINT.UTILITY QUALITY LEVEL B: INFORMATION OBTAINED THROUGH THE APPLICATION OF APPROPRIATESURFACE GEOPHYSICAL METHODS TO DETERMINE THE EXISTENCE AND APPROXIMATE HORIZONTALPOSITION OF SUBSURFACE UTILITIES. QUALITY LEVEL B DATA SHOULD BE REPRODUCIBLE BY SURFACEGEOPHYSICS AT ANY POINT OF THEIR DEPICTION.DATE:UTILITY QUALITY LEVEL C: INFORMATION OBTAINED BY SURVEYING AND PLOTTING VISIBLEABOVE-GROUND UTILITY FEATURES AND BY USING PROFESSIONAL JUDGMENT IN CORRELATING THISINFORMATION TO QUALITY LEVEL D INFORMATION.MAY 21, 2025UTILITY QUALITY LEVEL D: INFORMATION DERIVED FROM EXISTING RECORDS OR ORAL RECOLLECTIONS.PROJECT NO.:NOTE: THERE MAY BE ADDITIONAL UNDERGROUND UTILITIES THAT ARE NOT SHOWN ON THIS DRAWING.EXAMPLES:5024378EXISTING UTILITY LINE - QUALITY LEVEL AEXISTING UTILITY LINE - QUALITY LEVEL BEXISTING UTILITY LINE - QUALITY LEVEL CEXISTING UTILITY LINE - QUALITY LEVEL DSHEET NO.:A.02PRELIMINARYMANHOLE CASTING - PAVEMENT REINFORCEMENTTYPICAL PAVEMENT SECTIONTEMPORARY TRAFFIC CONTROL MAP, NOTES, AND LEGENDTEMPORARY TRAFFIC CONTROL NOTES1. TEMPORARY TRAFFIC CONTROL AND SIGNING IS THE RESPONSIBILITY OF THE CONTRACTOR. ALLTRAFFIC CONTROL DEVICES SHALL BE FURNISHED, ERECTED, MAINTAINED, MOVED AND REMOVED BYTHE CONTRACTOR IN ACCORDANCE WITH THE SPECIFICATIONS.7TH AVENUE WESTTEMPORARY RESIDENTIALAPARKING AREA. SEENOTES TO RIGHT.TEMPORARYCONSTRUCTIONEASEMENTPROJECT AREA8TH AVENUE WESTC2. CONTRACTOR WILL BE REQUIRED TO WASH AND MAINTAIN SIGNS AS REQUIRED AND DIRECTED BY THEENGINEER. COST FOR THIS WORK IS INCIDENTAL TO CONSTRUCTION AND SHALL BE INCLUDED IN LUMPSUM PRICE FOR TEMPORARY TRAFFIC CONTROL.3. ANY REQUESTS FOR CHANGES TO THE TEMPORARY TRAFFIC CONTROL PLANS SHALL BE SUBMITTED INWRITING TO THE JURISDICTION. CHANGES TO THE TEMPORARY TRAFFIC CONTROL PLAN SHALL NOT BEMADE UNLESS APPROVED BY THE JURISDICTION.4. THE PROPOSED SIGNING MAY BE MODIFIED TO MEET THE FIELD CONDITIONS, PREVENT OBSTRUCTIONSAND TO ACCOMMODATE CONSTRUCTION SCHEDULING UPON APPROVAL OF THE JURISDICTION. NOT SHEET TITLEALL REQUIRED SIGNS MAY BE SHOWN ON THE TEMPORARY TRAFFIC CONTROL PLAN.TYPICAL SECTION,5. PERMANENT TRAFFIC CONTROL SIGNS THAT CONFLICT WITH SPECIFIC LAYOUTS SHOWN ON THESEPLANS ARE TO BE COVERED AS DIRECTED BY THE ENGINEER.DETAILS, & TRAFFICCONTROL PLAN6. CONTRACTOR SHALL ERECT ALL WARNING SIGNS ON STEEL OR WOODEN POSTS AS SPECIFIED.PORTABLE MOUNTINGS FOR WARNING SIGNS MAY BE USED FOR TEMPORARY INSTALLATION OF LESSTHAN 4 CALENDAR DAYS.SCALE:7. THE CONTRACTOR SHALL PROVIDE A 24-HOUR PHONE NUMBER FOR THE CONTRACTOR'S RESPONSIBLEPARTY TO BE CONTACTED REGARDING TRAFFIC CONTROL ISSUES.8. THE CONTRACTOR SHALL COORDINATE TRAFFIC CONTROL WITH OTHER PROJECTS IN THE AREA.NO SCALEATEMPORARY TRAFFIC CONTROL MAPNO SCALE9. THE CONTRACTOR SHALL NOTIFY ALL LOCAL AUTHORITIES INCLUDING: FIRE/RESCUE SERVICES, LAWENFORCEMENT, AND LOCAL SCHOOL SYSTEM 48 HOURS IN ADVANCE OF INITIATING SIGNIFICANTCHANGES TO TRAFFIC CONTROL.10. WHERE POSSIBLE, ALL POST MOUNTED SIGNS SHALL BE PLACED AT LEAST 2' FROM THE EDGE OFPAVEMENT OR SHOULDER OF THE ROAD.11. 8TH AVENUE WEST WILL BE CLOSED FOR THE DURATION OF CONSTRUCTION. PROVIDE CHANNELIZINGDEVICES ALONG PAVEMENT REMOVAL LIMITS IN SOUTH M STREET IN ACCORDANCE WITH SUDASFIGURE 8030.102.12. TEMPORARY RESIDENTIAL PARKING AREA:12.1. PRIOR TO PAVEMENT REMOVAL IN 8TH AVENUE WEST, CONTRACTOR SHALL CONSTRUCTTEMPORARY RESIDENTIAL PARKING AREA ALONG 7TH AVENUE WEST AS SHOWN ON PLAN TO LEFT.DRAWN BY:ACFAPPROVED:ACFREVISIONS:11/25/25: SIDEWALK REVSIGNAGE/TRAFFIC CONTROL LEGEND (LETTER AND SYMBOL DESIGNATION)12.2.CONTRACTOR SHALL STRIP TOPSOIL FROM AREA TO RECEIVE TEMPORARY GRANULARSURFACING. TOPSOIL SHALL BE STOCKPILED WITHIN THE TEMPORARY CONSTRUCTION EASEMENTSHOWN.ROADWORKAHEADAROADCLOSEDC12.3.12.4.12.5.TEMPORARY PARKING AREA SHALL BE 160' LONG AND 25' WIDE (MEASURED FROM BACK OF CURB).PARKING AREA SHALL BE CONSTRUCTED OF 6" THICK COMPACTED CLASS A GRANULARDATE:SURFACING. APPROXIMATE QUANTITY=150 TONS.CONTRACTOR SHALL INSTALL CHANNELIZING CONES TO PROTECT EXISTING UTILITY BOXES WITHINTHE TEMPORARY PARKING AREA.MAY 21, 2025FOLLOWING CONSTRUCTION OF 8TH AVENUE WEST, CONTRACTOR SHALL REMOVE GRANULARSURFACING, RESPREAD STOCKPILED TOPSOIL, GRADE TO MATCH EXISTING CONDITIONS, ANDSEED AND MULCH DISTURBED AREA AS SPECIFIED.PROJECT NO.:5024378SHEET NO.:B.018TH AVE WPRELIMINARYSHEET TITLEREMOVAL PLANSCALE:DRAWN BY:ACFAPPROVED:ACFREVISIONS:11/25/25: SIDEWALK REVDATE:MAY 21, 2025PROJECT NO.:5024378SHEET NO.:D.01PRELIMINARY8TH AVE WPROFILESCALES20'SHEET TITLEPAVEMENT PLAN& PROFILESCALE:DRAWN BY:ACFAPPROVED:ACFREVISIONS:11/25/25: SIDEWALK REVDATE:MAY 21, 2025PROJECT NO.:5024378SHEET NO.:D.02
- Commodity Codes
-
- NAICS 238990All Other Specialty Trade Contractors
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Learning Campus Sidewalk Repl...
Bid Number Bid Title Bid Type Organization Bid Issue Date Bid Close Date
City of Bettendorf
Bid Due: 7/14/2026
Low Water Crossings and Bridg...
Bid Information Bid Number 25-06-49-02 Solicitation Low Water Crossings and Bridge Demolition, Maquoketa
State Government of Iowa
Bid Due: 7/23/2026