Suwanee Creek Diversion Pump Station Expansion Project
Project Information
- Bid Title
- Suwanee Creek Diversion Pump Station Expansion Project
- Issuing Agency
- Gwinnett County
- Location
- Georgia
- Published Date
- Nov 26, 2025
- Closing Date
- Dec 16, 2025
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- BL010-26 NOT
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Suwanee Creek Diversion Pump Station Expansion Project
Buyer Contact : Brittany.Bryant@gwinnettcounty.com
Opening Date : 12/16/2025 03:00 PM EST
Addendum : 00 91 01 Addendum Number 01 (3) , BL010-26 Addendum Number 02 (1)
119
- Attachment Preview
-
CONTRACT DOCUMENTSFOR CONSTRUCTION OFSuwanee Creek DiversionPump Station ExpansionGCDWR Project No. F01469BL010-26Prepared For:Gwinnett CountyDepartment of Water Resources684 Winder HighwayLawrenceville, GA 30045Prepared By:Freese and Nichols, Inc.2180 Satellite BoulevardSuite 235Duluth, GA 30097October 202500 11 16INVITATION TO BIDGeneral NoticeThe Gwinnett County Board of Commissioners (Owner) is requesting Bids for the construction of thefollowing Project pursuant to O.C.G.A. §36-91-20:Suwanee Creek Diversion Pump Station Expansion ProjectGCDWR Project No.: F01469This Project includes the following Work:1) Replacement of the six (6) existing pumps with six (6) new dry-pit submersible typepumps2) Demolition of the existing chemical feed tank, system, and pumps and installation ofa new chemical feed tank, system, and pumps.3) Demolition of the existing seal water system.4) Rehabilitation of the existing diversion structure.5) New electrical equipment (including variable frequency drives, control panels,switchboard, motor control centers, etc.) associated with the proposed installation6) Installation of an Owner-furnished programmable logic controller (PLC).7) Demolition and expansion into the footprint of the existing chemical room to houseadditional electrical equipment. Miscellaneous structural, architectural, and othermodifications to accommodate the listed improvements.8) New flow monitoring in a gravity sewer structure downstream of the existingdiversion structure.9) New emergency back-up generator to replace the existing generator.10) HVAC and ventilation improvements to accommodate the proposed installation.11) Instrumentation and control system updates to accommodate the proposedinstallation.12) Replacement and rehabilitation of existing process piping.13) Structural improvements and replacement of the existing overhead coiling door.14) Structural improvements to allow the existing bridge crane to function at ratedcapacity.15) Replacement of existing slide gates, grating, and grinder units within the approachchannels to the wet-well. Includes structural and process changes to allow betteraccess to actuators and maintenance for these units.16) Replacement of existing hatches in multiple locations including addition of new rigidfall protection systems for these proposed hatches.17) Fence and gate relocations and improvements.18) Repaving of existing site with slope improvements for drainage.19) Gutter system improvements.20) Replacement of existing sump pumps in lower pump room.21) Passive odor control improvements at the existing diversion box structure.22) Bypass pumping of the existing facility.Suwanee Creek Diversion Pump Station ExpansionF01469October 2025Invitation to Bid00 11 16-1The Project is to be substantially complete and ready for operation within 720 days after the date whenthe Contract Times commence to run as provided in the General Conditions. The Project is to becomplete and eligible for final payment 40 days after the date for Substantial Completion.All competitive, sealed bidding shall conform to O.C.G.A. §36-91-2, -20 to -22.Obtaining Bidding DocumentsDigital versions of the bidding documents can be accessed at no cost via the Design Professional (Freeseand Nichols, Inc.) through the following website:https://fnimanager.freese.com/Select the relevant project and the potential bidder will be redirected to CivCastUSA. The potentialbidder will need to register on CivCastUSA only once. Once registered, the potential bidder willautomatically be placed on the planholders list for distribution of all notifications. Notifications to beissued periodically may include but are not limited to the following: addenda, plan-holders list, bidtabulations, additional reports, or other information relevant to bidding the Project. Only complete setswill be issued.Bidders are responsible for ensuring that a complete set of documents, as defined in Section 00 52 13“Agreement,” are used in the preparation of their Bids.Printed copies of the Contract Documents, Technical Data, and other information may be examined freeof charge, pursuant to O.C.G.A §36-91-20(4), at the following addresses:Gwinnett County Department of Financial ServicesPurchasing Division - 4th Floor Charlotte J. Nash Building75 Langley DriveLawrenceville, Georgia 30046Hours Available for Viewing: 8am-5pmPre-bid Date and Location:A non-mandatory pre-bid conference for the Project is scheduled for 10:00 AM on November 10, 2025.All interested parties are urged to attend. The Pre-bid conference will be held at the Suwanee CreekDiversion Pump Station site, 1758 Peachtree Industrial Blvd., Suwanee, GA 30024. The pre-bidconference is to be utilized by contractors and subcontractors to ask any questions in order to submit abid for this project.Instructions on Submitting Questions:Questions regarding bids should be submitted to Brittany Bryant, CPPB atBrittany.Bryant@gwinnettcounty.com no later than 3:00 P.M. local time, November 26th, 2025. Bids arelegal and binding upon the bidder when submitted.Obtain the Plan-Holders ListThe plan-holders list is available from Freese and Nichols, Inc. at the above-mentioned website.Suwanee Creek Diversion Pump Station ExpansionF01469October 2025Invitation to Bid00 11 16-2Delivery of BidsSealed Bids must be delivered to Owner as specified in Section 00 21 13 “Instructions to Bidders” nolater than 2:50 P.M. on December 11th, 2025, to be accepted. The bid opening will be virtual ONLY. Toaccess the bid opening virtually, visit the following link:(https://gwinnettgov.webex.com/gwinnettgov/j.php?MTID=m2b1b9d80896cabcef06f6f424571db95)or dial 1-408-418-9388, and enter Conference ID 2336 539 8208.Instructions to BiddersSee Section 00 21 13 “Instructions to Bidders” included in the Bidding Documents for detailedrequirements for preparing and submitting a Bid and award of the Contract.This Invitation to Bid is issued by:Gwinnett County Board of CommissionersBrittany Bryant, CPPBPurchasing Associate IIIOctober 29th, 2025END OF SECTIONSuwanee Creek Diversion Pump Station ExpansionF01469October 2025Invitation to Bid00 11 16-3
- Commodity Codes
-
- NAICS 236220Commercial and Institutional Building Construction
- NAICS 237110Water and Sewer Line and Related Structures Construction
- NAICS 237990Other Heavy and Civil Engineering Construction
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Solicitation Number: FA8533-11-R-33345 Notice Type: Solicitation Synopsis: Added: May 04, 2011 1:58 pm
Department of the Air Force
Bid Due: 10/14/2047
INVITATION TO BIDS VEHICLE: HEAVY DUTY BID REF. #04-079 #04-079 Part 2 March
City of Albany
Bid Due: 2/03/2031