PCT REEFER RACKS AND PLUGS
Project Information
- Bid Title
- PCT REEFER RACKS AND PLUGS
- Issuing Agency
- Port of Tacoma
- Location
- Washington
- Published Date
- Mar 25, 2026
- Closing Date
- Apr 27, 2026
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- 032026-1025
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
PCT REEFER RACKS AND PLUGS
Bid Number:
032026-1025
Procurement Summary:
The Northwest Seaport Alliance (NWSA) is soliciting Statements of Qualifications (SOQ) from firms interested in providing Civil and Electrical engineering services. The NWSA anticipates awarding one Professional Service contract. The period of performance of the contract is anticipated to be three (3) years from the execution of the contract, with options for renewal at the sole discretion of the NWSA, for a possible total of five (5) years.
Notes:
Question due date April 8, 2026 @ 2PM
Bids Due:
Mon, 04/27/2026 - 02:00PM
Questions Due:
Wed, 04/08/2026 - 02:00PM - Attachment Preview
-
ATTACHMENT A – INSTRUCTIONS FOR PROPOSINGNWSAREQUEST FOR QUALIFICATIONNO. 032026-1025PCT REEFER RACKS & PLUGSIssued byThe Northwest Seaport AllianceOne Sitcum PlazaP.O. Box 1837Tacoma, WA 98401-1837RFQ INFORMATIONContact:Axa Turney, Sr Contracts AdministratorEmail Addresses:procurement@portoftacoma.comPhone:253-888-4768Submittal DateApril 27, 2026 @ 2PMQuestions Due DateApril 8, 2026 @ 2PMSUBMIT ALL QUESTIONS AND SOQS VIA THE PROCUREMENT PORTAL.(LINK LOCATED ON THE LEFT SIDE OF THE PROCUREMENT WEB PAGE)Request for QualificationsNO. 032026-1025- PCT Reefer Racks & PlugsPage 1 of 12ATTACHMENT A – INSTRUCTIONS FOR PROPOSINGNWSARequest for Qualifications (RFQ) 032026-1025A. PURPOSEPCT Reefer Racks & PlugsThe Northwest Seaport Alliance (NWSA) is soliciting Statements of Qualifications (SOQ)from firms interested in providing Civil and Electrical engineering services. The NWSAanticipates awarding one Professional Service contract. The period of performance of thecontract is anticipated to be three (3) years from the execution of the contract, with optionsfor renewal at the sole discretion of the NWSA, for a possible total of five (5) years.GRANT LANGUAGEThe NWSA has been awarded the Fiscal Year 2024 Port Infrastructure DevelopmentProgram grant from the U.S. Department of Transportation Maritime Administration(MARAD) (Grant No. 693JF72540031). All work must be performed in accordance withassociated grant requirements. Therefore, the contract that results from the RFQ andvarious work packages will be subject to the Terms and Conditions of the grant. See“Attachment C” for the current Terms and Conditions dated November 21, 2025, whichmay be updated in the future. Any future updates to these Terms and Conditions will bebinding on any agreement resulting from this RFQ. Current Terms and Conditions mayalso be found online at https://www.maritime.dot.gov/grants/federal-grant-assistance/federal-grant-assistance.B. BACKGROUNDFormed in 2015, The Northwest Seaport Alliance (NWSA) is a marine cargo operatingpartnership of the ports of Tacoma and Seattle. The NWSA is the fourth-largest containergateway in North America. To learn more about the NWSA, visitwww.nwseaportalliance.com.Pierce County Terminal (PCT) is located at 4015 SR-509 N. Frontage Rd. The terminalwas expanded and reconstructed in 2005 and encompasses approximately 155 acres,including container marshalling areas, an intermodal rail yard, approximately 2,087 linearfeet of wharf with seven post-panamax gantry cranes used for servicing containervessels. Operations at PCT include wheeled/grounded container import, groundedcontainer export, and grounded empty cargo.The planned expansion includes the installation of reefer plugs, reefer racks, and powerinfrastructure to accommodate 198 additional refrigerated containers at the terminal. PCTcurrently has 654 plug-ins (reefer plugs) for refrigerated cargo containers (reefers) thatneed to be kept at a cooled temperature while staged on the port terminal. The Projectwill result in a total of 852 plug-ins. The added reefer plugs will be on racks, includingpower outlets supplying multiple refrigerated containers.The NWSA’s Standard Terms and Conditions are included with the SamplePersonal Services Agreement (Attachment B) to this RFQ. By submitting a SOQ,the Proposer represents that it has carefully read and agrees to be bound by theNWSA’s Standard Terms and Conditions. Identify during the question submittaland response period, any sections you consider onerous, clarify why you considerRequest for QualificationsNO. 032026-1025- PCT Reefer Racks & PlugsPage 2 of 12ATTACHMENT A – INSTRUCTIONS FOR PROPOSINGthese sections onerous, propose alternative language and describe why it is in theNWSA’s best interests to adopt the alternative language.SOQs submitted with altered or conditioned Terms and Conditions without priorwritten agreement from the NWSA will be considered non-responsive and notconsidered for evaluation.Proposers submit SOQs understanding all contract terms and conditions aremandatory. Response submittal is agreement to the Contract without exception.The NWSA reserves the right to negotiate changes to submitted SOQs and tochange the NWSA's otherwise mandatory Contract form during negotiations. If theProposer is awarded a contract and refuses to sign the attached Contract form, theNWSA may reject the Proposer from this and future solicitations for the same work.Under no circumstances shall Proposer submit its own boilerplate of terms andconditions.C. SCOPE OF SERVICESThe NWSA is seeking a prime consultant to provide civil and electrical engineeringservices to support the project and fulfill the Build America Buy America (BABA)requirements. The consultant will produce bid-ready design drawings and technicalspecifications. The consultant will also be expected to provide responses to agencycomments during the permitting process to support their design. During the bidding andconstruction phases, the consultant will be expected to provide technical assistance inthe form of responding to RFI’s, advising on change order proposals, attending weeklyconstruction progress meetings, verifying construction complies with design andproducing record drawings from the contractor’s red-lined as-builts.The work may include, but is not limited to, the following tasks:Design Phase• Civil/Electrical engineering design• Construction Cost estimates• Technical specifications• Preparing draft and final bid documentsBidding Phase• Responses to questions• Preparation of addendums• Attending the pre-bid meetingConstruction Phase• Respond to RFIs• Submittal and change order review• Issue resolutionRequest for QualificationsNO. 032026-1025- PCT Reefer Racks & PlugsPage 3 of 12ATTACHMENT A – INSTRUCTIONS FOR PROPOSING• Verify construction complies with design• Create Record DrawingsD. DELIVERABLESDesign Phase• Field/site investigation reports• Permit review drawings• Progress milestone packages at 30%, 60%, 90% and 100% to include:o Construction Drawingso Engineer’s Probable Cost Estimateo Technical specificationsBidding Phase• Issued for Bid drawings and technical specifications• Responses to technical questions submitted during the advertisement andprovide addendums as necessaryConstruction Phase• RFI, Change Order and Submittal review• Issue resolution• Preparation of record drawingsE. QUALIFICATIONSThe ideal consulting firm will have experience working with marine facilities andproficiency in high and medium voltage electrical systems design. The consultant’s teammust be licensed to practice civil engineering and electrical engineering in the state ofWashington. The consultant should have experience with public works projects.F. SOQ ELEMENTS & EVALUATION CRITERIASOQs should present information in a straightforward and concise manner, whileensuring complete and detailed descriptions of the Vendor (to include the prime, key teammembers, and major sub-consultants) and the team’s ability to meet the requirementsand provide the requested services of this RFQ. Emphasis will be on completeness ofcontent. The written SOQs should be prepared in the same sequential order as outlinedbelow.SOQs are limited to 10 numbered pages (8 ½ by 11 inch) excluding the cover letter andall appendices. All pages shall be in portrait orientation with 1-inch (1”) margins. Font sizeshall be 10 point or larger. SOQs that do not follow this format may be rejected. Submittalsneed to be limited to 9 MB in total size.The cover letter shall include the RFQ Number & Title in the subject line, and the Name,Title, Email Address, Phone Number, and current Address of the submitting team. SOQ’sRequest for QualificationsNO. 032026-1025- PCT Reefer Racks & PlugsPage 4 of 12ATTACHMENT A – INSTRUCTIONS FOR PROPOSINGthat do not follow this format may be rejected. The cover letter shall include the followinginformation (even if the answer is None):• Describe any claim submitted by any client against the prime firm within the pasttwo (2) years related to the professional services provided by the firm or its keypersonnel. For purposes of this request, claim means a sum of money in disputein excess of 10% of the firm’s fee for the services provided.• Any real or perceived conflicts of interest for team members, inclusive of the prime,sub-consultants, and key team members.SOQs are to address criteria #1 (Qualifications and Experience) and criteria #2 (ProjectApproach Narrative) in the Initial Evaluation Phase. Format the SOQ in the orderpresented here with headings for each lettered item (a, b, c, etc.) outlined below:INITIAL EVALUATION PHASE1. Qualifications & Experience50 PTSa) Project Team (30 points available)• Identify the proposed team members. Include working titles, degrees,certificates and licenses. Demonstrate the team’s experience in performing therequested services and describe how the team meets or exceeds the requiredqualifications.o Resumes of the key individuals may be included as an appendix and arenot included in the total page count. Resumes are to be limited to one (1)single-sided, letter-size page. Resumes exceeding this limit will not bereviewed.o Provide an organizational chart demonstrating the relationships andhierarchy of the team described above and availability to support NWSAprojects. Identify individuals by name, position, discipline and firm. Identifykey back up personnel.o The NWSA will evaluate the experience, technical competence, andqualifications of the key personnel identified, their project specific roles andresponsibilities, and overall organization of the project team. Emphasis willbe placed on experience and expertise in performing work of similar scopeand complexity.• Demonstrate the team’s capacity to perform the work (including any specializedservices) within the time constraints identified, considering the firm’s currentand planned workload.b) Project Experience (20 points available)• Include a list of three (3) recent contracts/projects in the last five (5) years.Include a brief description of services relevant to the items listed in the Scopeof Services as performed by the key personnel. Only projects completed by keymembers of the project team will be considered.Request for QualificationsNO. 032026-1025- PCT Reefer Racks & PlugsPage 5 of 12
- Commodity Codes
-
- NAICS 115310Support Activities for Forestry
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.