6838 Bid - LA 353 Office Pod Carpet Replacement
Project Information
- Bid Title
- 6838 Bid - LA 353 Office Pod Carpet Replacement
- Issuing Agency
- Washtenaw Community College
- Location
- Michigan
- Published Date
- Mar 31, 2026
- Closing Date
- Apr 20, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
6838 Bid - LA 353 Office Pod Carpet Replacement6838 Bid - LA 353 Office Pod Carpet Replacement Instructions & Specifications 840.7 KB 03/31/2026 Bid 6838 - Attachment A - Sample Small Projects Construction Contract 177.93 KB 05/07/2025 Bid 6838 - Attachment B - General Conditions 151.16 KB 05/07/2025 Bid 6838 - Attachment C - Carpet Plans 10.12 MB 03/30/2026 - Attachment Preview
-
Washtenaw Community CollegePurchasing Department – SC Room 326Bid # 6838 LA 353 Office Pod Carpet ReplacementBid Issued On: March 31, 2026Bid Due Date: April 20th, 2026 at 2:00 p.m. EDT4800 E. Huron River DriveAnn Arbor, MI 48105-4800Phone (734) 677-5231I.GeneralINSTRUCTIONS TO BIDDERS1.1 Examination and Procurement of DocumentsA.Documents may be examined at the following locations March 31, 2026:Washtenaw Community CollegeOffice of Facilities ManagementDamon Flowers Building4800 East Huron River Dr.Ann Arbor, MI 48105B.Electronic documents will be available at the following website: Requests for Proposals andBids additional documents may be issued by the Owner and will posted on the website.Vendor is responsible for ensuring they have the most accurate documents. A site visit isrequired by Owner as a condition of Contract award.II.Execution2.1 Examination of Documents and SiteA.Bidders shall carefully examine the Contract Documents and the construction site toobtain first-hand knowledge of existing conditions.B.Successful bidder will be denied any application for extra payments for conditions whichcan be determined by visually examining the site and the Contract Documents.2.2 Pre-bid Meeting / Site VisitA.A site visit is required and bids will not be accepted from bidders who have not inspectedthe site to obtain first-hand knowledge of existing conditions.B.A pre-bid meeting will be conducted at the start of the scheduled site visit.C.Each bidder shall inspect the site and become familiar with existing conditions andlimitations of the site, means of access to the site and to work areas, relationship ofexisting and new work, and other conditions which might affect the proper performanceand completion of the work.D.No allowance will be made after bid opening for cost estimation errors attributable to anyfailure to account for existing conditions and/or consider of any and all limitations on or ofthis scope of work.E.Successful bidder will be denied any application for extra payments for conditions whichcan be determined by visually examining the site.F.Bidder’s representative shall report to the Owner’s Representative and register his name,phone number, and name of the company, signing in as verification of his site visit.Page 1 of 12Washtenaw Community CollegePurchasing Department – SC Room 326Bid # 6838 LA 353 Office Pod Carpet ReplacementBid Issued On: March 31, 2026Bid Due Date: April 20th, 2026 at 2:00 p.m. EDT4800 E. Huron River DriveAnn Arbor, MI 48105-4800Phone (734) 677-5231G.The scheduled site visit is as follows:Date:Time:Location:Tuesday, April 7th, 20269:00 a.m. EDTLA 353Washtenaw Community College, Ann Arbor, MIRoom Locator:https://www.wccnet.edu/visit/room-locator/la.phpH.The Owner is not obligated to offer any other times to conduct site visits.I.Any figured dimensions shown on the Contract Documents are for reference purposesonly. The Contractor is required to verify and confirm all dimension in the field and reportany discrepancies to the Owner’s Representative immediately. Contractor’s request foradditional payment, additional time, or reconsideration of their bid will be denied if theclaim is based on reliance on the figured dimensions shown on the Contract Documentsonly.Page 2 of 12Washtenaw Community CollegePurchasing Department – SC Room 326Bid # 6838 LA 353 Office Pod Carpet ReplacementBid Issued On: March 31, 2026Bid Due Date: April 20th, 2026 at 2:00 p.m. EDT4800 E. Huron River DriveAnn Arbor, MI 48105-4800Phone (734) 677-52312.3 Questions, Interpretations, and AddendaA.Should any bidder find discrepancies between the site markings and the Project Manual,or be in doubt as to their exact meaning, he should notify the Owner at once. The Ownermay then, at his option, issue Addenda clarifying the same to all bidders.B.The Owner will not be responsible for oral instructions or for the Contractor’smisinterpretations of the Contract Documents.C.Questions must be directed to Susan Pulice, Purchasing Agent at spulice@wccnet.edu.All communication should be directed to the Purchasing Department. Vendor should NOTcontact any department directly with questions. All questions must be submitted by04/08/2026 at 2:00 p.m. EDT. All emails must reference the bid number and title. Allquestions received by the deadline date will be answered and posted to the WCC Budget& Purchasing website Requests for Proposals and Bids by 04/14/2026 at 2:00 p.m. EDT.2.4 Bid Security, Bonds, and InsuranceA.A Bid Bond is required in the amount of five percent (5%) of the total bid, minimum, andshall be enclosed with the Bid Proposal, for all base bids categories in excess of$50,000.00.B.Performance Bond and Payment Bond requirements are described in the General and/orSupplementary Conditions and are one hundred percent (100%) of the total bid,minimum, for all bids in excess of $50,000.00.C.Insurance requirements are described in the General and Supplementary Conditions.2.5 Modification and WithdrawalA.Proposals may be withdrawn and/or changed any time prior to the bid opening.B.Proposals may not be withdrawn or changed after the bid opening time and shall bedeemed a firm offer continuing for a minimum of ninety (90) calendar days.C.Bids received after the time and date of the bid opening will not be considered forContract award.2.6 Receipt of BidsA.All bids must be received by the WCC Purchasing Department via email pur@wccnet.eduon or before the date and time as specified. Late bids will not be considered. Telephonebids will not be accepted. If you have any questions concerning this bid, please do nothesitate to contact the WCC Purchasing Department.B.Bids will be received by the Purchasing Department of Washtenaw Community Collegeuntil 2:00 p.m. EDT, April 20th, 2026. The public opening for Bid 6838 LA 353 Office PodCarpet Replacement will be held electronically via the link below; attendance is optional.Public Opening – Bid 6838 LA 353 Office Pod Carpet ReplacementApril 20th, 2026 at 2:30 p.m. EDTJoin Zoom Meetinghttps://us05web.zoom.us/j/81980392523?pwd=6b9YsHXk42BukcH2I7CJfDH6ARUg9i.1Page 3 of 12Washtenaw Community CollegePurchasing Department – SC Room 326Bid # 6838 LA 353 Office Pod Carpet ReplacementBid Issued On: March 31, 2026Bid Due Date: April 20th, 2026 at 2:00 p.m. EDTMeeting ID: 819 8039 2523Passcode: 1A7eRm4800 E. Huron River DriveAnn Arbor, MI 48105-4800Phone (734) 677-5231C.Contractor shall complete, sign, and submit the Bid Proposal Form and WashtenawCommunity College Contractor Responsibility Form as a condition of Contract award.2.7 Codes, Ordinances, Regulations, Etc.A.All labor and materials shall be furnished and installed in strict accordance with the latestto-bid-date applicable codes, ordinances, and regulations of any and all governing bodiesthat have jurisdiction over this project.B.If the quality of the labor and materials required by the Drawings and Project Manualexceeds the requirements of the applicable codes, ordinances, and regulations, theDrawings and Project Manual shall take precedence.C.If the quality of the labor and materials required by the applicable codes, ordinances, andregulations exceed the requirements of the Drawings and Project Manual, then theapplicable codes, ordinances, regulations, etc. shall take precedence.2.8 Subcontractors and Material SuppliersA.The successful bidder shall submit to the Owner within 24 hours after Notice of Award, acomplete and final list of all sub-contractors, all material suppliers, and allsuperintendents (general construction and principal sub-contractors) he proposes toengage on the work. Subcontracts and material contracts shall not be awarded unlessand until they have been approved by the Owner. Superintendents (primary contractorsand principal sub-contractors) shall not be changed during the construction on this projectwithout the Owner’s prior approval in writing.B.Names of proposed principal sub-contractors must be listed on the Bid Proposal Form.2.9 Award of ContractA.Material proposals to be used for the completion of work, the competency, solvency,reputation, and responsibility of the bidders, start/completion/duration times, and otherissues deemed relevant by the Owner and the Engineer will be considered. Allresponsible bidders will receive due consideration before the awarding of this contract.B.In the reception of proposals for the Work, the Owner incurs no obligation to accept thelowest priced proposal.C.The right to accept or reject any and all bids is reserved by the Owner.D.The Owner reserves the right to require testimony or legal documents pertaining to thequalifications of a Contractor.E.If applicable, the Owner may award to multiple vendors if it is the best interest of theCollege.III. Requirements3.1 Proof of Insurance - shall be maintained and a copy shall be provided to the College. Nochanges are permitted in the insurance coverage unless agreed to in writing by the College.Insurance shall be maintained for the following coverages in the amounts stated below.Page 4 of 12Washtenaw Community CollegePurchasing Department – SC Room 326Bid # 6838 LA 353 Office Pod Carpet ReplacementBid Issued On: March 31, 2026Bid Due Date: April 20th, 2026 at 2:00 p.m. EDT4800 E. Huron River DriveAnn Arbor, MI 48105-4800Phone (734) 677-52311.Commercial general liability insurance (occurrence form) with respect to the premises,including contractual and products/completed operations coverages. The limits of liabilityare not to be less than $1,000,000 combined single limit of bodily injury and propertydamage per occurrence and $2,000,000 combined single limit of bodily injury andproperty damage annual aggregate.2.Automobile liability insurance with limits not less than $1,000,000 combined single limit ofbodily injury and property damage per accident. Statutory workers’ compensationemployer’s liability.3.Umbrella or excess liability with limits not less than $2,000,000 per occurrence andaggregate.4.Professional liability insurance. Specify amounts carried.3.2 Contract Terms and Conditions – The awarded Contractor will be required to sign a standardcontract for the work to be performed per this bid. Sample contract is attached. (Attachment A –Sample Small Project Construction Contract).IV. Bid Scope4.1 All work shall adhere to all specifications as outlined in the Contract Documents and BidDrawings. It is reasonably expected that the completion of this project will be on or beforeJune 30th, 2026.4.2 General RequirementsA.Contractor shall be aware of the milestone schedule durations for this project. Thecontractor shall provide a schedule/workplan on obtaining the necessary permits,materials, procurement of long-lead items, to begin work and complete the work asscheduled for review by the Construction Manager at the Post-Bid Conference.B.Provide barricades, including shoring and fencing required to maintain required safetyregulations as defined by OSHA.C.Coordinate and adhere to all State and local building codes relative to this Contractor'swork. This Contractor is to obtain and pay for all special permits associated with thiscategory.D.On an on-going basis all identifiable trash or debris is to be cleaned up by the tradecontractor who created it on a daily basis.E.Laydown area is limited Contractor will move materials at no cost to Owner if impedingprogress of the project.F.This Contractor MUST comply with MI-OSHA requirements for this work. This will beclosely monitored.4.3 Scope of WorkThe work of this bid category includes but is not limited to providing all labor, equipment, materials,scaffolding, hoisting and incidentals to complete the work in accordance with the specifications, drawingsand applicable codes. All work is to be performed as shown on the plans and specified herein.Page 5 of 12
- Commodity Codes
-
- NAICS 236220Commercial and Institutional Building Construction
- NAICS 238330Flooring Contractors
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Street Pole Banner Install & ...
Bid Number: 2026-017-DPS Bid Title: Street Pole Banner Install & Removal Services Category:
City of Westland,
Bid Due: 7/14/2026
CUSTODIAL SERVICES FOR CITY H...
Bid Number: P2125-27 Bid Title: CUSTODIAL SERVICES FOR CITY HALL, PW, TE &
City of Saginaw
Bid Due: 7/07/2026